4.5 KiB
4.5 KiB
context, phase, task, total_tasks, status, last_updated
| context | phase | task | total_tasks | status | last_updated |
|---|---|---|---|---|---|
| default | none (pre-Phase-1 — project initialized, planning not started) | 0 | 5 | paused | 2026-06-03T20:34:20.534Z |
<current_state>
/gsd-new-project ran to completion. FamilySync is fully initialized: PROJECT.md, config.json,
research (STACK/FEATURES/ARCHITECTURE/PITFALLS/SUMMARY), REQUIREMENTS.md (20 v1 reqs), and an
approved 5-phase ROADMAP.md (MVP mode) are all written and committed. Working tree is clean.
No phase/plan/task work has started yet. The immediate next step is /gsd-discuss-phase 1.
</current_state>
<completed_work>
- PROJECT.md written + committed (
ad2aad8) - config.json: interactive mode, standard granularity, parallel, balanced (Sonnet) models,
research + plan-check + verifier + drift-guard all on (
1ce0348) - Domain research: 4 parallel researchers + synthesis (
0f79277) - REQUIREMENTS.md: 20 v1 requirements — AUTH-01..03, CAL-01..08, LIST-01..04, NOTIF-01..03, PWA-01..02 (
a20afd4) - ROADMAP.md + STATE.md: 5 phases, 20/20 coverage; CLAUDE.md generated (
ac82d32) </completed_work>
<remaining_work>
5 phases, none started:
- Foundation + Broker Spike — AUTH-01/02/03, CAL-01, CAL-08
- Calendar Display — CAL-02, CAL-03
- Event Write-Back + PWA Install — CAL-04/05/06/07, PWA-01/02
- Shared Lists + Live Sync — LIST-01/02/03/04
- Web Push Notifications — NOTIF-01/02/03 </remaining_work>
<decisions_made>
- Fastmail calendars are CalDAV-only — JMAP-for-calendars is not available (pending RFC 8984). Broker authenticates with a Fastmail app password, NOT an API token (tokens are JMAP-only). This resolves the long-open JMAP-vs-CalDAV question.
- Stack: Hono + Drizzle (mysql2/MariaDB) + tsdav + ical.js + rrule + vite-plugin-pwa + web-push + @hono/oidc-auth; SSE (+ optional Redis) for live list sync.
- CAL-08 personal-calendar overlay is spike-gated in Phase 1 with a shared-family-only fallback.
- v1 scope: all 4 calendar views; recurring create+display only (single-instance edit -> v1.x); all 3 push types (event reminder, list-change, event-change).
- Vertical MVP structure (each phase = end-to-end user capability).
- Authelia already deployed + both members have accounts -> Phase 1 auth is OIDC-client integration only. </decisions_made>
Required Reading (in order)
.planning/ROADMAP.md— the 5-phase plan and per-phase success criteria.planning/research/SUMMARY.md— cross-cutting findings; read before Phase 1 planning.planning/research/PITFALLS.md— phase-mapped risks (CalDAV RRULE/ETag, iOS Web Push, Authelia, Pangolin).planning/REQUIREMENTS.md— 20 v1 requirements + traceability.planning/PROJECT.md— project context, constraints, open questions.planning/notes/familysync-architecture.md— reasoning behind dropped options (Baikal/Vikunja)
Critical Anti-Patterns (do NOT repeat these)
- ANTI-PATTERN: Assuming JMAP for calendar read/write → it does not exist on Fastmail. Use CalDAV (tsdav) only.
- ANTI-PATTERN: Building calendar UI before proving the personal-calendar share works → Phase 1 spike gates CAL-08 first.
- ANTI-PATTERN: Treating iOS Web Push as working from a Safari tab → it requires an installed (Add-to-Home-Screen) PWA; the guided install UX is load-bearing, not optional.
Infrastructure State
- Unraid + Docker Compose host; Authelia deployed (both members have accounts); Pangolin/Newt tunnel for public access (no open ports); MariaDB available, Redis available, no PostgreSQL.
- Nothing for FamilySync deployed yet — greenfield repo, only
.planning/+ generated CLAUDE.md exist.
Pre-Execution Critique Required
- Before/at Phase 1: confirm where the wife's PERSONAL calendar lives (Fastmail vs iCloud). If iCloud, CAL-08 (personal overlay) is unreachable via the Fastmail broker and degrades to shared-only (v1.x). This is the Phase 1 go/no-go spike.
<next_action>
Start with: /gsd-discuss-phase 1 — and open by confirming where the wife's personal calendar
lives, since it drives the CAL-08 go/no-go spike.
</next_action>