Phase 8: Gitea CI — Verification
Status: PASSED Verified: 2026-06-11 Evidence basis: Gitea Actions run log + Gitea Packages API inspection by operator
Phase Goal
Every PR to main runs a full regression that gates the merge — lint, typecheck, unit, API-integration against a MariaDB service container, and the Phase 7 mobile Playwright harness as a UI-regression step — and a merge to main builds and publishes the API Docker image. All on the existing self-hosted Gitea Actions runner.
Six-Criteria Evidence Table
| # | Success Criterion | Status | Evidence |
|---|---|---|---|
| 1 | PR triggers lint + typecheck + unit + API-integration vs MariaDB service container; failing run blocks merge | PASSED | Runs #11 and #12: fast-checks (191s, lint no-op + tsc both apps + PWA vitest) and api (238s, MariaDB cold start + drizzle-kit migrate + DB-backed integration tests) both green. Run blocking enforced by Gitea branch protection on main. |
| 2 | API integration tests connect to service-container MariaDB (DB_HOST=127.0.0.1) and pass reliably on cold first run | PASSED | Run #11 cold start: MariaDB readiness wait (mysql2 loop) completed before migrate; squashed migration baseline (commit c0f892c) eliminated false drizzle-kit destructive diff; all API integration tests passed on first attempt. |
| 3 | PR workflow brings up dev stack (API + PWA dev servers + MariaDB, DEV_AUTH_BYPASS=true) and runs Phase 7 mobile Playwright harness headlessly; harness failure blocks merge | PASSED | Run #11: harness job — 58 specs across iphone/WebKit + pixel/Chromium — all green in 1.6 min. Four CI-specific infrastructure fixes applied (API-reap timeout, ipv4first/127.0.0.1 DNS, dev-user seed, direct test:e2e call). No Phase 7 harness files modified. |
| 4 | Harness step waits for both API and PWA dev servers before launching Playwright (no startup-race flake) | PASSED | mysql2 readiness loop (DB) → :3000/health poll (API) → global-setup :5173 poll (PWA) — three sequential readiness gates before Playwright launches. No flake observed on cold or warm runs. |
| 5 | Merge to main builds and pushes API Docker image under a sensible tag |
PASSED | Run #14 (push of merge commit 98acff8): docker build --target production -f apps/api/Dockerfile . succeeded; both tags pushed — familysync-api:latest and familysync-api:v1.1-98acff8 — same digest sha256:ce724852…; confirmed present in Gitea Packages API. |
| 6 | Registry credentials never appear in plaintext in the CI logs | PASSED | Log audit of run #14: PAT masked as *** throughout (Gitea secret scrubber); --password-stdin used exclusively (token piped via stdin); no -p/--password argument form anywhere; docker logout ran in always() cleanup. REGISTRYPAT naming used (GITEA prefix excluded to avoid Gitea's silent secret-drop behavior). |
Plans Delivering the Criteria
| Plan | Contribution |
|---|---|
| 08-01 | Runner probe — confirmed ubuntu-latest label, Docker executor (/.dockerenv), GITHUB_SHA availability, Playwright deps install cleanly |
| 08-02 | ci.yml: fast-checks job (lint, tsc, PWA vitest) + api job (MariaDB service, mysql2 readiness, drizzle-kit migrate, integration tests). Delivers criteria 1 + 2. |
| 08-03 | ci.yml: harness job (dev-stack bring-up, readiness waits, pnpm test:e2e). Delivers criteria 3 + 4. Four CI infrastructure fixes (no Phase 7 files modified). |
| 08-04 | ci.yml: publish job (docker login --password-stdin, build --target production from repo root, dual push :latest + :v1.1-, docker logout). Delivers criteria 5 + 6. |
Key Fixes Applied During Phase 8 (CI-side only, no harness changes)
- squashed migration baseline (commit
c0f892c) — single0000_baseline.sqlreplaces the incremental migration history; eliminates the false drizzle-kit destructive diff that aborted the first cold CI run. - API-reap + ipv4first —
pkill -f "tsx watch"reap guard +--dns-result-order=ipv4firstflag ensures the API dev server binds on 127.0.0.1 (not ::1), matching the harness readiness poll. - dev-user seed — global-setup inserts the DEV_AUTH_BYPASS user (id=1) before Playwright launches, so the authed bypass session is valid on first spec.
- direct test:e2e —
pnpm --filter @familysync/pwa test:e2ecalled directly (not via Makefile) to avoid shell-expansion issues in the runner. - REGISTRY_PAT naming (commit
73eecf7) — Gitea runner silently drops secrets whose names begin withGITEA_; secret renamed fromGITEA_REGISTRY_PATtoREGISTRY_PAT.
Requirements Delivered
| REQ-ID | Description | Status |
|---|---|---|
| CI-01 | PR regression gates merge (lint + typecheck + unit + API-integration + mobile harness) | Complete |
| CI-02 | Push to main builds + publishes API Docker image | Complete |
Phase 8 Outcome
Phase 8 is complete. The Gitea CI pipeline is fully operational on the self-hosted runner. Future merges to main will automatically run the full regression gate and publish a new image — no manual steps required.