context, phase, task, total_tasks, status, last_updated
context phase task total_tasks status last_updated
phase 04-shared-lists-live-sync null null ready_to_plan 2026-06-08T01:52:24.365Z

<current_state> Phase 4 (Shared Lists + Live Sync) — discussion complete, entry gate cleared, ready to plan. Nothing is mid-edit. The working tree is clean and this is a deliberate stopping point between discuss-phase and plan-phase.

  • 04-CONTEXT.md is written and committed (18 decisions, D-01..D-18).
  • The Phase 4 entry gate (SSE-over-Pangolin smoke test, D-14 / issue #1034) is CLEARED — verified live this session and recorded in the gate docs. No infra precondition remains.
  • No PLAN.md exists yet for Phase 4. </current_state>

<completed_work>

This session:

  • Ran /gsd-discuss-phase 404-CONTEXT.md + 04-DISCUSSION-LOG.md (commit 05e1c9e).
  • Executed the SSE-over-Pangolin smoke test live over familysync-dev.bergerhouse.net: ~6 min hold, 35 heartbeats (id 0→34) at ~10s, incremental delivery (buffering off), no cut → PASS.
  • Recorded the PASS via quick task 260607-u8o: updated 01-HUMAN-UAT.md item 4 and 03-GATE2-RESULTS.md Part C to PASS; struck the entry-gate blocker in STATE.md (commit 9ee5906).
  • Saved project memory: design for N family members (not hard-coded two). </completed_work>

<remaining_work>

  • Next: /gsd-plan-phase 4 (consumes 04-CONTEXT.md).
  • Optional before/after planning: /gsd-ui-phase 4 — lists UI design contract (ROADMAP UI hint: yes).
  • Then execute Phase 4 plans. </remaining_work>

<decisions_made>

All locked in 04-CONTEXT.md (read it before planning). Highlights for the planner:

  • Sharing: default-shared lists with a per-list private toggle; list_shares join table (member-count-agnostic, N-member-ready); SSE fan-out scoped to who can see a list (private lists must NOT broadcast to everyone).
  • Items: checked items sink to a completed section; confirm-on-delete for lists only (reuse DeleteConfirmationDialog).
  • Live feel/conflicts: optimistic UI; per-field PATCH + per-field last-write-wins (bounded — NO CRDT); delete-wins.
  • Reconnect: full refetch on reconnect; capped-backoff then a "updates paused" indicator; React Query refetchInterval polling fallback.
  • Ordering: string-based fractional index (NOT raw floats, NOT integer-renumber); animate remote reorders; last-write-wins settle.
  • Nav: bottom tab bar + react-router (real URLs, for Phase 5 push deep-links). No router today.
  • Project principle: design for N family members, not hard-coded two.
  • Deferred (out of scope): anonymous public-URL list sharing; per-recipient picker UI. </decisions_made>
- None. The entry gate that previously blocked the build is cleared.

Required Reading (in order)

  1. .planning/phases/04-shared-lists-live-sync/04-CONTEXT.md — locked implementation decisions; the contract for planning.
  2. apps/api/src/db/schema.ts — Drizzle table conventions for the new lists / list_items / list_shares tables.
  3. apps/api/src/routes/sse.ts — existing Hono streamSSE heartbeat pattern; the live-list stream extends it.
  4. .planning/phases/03-event-write-back-pwa-install/03-GATE2-RESULTS.md Part C — recorded SSE smoke PASS evidence.

Open Decisions for the Planner (intentionally NOT pre-decided)

  • Fan-out mechanism: in-memory EventEmitter vs Redis pub/sub. API runs as a single Node process today (no replicas); ioredis is NOT installed; redis IS in docker-compose. In-memory is the YAGNI default — planner must justify the choice against the N-member future (D-18).
  • Position-rank column type, SSE auth/middleware wiring, React Query cache-key structure.

Infrastructure State

  • Pangolin route already configured (buffering off, idle/read timeout ≥120s) and verified for SSE.
  • redis service present in docker-compose; ioredis not yet a dependency.
  • New DB tables MUST use drizzle-kit generate + migratenever push (unsafe on populated MariaDB).
  • No background processes were left running.
Clean handoff. The hard part (verifying SSE survives the tunnel) is done and recorded, so Phase 4 can be planned and built without an infra gate hanging over it. The planner should treat 04-CONTEXT.md as authoritative and focus its remaining judgment on the fan-out mechanism and the new schema (lists, list_items, list_shares) using generate+migrate.

<next_action> Start with: /clear then /gsd-plan-phase 4. </next_action>