--- gsd_state_version: 1.0 milestone: v1.0 milestone_name: milestone status: executing stopped_at: Completed 03-03-PLAN.md last_updated: "2026-06-05T21:59:40.013Z" last_activity: 2026-06-05 progress: total_phases: 6 completed_phases: 2 total_plans: 17 completed_plans: 12 percent: 33 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-06-03) **Core value:** One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store **Current focus:** Phase 03 — event-write-back-pwa-install ## Current Position Phase: 03 (event-write-back-pwa-install) — EXECUTING Plan: 4 of 8 Status: Ready to execute Last activity: 2026-06-05 Progress: [███████░░░] 65% ## Performance Metrics **Velocity:** - Total plans completed: 5 - Average duration: - - Total execution time: 0 hours **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 02 | 5 | - | - | **Recent Trend:** - Last 5 plans: - - Trend: - *Updated after each plan completion* | Phase 03 P01 | 45 | 5 tasks | 8 files | | Phase 03 P03-02 | 4 | 2 tasks | 2 files | | Phase 03 P03-03 | 7 | 3 tasks | 2 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table. Recent decisions affecting current work: - CAL-08 RESOLVED → GO (Phase 1): per-member Fastmail app password reaches all of that account's calendars; no cross-account ACL needed. Unified view stands; no shared-only fallback. See CAL-08-DECISION.md. - D-14 (2026-06-04): Phase 1 Gate 2 (live Authelia/Pangolin) deferred. SSE-over-Pangolin smoke = hard gate before Phase 4; live AUTH smoke incl. iOS standalone-PWA folded into Phase 3. Phases 2–3 build behind a dev-auth bypass. Tracked in 01-HUMAN-UAT.md + docs/deployment.md. - D-15 (2026-06-04): Validate real topology via local Newt connector + test subdomain through Pangolin (Mode A), not an Unraid deploy; Unraid reserved for go-live. - CalDAV locked: Fastmail does not expose calendars over JMAP. CalDAV via tsdav is the only protocol. No reconsideration. - Identity: Use oidc_iss + oidc_sub as stable composite key. Never email. - Real-time transport: Prefer SSE over WebSocket (proxy-resilient through Pangolin). SSE pass-through STILL UNVERIFIED — gate before Phase 4 (D-14). - Recurring events: Create + display only in v1 (CALDAV:expand on server side). Single-occurrence edit deferred to v1.x. - [Phase ?]: D-Task5-DDL: drizzle-kit push unsafe on MariaDB 11 (mysql dialect misreads metadata, schedules truncate). Additive DDL hand-applied; adopt drizzle-kit generate+migrate before next schema change. - [Phase ?]: D-02-RRULE: use ICAL.Recur.fromString + ICAL.Property for RRULE serialization — addPropertyWithValue produces char-split output for RECUR types - [Phase ?]: resolveUserId helper uses any type to avoid Hono context generic complexity — internal helper only - [Phase ?]: Write endpoints enqueue-only (calendarOutbox) with 202 optimistic-accept; no Fastmail call in routes (D-12/D-05) - [Phase ?]: GET /writable-calendars is authoritative D-03 writable-set endpoint: WHERE userId=currentUser.id OR isShared=1 ### Pending Todos - **Fix `docs/deployment.md` local-dev command** — the documented dev run is wrong: the API dev script (`node --watch dist/index.js`) does NOT load `.env`, and `DB_HOST` defaults to `localhost` with an empty password. Correct local-dev command is: `pnpm --filter @familysync/api build && set -a; source .env; set +a && DEV_AUTH_BYPASS=true DB_HOST=localhost pnpm --filter @familysync/api dev` (+ `pnpm --filter @familysync/pwa dev`). Consider adding `--env-file=.env` to the dev script so this is automatic. (Surfaced during Phase 2 UAT.) - **REQUIREMENTS.md traceability gap** — phase.complete flagged 6 REQ-IDs in the body missing from the Traceability table: CAL-09, CAL-10, CAL-11, CAL-12, DISP-01, DISP-02. Add them to keep traceability in sync (likely Phase 4/5/display requirements). - **DST spring-forward spot-check (Phase 2)** — recurring/DST is implemented and code-verified (VTIMEZONE before expansion + local display TZ), and operator approved general times; navigating to March 2026 to eyeball the spring-forward transition is a recommended future spot-check. ### Blockers/Concerns - ~~Phase 1: Personal-calendar CalDAV ACL~~ RESOLVED → CAL-08 GO (per-member app password; no cross-account ACL). - Phase 4 ENTRY GATE: Pangolin SSE pass-through (issue #1034) still unverified — deferred from Phase 1 Gate 2 (D-14). Must pass the 5-min SSE smoke (docs/deployment.md) before building live sync. - Phase 3: iOS standalone-PWA + Authelia login is load-bearing for the wife and is the first real external auth test (carried Gate 2 item, D-14). Also: iOS install guide is load-bearing — she gets no push notifications if she does not install the PWA. - Phase 2/3 dev: build behind a documented dev-auth bypass until Gate 2 deploy (D-14). - Phase 5: iOS push subscriptions silently revoked after 3 silent pushes. Subscription health-check and event.waitUntil() are mandatory from day one. ## Deferred Items | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | Calendar | Single-occurrence recurring edit (RECURRENCE-ID) | v1.x | Roadmap | | Calendar | "This and following" recurring edit | v1.x | Roadmap | | Calendar | Apple Calendar native subscribe URL docs | v1.x | Roadmap | | Calendar | Secondary timezone display toggle | v1.x | Roadmap | | Display | Wall-display / kiosk dashboard | v2 | PROJECT.md | | Calendar | Mark shared-family calendar `is_shared=1` — operator must first create a "Family" calendar on the primary Fastmail account + share it, let the poller sync it, then run `UPDATE calendars SET is_shared=1 WHERE id=`. Until then the shared color lane is empty (correct). | Phase 2 (deferred, D-16) | 2026-06-05 | ## Session Continuity Last session: 2026-06-05T21:59:40.006Z Stopped at: Completed 03-03-PLAN.md Resume file: None