gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone executing Completed 06-03: hasRrule server-side exposure 2026-06-10T15:20:02.358Z 2026-06-10 -- Completed 06-02: RRULE UNTIL/COUNT serialization + FREQ persistence
total_phases completed_phases total_plans completed_plans percent
17 5 42 39 29

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-07)

Core value: One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store Current focus: Phase 06 — ux-polish

Current Position

Phase: 06 (ux-polish) — EXECUTING Plan: 4 of 6 Status: Ready to execute Last activity: 2026-06-10 -- Completed 06-02: RRULE UNTIL/COUNT serialization + FREQ persistence

Progress: [█████████░] 89%

Performance Metrics

Velocity:

  • Total plans completed: 17
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
02 5 - -
03 12 - -

Recent Trend:

  • Last 5 plans: -
  • Trend: -

Updated after each plan completion | Phase 03 P01 | 45 | 5 tasks | 8 files | | Phase 03 P03-02 | 4 | 2 tasks | 2 files | | Phase 03 P03-03 | 7 | 3 tasks | 2 files | | Phase 03 P03-07 | 5 | 2 tasks | 7 files | | Phase 03 P03-04 | 15 | 2 tasks | 3 files | | Phase 03 P03-05 | 6 | 3 tasks | 6 files | | Phase 04 P01 | 65 | 4 tasks | 17 files | | Phase 04 P03 | 12 | 2 tasks | 9 files | | Phase 04 P04 | 11 | 2 tasks | 10 files | | Phase 04 P05 | 10 | 2 tasks | 4 files | | Phase 04 P06 | 11 | 2 tasks | 7 files | | Phase 04 P07 | 6 | 2 tasks | 4 files | | Phase 05 P01 | 20 | 4 tasks | 15 files | | Phase 05 P02 | 5 | 1 tasks | 1 files | | Phase 05 P03 | 5 | - tasks | - files | | Phase 05 P04 | 11 | 3 tasks | 9 files | | Phase 05 P05 | 8 | 2 tasks | 4 files | | Phase 05 P06 | 6 | 1 tasks | 2 files | | Phase 05 P08 | 9 | 3 tasks | 7 files | | Phase 05 P07 | 8 | 1 tasks | 4 files | | Phase 06-ux-polish P01 | 2 | 2 tasks | 2 files | | Phase 06-ux-polish P02 | 8 | 2 tasks | 4 files | | Phase 06-ux-polish P03 | 11 | 2 tasks | 3 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • CAL-08 RESOLVED → GO (Phase 1): per-member Fastmail app password reaches all of that account's calendars; no cross-account ACL needed. Unified view stands; no shared-only fallback. See CAL-08-DECISION.md.
  • D-14 (2026-06-04): Phase 1 Gate 2 (live Authelia/Pangolin) deferred. SSE-over-Pangolin smoke = hard gate before Phase 4; live AUTH smoke incl. iOS standalone-PWA folded into Phase 3. Phases 23 build behind a dev-auth bypass. Tracked in 01-HUMAN-UAT.md + docs/deployment.md.
  • D-15 (2026-06-04): Validate real topology via local Newt connector + test subdomain through Pangolin (Mode A), not an Unraid deploy; Unraid reserved for go-live.
  • CalDAV locked: Fastmail does not expose calendars over JMAP. CalDAV via tsdav is the only protocol. No reconsideration.
  • Identity: Use oidc_iss + oidc_sub as stable composite key. Never email.
  • Real-time transport: Prefer SSE over WebSocket (proxy-resilient through Pangolin). SSE pass-through STILL UNVERIFIED — gate before Phase 4 (D-14).
  • Recurring events: Create + display only in v1 (CALDAV:expand on server side). Single-occurrence edit deferred to v1.x.
  • [Phase ?]: D-Task5-DDL: drizzle-kit push unsafe on MariaDB 11 (mysql dialect misreads metadata, schedules truncate). Additive DDL hand-applied; adopt drizzle-kit generate+migrate before next schema change.
  • [Phase ?]: D-02-RRULE: use ICAL.Recur.fromString + ICAL.Property for RRULE serialization — addPropertyWithValue produces char-split output for RECUR types
  • [Phase ?]: resolveUserId helper uses any type to avoid Hono context generic complexity — internal helper only
  • [Phase ?]: Write endpoints enqueue-only (calendarOutbox) with 202 optimistic-accept; no Fastmail call in routes (D-12/D-05)
  • [Phase ?]: GET /writable-calendars is authoritative D-03 writable-set endpoint: WHERE userId=currentUser.id OR isShared=1
  • [Phase ?]: D-03-07-icons: PWA icons generated via pure Node.js (zlib/Buffer) when ImageMagick/sharp unavailable; placeholder art; operator can replace in public/ without code changes
  • [Phase ?]: D-03-07-layout: InstallPrompt desktop layout wraps CalendarContent in flex-column div so banner appears above calendar grid
  • [Phase ?]: D-03-04-hoisting: vi.hoisted() required for vi.mock() factory variables when test file has static import of module under test (TDZ issue)
  • [Phase ?]: D-03-04-where: Drizzle types disallow chained .where().where(); use and() in single .where() call
  • [Phase ?]: D-01 calendar default: last-used URL from localStorage (eventForm.lastCalendarUrl), first writable calendar as fallback
  • [Phase ?]: D-02 calendar picker: hidden when writableCalendars.length === 1, shown when >1 — authoritative from GET /api/events/writable-calendars
  • [Phase ?]: T-03-15 XSS: EventForm renders all values as plain-text JSX children; no dangerouslySetInnerHTML in code
  • [Phase ?]: Phase 4 Plan 1
  • [Phase ?]: D-04 GET scoped: two-select + Set union (owner + list_shares); ListDeleteDialog props-driven to preserve calendarStore dialog; zValidator returns 400 not 422 per existing convention
  • [Phase 04-04]: listItemsRouter separate from listsRouter, mounted at /api/list-items for PATCH/DELETE item routes per RESEARCH architecture diagram
  • [Phase 04-04]: Uncheck rank recomputed to active-bottom (generateKeyBetween(lastActiveRank, null)) in same DB write (Open Question 2 resolved)
  • [Phase 04-04]: Delete-wins no-rollback: deleteMutation has no onError handler; item removal from cache is final (D-09)
  • [Phase ?]: LIST-04: SSE connection lives in ListDetail (not hoisted to Lists route); Phase 5 push will own session lifecycle
  • [Phase 04-07]: D-04-07-collation: Drizzle 0.45.x has no first-class collation option on varchar; used customType to emit varchar(255) COLLATE utf8mb4_bin for list_items.rank — keeps schema-as-code + generate+migrate workflow
  • [Phase 04-07]: D-04-07-guard: isShared owner-only guard placed after access check, before updateValues construction; mirrors DELETE handler idiom (if !access.isOwner → 403)
  • [Phase ?]: VAPID config is env-injected at runtime via docker-compose.yml environment block; no key baked into image (Phase 5 D-transposability)
  • [Phase ?]: dispatchPush uses sub.id (not a separate dbRowId argument) — 2-arg signature matches existing test
  • [Phase ?]: coalesceListPush dispatch signature is (listId, actorId, count) — test scaffold canonical; richer payload deferred to Plan 05-05 caller
  • [Phase ?]: notifyListChange fires for all list/item mutations except reorder (position) and list-create per D-01
  • [Phase ?]: D-05-06-crossjoin: Drizzle cross-join in reminderScheduler pairs shared events with all pushSubscriptions; grouping by uid post-join ensures full fan-out per deduped event (reminderScheduler.ts)
  • [Phase ?]: D-03 actor exclusion: ne() at DB level + filter() in application code (defence-in-depth for eventChangeDispatcher tests)
  • [Phase ?]: D-08: hasRrule derived from event.isRecurring() in expand.ts — no DB query change needed; captured once before branch

