gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone executing Phase 2 UI-SPEC approved 2026-06-04T19:09:54.699Z 2026-06-04 -- Phase 01 execution started
total_phases completed_phases total_plans completed_plans percent
5 1 4 4 20

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-03)

Core value: One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store Current focus: Phase 01 — foundation-broker-spike

Current Position

Phase: 01 (foundation-broker-spike) — EXECUTING Plan: 1 of 4 Status: Ready to execute Last activity: 2026-06-04 -- Phase 01 execution started

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
- - - -

Recent Trend:

  • Last 5 plans: -
  • Trend: -

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • CAL-08 RESOLVED → GO (Phase 1): per-member Fastmail app password reaches all of that account's calendars; no cross-account ACL needed. Unified view stands; no shared-only fallback. See CAL-08-DECISION.md.
  • D-14 (2026-06-04): Phase 1 Gate 2 (live Authelia/Pangolin) deferred. SSE-over-Pangolin smoke = hard gate before Phase 4; live AUTH smoke incl. iOS standalone-PWA folded into Phase 3. Phases 23 build behind a dev-auth bypass. Tracked in 01-HUMAN-UAT.md + docs/deployment.md.
  • D-15 (2026-06-04): Validate real topology via local Newt connector + test subdomain through Pangolin (Mode A), not an Unraid deploy; Unraid reserved for go-live.
  • CalDAV locked: Fastmail does not expose calendars over JMAP. CalDAV via tsdav is the only protocol. No reconsideration.
  • Identity: Use oidc_iss + oidc_sub as stable composite key. Never email.
  • Real-time transport: Prefer SSE over WebSocket (proxy-resilient through Pangolin). SSE pass-through STILL UNVERIFIED — gate before Phase 4 (D-14).
  • Recurring events: Create + display only in v1 (CALDAV:expand on server side). Single-occurrence edit deferred to v1.x.

Pending Todos

None yet.

Blockers/Concerns

  • Phase 1: Personal-calendar CalDAV ACL RESOLVED → CAL-08 GO (per-member app password; no cross-account ACL).
  • Phase 4 ENTRY GATE: Pangolin SSE pass-through (issue #1034) still unverified — deferred from Phase 1 Gate 2 (D-14). Must pass the 5-min SSE smoke (docs/deployment.md) before building live sync.
  • Phase 3: iOS standalone-PWA + Authelia login is load-bearing for the wife and is the first real external auth test (carried Gate 2 item, D-14). Also: iOS install guide is load-bearing — she gets no push notifications if she does not install the PWA.
  • Phase 2/3 dev: build behind a documented dev-auth bypass until Gate 2 deploy (D-14).
  • Phase 5: iOS push subscriptions silently revoked after 3 silent pushes. Subscription health-check and event.waitUntil() are mandatory from day one.

Deferred Items

Category Item Status Deferred At
Calendar Single-occurrence recurring edit (RECURRENCE-ID) v1.x Roadmap
Calendar "This and following" recurring edit v1.x Roadmap
Calendar Apple Calendar native subscribe URL docs v1.x Roadmap
Calendar Secondary timezone display toggle v1.x Roadmap
Display Wall-display / kiosk dashboard v2 PROJECT.md

Session Continuity

Last session: 2026-06-04T18:24:20.759Z Stopped at: Phase 2 UI-SPEC approved Resume file: .planning/phases/02-calendar-display/02-UI-SPEC.md