gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v1.0 milestone planning Phase 1 context gathered 2026-06-04T11:55:07.999Z 2026-06-03 — Roadmap created
total_phases completed_phases total_plans completed_plans percent
5 0 0 0 0

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-06-03)

Core value: One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store Current focus: Phase 1 — Foundation + Broker Spike

Current Position

Phase: 1 of 5 (Foundation + Broker Spike) Plan: 0 of ? in current phase Status: Ready to plan Last activity: 2026-06-03 — Roadmap created

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: -
  • Total execution time: 0 hours

By Phase:

Phase Plans Total Avg/Plan
- - - -

Recent Trend:

  • Last 5 plans: -
  • Trend: -

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work:

  • Phase 1 gate: Personal-calendar CalDAV ACL must be spiked before calendar UI is built. Fallback is shared-family-only if spike fails.
  • CalDAV locked: Fastmail does not expose calendars over JMAP. CalDAV via tsdav is the only protocol. No reconsideration.
  • Identity: Use oidc_iss + oidc_sub as stable composite key. Never email.
  • Real-time transport: Prefer SSE over WebSocket (proxy-resilient through Pangolin). Verify Pangolin SSE pass-through in Phase 1 infra spike.
  • Recurring events: Create + display only in v1 (CALDAV:expand on server side). Single-occurrence edit deferred to v1.x.

Pending Todos

None yet.

Blockers/Concerns

  • Phase 1: Personal-calendar CalDAV ACL behavior on Fastmail is LOW confidence (must spike). Failure degrades unified view to shared-family-only for v1.
  • Phase 1: Pangolin SSE/WebSocket pass-through is an open infra question (known issue #1034). Must smoke-test before Phase 4 real-time sync is built.
  • Phase 3: iOS install guide is load-bearing for the wife — she will never receive push notifications if she does not install the PWA.
  • Phase 5: iOS push subscriptions silently revoked after 3 silent pushes. Subscription health-check and event.waitUntil() are mandatory from day one.

Deferred Items

Category Item Status Deferred At
Calendar Single-occurrence recurring edit (RECURRENCE-ID) v1.x Roadmap
Calendar "This and following" recurring edit v1.x Roadmap
Calendar Apple Calendar native subscribe URL docs v1.x Roadmap
Calendar Secondary timezone display toggle v1.x Roadmap
Display Wall-display / kiosk dashboard v2 PROJECT.md

Session Continuity

Last session: 2026-06-04T11:55:07.995Z Stopped at: Phase 1 context gathered Resume file: .planning/phases/01-foundation-broker-spike/01-CONTEXT.md