Roadmap Evolution

  • Phase 6 added (2026-06-07): UX Polish — all-day visual distinction, event-form date/recurrence behavior, recurring-series edit, auth-flow smoothing. Candidate scope pulls from backlog 999.2/999.3/999.6/999.7/999.8/999.9.

Pending Todos

  • Fix docs/deployment.md local-dev command DONE 2026-06-10 (quick 260610-czd) — added a "Running locally (host-side, no Docker)" subsection with the correct two-terminal command (set -a; source .env; set +a && DEV_AUTH_BYPASS=true DB_HOST=localhost pnpm --filter @familysync/api dev + pnpm --filter @familysync/pwa dev). --env-file deliberately NOT baked into the dev script (root .env sets DB_HOST=mariadb; auto-load would break host-side dev).
  • REQUIREMENTS.md traceability gap DONE 2026-06-10 (gsd-fast) — added the 6 deferred REQ-IDs to the Traceability table: CAL-09…CAL-12 (v1.x, Deferred), DISP-01/DISP-02 (v2, Deferred). v1 coverage stays 20/20; deferred IDs tracked separately.
  • DST spring-forward spot-check (Phase 2) — recurring/DST is implemented and code-verified (VTIMEZONE before expansion + local display TZ), and operator approved general times; navigating to March 2026 to eyeball the spring-forward transition is a recommended future spot-check.
  • Gitea CI — regression on PR to main + Docker build/publish — self-hosted Gitea runner exists but no CI yet. Add .gitea/workflows/: full regression (lint/typecheck/unit + API integration tests against a MariaDB service container + PWA build) gating PRs to main, plus build/publish the Docker image to the Gitea registry. Decide image matrix (API-only vs API+PWA — only apps/api/Dockerfile exists today) and tag policy. See pending todo 2026-06-10-gitea-ci-regression-and-docker-publish.md.

