context, phase, task, total_tasks, status, last_updated
| context | phase | task | total_tasks | status | last_updated |
|---|---|---|---|---|---|
| phase | 02-calendar-display | 0 | 5 | planned-not-executed | 2026-06-04T19:28:41.530Z |
<current_state> Phase 2 (calendar-display) is fully planned and verified, not yet executed. The plan-checker PASSED on iteration 2 (the initial check found 2 blockers + 3 warnings; all were fixed). 5 PLAN.md files exist across 4 waves. Phase 1 already shipped a working pnpm monorepo (apps/api Hono+Drizzle+CalDAV broker, apps/pwa React+Vite).
The immediate next step is execution: /gsd-execute-phase 2.
One uncommitted file: .planning/config.json (this session's settings changes).
</current_state>
<completed_work>
This session:
- Phase 2 RESEARCH.md + Nyquist VALIDATION.md written and committed (
a707f8d) - PATTERNS.md written — 23 files classified, 19 analogs from Phase 1 code (
5e14413) - 5 PLAN.md files created in 4 waves; plan-checker PASSED iteration 2 (
fc4cc2c)- Requirements coverage 3/3 (CAL-02, CAL-03, CAL-07); decision coverage 10/10
- Backlog item 999.1 added — "treat Fastmail as a calendar provider, support more" (
8bd52c6) - GSD config changed via /gsd-config: Adaptive profile, TDD on, per-milestone branching, auto-advance on; saved as global defaults (~/.gsd/defaults.json). config.json uncommitted. </completed_work>
<remaining_work>
- Execute Phase 2 — run all 5 plans across 4 waves:
- Wave 1: 02-01 — schema (has_rrule/is_shared) + [BLOCKING] drizzle-kit push + dev-auth bypass + PWA vitest/jsdom harness + ICS fixtures + RED stubs
- Wave 2: 02-02 (backend: expandOccurrences + windowed /api/events) ∥ 02-03 (frontend foundation: tokens, colorUtils, calendarConfig, hydrateEvents, Zustand store) — no file overlap
- Wave 3: 02-04 — CalendarShell renders REAL windowed Fastmail events, color-coded, 4 views
- Wave 4: 02-05 — EventDetailPopover + ColorLegend + nav/toolbar + skeleton/empty/error + human verify </remaining_work>
<decisions_made>
- Server-side recurrence expansion via
ICAL.RecurExpansion, with VTIMEZONE registered BEFORE expansion (or DST events render at wrong wall-clock time). - Schedule-X
calendarId = occ.isShared ? 'shared' : String(occ.ownerUserId)— NOTString(occ.calendarId). The calendars config is keyed by userId; using the DB calendar-row id silently breaks color routing for members owning multiple calendars. - Shared-family calendar identified via a
calendars.is_sharedcolumn + operator checkpoint (chosen over fragile displayName matching). - This-session GSD config: Adaptive profile, TDD on, per-milestone branching, auto-advance on. </decisions_made>
Required Reading (in order)
.planning/phases/02-calendar-display/02-01-PLAN.md…02-05-PLAN.md— the plans to execute.planning/phases/02-calendar-display/02-RESEARCH.md— DST/VTIMEZONE, Schedule-X Temporal, firstDayOfWeek 0→7, has_rrule pre-filter (the landmines).planning/phases/02-calendar-display/02-VALIDATION.md— per-task verification map (Nyquist).planning/phases/02-calendar-display/02-PATTERNS.md— analog files in the Phase 1 codebase
Critical Anti-Patterns (do NOT repeat these)
- Do NOT skip the
[BLOCKING] npx drizzle-kit pushtask in Wave 1 (02-01). Build/types pass without it because TS types come from config, not the live DB → false-positive verification. - Do NOT stamp
String(occ.calendarId)as the Schedule-X calendarId — use isShared/ownerUserId. - Do NOT expand recurrences before registering VTIMEZONE; do NOT shift all-day events through UTC (keep them as 'YYYY-MM-DD' / Temporal.PlainDate).
Infrastructure State
- Branch:
main. git.branching_strategy is nowmilestone— execute may create a milestone branch. - Phase 1 shipped: apps/api + apps/pwa, MariaDB via docker-compose. No background processes running.
- TDD is ON globally now, but Phase 2 plans were written PRE-TDD — they carry no TDD gates. Only Phase 3+ will get TDD. (Re-plan Phase 2 if you want TDD gates here.)
<next_action>
Start with: /gsd-execute-phase 2. Two human checkpoints will pause execution — marking the
shared-family calendar (Wave 2, plan 02-02) and final visual verification of the 4 success
criteria (Wave 4, plan 02-05). Consider committing .planning/config.json first.
</next_action>