Files
familysync/.planning/milestones/v1.1-phases/08-gitea-ci/08-VALIDATION.md
T
2026-06-18 22:21:38 -04:00

8.2 KiB
Raw Blame History

phase, slug, status, nyquist_compliant, wave_0_complete, created
phase slug status nyquist_compliant wave_0_complete created
8 gitea-ci planned true false 2026-06-11

Phase 8 — Validation Strategy

Per-phase validation contract for feedback sampling during execution.


Test Infrastructure

Property Value
Framework Vitest 4.1.x (API + PWA unit), @playwright/test 1.60.0 (E2E harness)
Config file apps/api/vitest.config.ts, apps/pwa/playwright.config.ts
Quick run command pnpm lint && pnpm typecheck
Full suite command pnpm test then pnpm test:e2e (CI=true, dev stack up)
Estimated runtime unit ~tens of seconds; harness several minutes (2 device profiles)

Note: Phase 8 delivers CI plumbing (.gitea/workflows/*.yml). The "tests" for this phase are the CI workflow runs themselves — validation is observed by triggering the workflow on a branch/PR and reading Gitea Actions logs, not by a local unit-test file per task.


Sampling Rate

  • After every task commit: YAML lint / act_runner dry-validate where possible; push branch and observe the probe/CI run in Gitea Actions
  • After every plan wave: Confirm all jobs in that wave pass on a test PR (W0 probe green → W1 fast-checks + integration green → W2 harness + publish green)
  • Before /gsd-verify-work: Full CI green on a real PR targeting main
  • Max feedback latency: one CI run (minutes), bounded by the harness job

Per-Task Verification Map

Task ID Plan Wave Requirement Threat Ref Secure Behavior Test Type Automated Command File Exists Status
P01-T1 register runner + PAT 08-01 1 CI-01/CI-02 T-08-PAT runner online; PAT secret stored, never in repo operator/manual Gitea Actions runner list + repo secret present operator pending
P01-T2 author runner-probe.yml 08-01 1 CI-01 T-08-01 probe is non-destructive; touches no secret grep gate grep healthcheck.sh + gitea-upload fork; ! grep mysqladmin/upload-artifact@v4 W0 pending
P01-T3 run probe, record forks 08-01 1 CI-01 T-08-01 runner mode / cache / WebKit / artifact answers captured workflow run observe runner-probe run in Gitea Actions W0 pending
P02-T1 fast-checks job 08-02 2 CI-01 lint+typecheck+PWA-unit gate the PR grep gate + workflow run grep node-pin/typecheck/pwa test; PR run green scripts pending
P02-T2 api job (MariaDB+migrate) 08-02 2 CI-01 T-08-03/04/05 DB-backed API tests pass cold; migrate-not-push; throwaway creds grep gate + workflow run grep healthcheck.sh+db:migrate; ! grep mysqladmin/db:push; cold PR run green scripts pending
P02-T3 verify PR jobs 08-02 2 CI-01 both jobs run parallel, api green cold workflow run observe fast-checks ∥ api on a PR W1 pending
P03-T1 harness stack bring-up 08-03 3 CI-01 T-08-06/07/08 API bg w/ inline DEV_AUTH_BYPASS; :3000 readiness before Playwright grep gate + workflow run grep inline-bypass+:3000/health+db:migrate; ! grep db:push Phase 7 specs pending
P03-T2 playwright run + artifacts 08-03 3 CI-01 T-08-06 both profiles run; traces upload on failure; no spec edits grep gate + workflow run grep webkit+chromium+base-url+gitea-upload; git diff --quiet harness files Phase 7 specs pending
P03-T3 verify harness on PR 08-03 3 CI-01 iphone+pixel green vs CI dev stack; artifact confirmed workflow run observe harness job on a PR W2 pending
P04-T1 publish job 08-04 4 CI-02 T-08-PAT/09/10 --password-stdin only; both tags; production target from root; no bypass grep gate grep --password-stdin+target production+both tags; ! grep -p/--password/DEV_AUTH_BYPASS-in-publish W2 pending
P04-T2 merge, audit log, verify tags 08-04 4 CI-02 T-08-PAT no plaintext PAT in log; :latest + :v1.1- in registry workflow run + log audit merge → audit publish log + check Packages W2 pending

Status: pending · green · red · ⚠️ flaky — planner expands one row per task.


Wave 0 Requirements

  • .gitea/workflows/runner-probe.yml — runner-probe workflow (new file; Wave 0 task). Must answer: runner mode (Docker vs host), Docker socket access, actions/* resolution, Node 22 / pnpm availability, internet access, WebKit dep installability.
  • .gitea/workflows/ci.yml — main CI workflow scaffolding (new file; Waves 12).

Existing unit/integration/E2E infrastructure (Vitest + Playwright) is reused unchanged; no new local test framework is installed.


Manual-Only Verifications

Behavior Requirement Why Manual Test Instructions
Runner registered on Unraid CI-01/CI-02 Operator infra action outside the repo; 0 runners currently registered Install/register act_runner on Unraid against git.bergerhouse.net; confirm it appears in Gitea Actions runners list
Gitea registry PAT created CI-02 Secret creation is an operator action; cannot be scripted in-repo Create PAT with write:package; store as repo secret (e.g. GITEA_REGISTRY_PAT); confirm publish job authenticates
PR merge actually blocked on failure CI-01 Requires branch-protection "required status checks" config in Gitea Configure required checks on main; open a failing PR; confirm merge button is blocked

Validation Sign-Off

  • All tasks have an observable CI-run verification or Wave 0 dependency
  • Sampling continuity: every wave has a green-gate before the next (W0 probe → W1 PR jobs → W2 harness → W3 publish, each gated by a checkpoint)
  • Wave 0 covers all MISSING references (runner-probe answers all unknowns)
  • No watch-mode flags
  • nyquist_compliant: true set in frontmatter (after planner expands the map)

Approval: planned 2026-06-11 — map expanded, nyquist_compliant=true