Blockers/Concerns

  • Phase 1: Personal-calendar CalDAV ACL RESOLVED → CAL-08 GO (per-member app password; no cross-account ACL).
  • Phase 4 ENTRY GATE: Pangolin SSE pass-through (issue #1034) unverified CLEARED 2026-06-08 — SSE smoke PASS over familysync-dev.bergerhouse.net (~6 min, 35 heartbeats, buffering off, no cut). Live sync unblocked. Caveat: untested for a max total connection-duration cap; residual risk covered by Phase 4 design (D-10/D-11/D-12). See quick 260607-u8o + 03-GATE2-RESULTS.md Part C.
  • Phase 3: iOS standalone-PWA + Authelia login is load-bearing for the wife and is the first real external auth test (carried Gate 2 item, D-14). Also: iOS install guide is load-bearing — she gets no push notifications if she does not install the PWA.
  • Phase 2/3 dev: build behind a documented dev-auth bypass until Gate 2 deploy (D-14).
  • Phase 5: iOS push subscriptions silently revoked after 3 silent pushes. Subscription health-check and event.waitUntil() are mandatory from day one.

Quick Tasks Completed

# Description Date Commit Status Directory
260606-tv8 Fix missing sign-in redirect in the PWA (Phase 03 auth-entry gap from Gate 2): guarded /api/login → / + full-page redirect on unauthenticated fetchMe 2026-06-07 7c6531f 260606-tv8-fix-missing-sign-in-redirect-in-the-pwa-
260607-l6l Batch-fix Phase 03 write-path bugs: events.ts edit/delete missing calendars innerJoin (503, BLOCKING) + handler-coupled regression test; shared deriveDisplayName helper (me.ts + resolveUserId, corrects blank rows); GET /api/events userId/isShared ownership filter 2026-06-07 2870413 260607-l6l-fix-phase-03-write-path-correctness-bugs
260607-u8o Record SSE-over-Pangolin smoke test PASS (Phase 4 entry gate, D-14 / issue #1034) — updated 01-HUMAN-UAT item 4 + 03-GATE2-RESULTS Part C to PASS with live evidence 2026-06-08 26655cf 260607-u8o-record-sse-over-pangolin-smoke-test-pass
260610-cr8 Adopt drizzle generate+migrate workflow, retire db:push on MariaDB — removed db:push script + repointed deployment.md to migrate with anti-push warning; dry-verified no destructive diff 2026-06-10 1a95d81 Verified 260610-cr8-adopt-drizzle-generate-migrate-workflow-
260610-czd Fix docs/deployment.md local-dev command — added "Running locally (host-side, no Docker)" subsection with correct env-sourced two-terminal run command (Phase 2 UAT gap) 2026-06-10 39e2ee0 260610-czd-fix-docs-deployment-md-local-dev-command
260610-hbu Phase 5 reminder scheduler resilience (UAT Test 1 gap) — catch-up scan (now, now+16min] + per-uid exactly-once dedup so a missed/late cron tick no longer drops a reminder; lead-accurate body; also fixes pre-existing cross-tick double-fire. 10/10 reminder tests pass 2026-06-10 19d92c6 Verified 260610-hbu-make-phase-5-reminder-scheduler-resilien

Deferred Items

Category Item Status Deferred At
Calendar Single-occurrence recurring edit (RECURRENCE-ID) v1.x Roadmap
Calendar "This and following" recurring edit v1.x Roadmap
Calendar Apple Calendar native subscribe URL docs v1.x Roadmap
Calendar Secondary timezone display toggle v1.x Roadmap
Display Wall-display / kiosk dashboard v2 PROJECT.md
Calendar Mark shared-family calendar is_shared=1 RESOLVED 2026-06-10 — operator created the "FamilySync" calendar on the primary Fastmail account; poller synced it as calendars.id=10 (user 2); ran UPDATE calendars SET is_shared=1 WHERE id=10. Shared color lane now populated; Phase 5 reminders now fire on its events. Poller upsert does not touch is_shared, so the flag persists. Phase 2 (deferred, D-16) DONE 2026-06-05 → 2026-06-10

Session Continuity

Last session: 2026-06-10T15:20:02.349Z Stopped at: Completed 06-03: hasRrule server-side exposure Resume file: None