--- context: default phase: none (pre-Phase-1 — project initialized, planning not started) task: 0 total_tasks: 5 status: paused last_updated: 2026-06-03T20:34:20.534Z --- `/gsd-new-project` ran to completion. FamilySync is fully initialized: PROJECT.md, config.json, research (STACK/FEATURES/ARCHITECTURE/PITFALLS/SUMMARY), REQUIREMENTS.md (20 v1 reqs), and an approved 5-phase ROADMAP.md (MVP mode) are all written and committed. Working tree is clean. No phase/plan/task work has started yet. The immediate next step is `/gsd-discuss-phase 1`. - PROJECT.md written + committed (ad2aad8) - config.json: interactive mode, standard granularity, parallel, balanced (Sonnet) models, research + plan-check + verifier + drift-guard all on (1ce0348) - Domain research: 4 parallel researchers + synthesis (0f79277) - REQUIREMENTS.md: 20 v1 requirements — AUTH-01..03, CAL-01..08, LIST-01..04, NOTIF-01..03, PWA-01..02 (a20afd4) - ROADMAP.md + STATE.md: 5 phases, 20/20 coverage; CLAUDE.md generated (ac82d32) 5 phases, none started: 1. Foundation + Broker Spike — AUTH-01/02/03, CAL-01, CAL-08 2. Calendar Display — CAL-02, CAL-03 3. Event Write-Back + PWA Install — CAL-04/05/06/07, PWA-01/02 4. Shared Lists + Live Sync — LIST-01/02/03/04 5. Web Push Notifications — NOTIF-01/02/03 - **Fastmail calendars are CalDAV-only** — JMAP-for-calendars is not available (pending RFC 8984). Broker authenticates with a Fastmail **app password**, NOT an API token (tokens are JMAP-only). This resolves the long-open JMAP-vs-CalDAV question. - **Stack:** Hono + Drizzle (mysql2/MariaDB) + tsdav + ical.js + rrule + vite-plugin-pwa + web-push + @hono/oidc-auth; SSE (+ optional Redis) for live list sync. - **CAL-08 personal-calendar overlay is spike-gated in Phase 1** with a shared-family-only fallback. - v1 scope: all 4 calendar views; recurring create+display only (single-instance edit -> v1.x); all 3 push types (event reminder, list-change, event-change). - **Vertical MVP** structure (each phase = end-to-end user capability). - Authelia already deployed + both members have accounts -> Phase 1 auth is OIDC-client integration only. - None blocking. One important open question (see Pre-Execution / human actions): where the wife's personal calendar actually lives (Fastmail vs iCloud) — determines whether CAL-08 is achievable. ## Required Reading (in order) 1. `.planning/ROADMAP.md` — the 5-phase plan and per-phase success criteria 2. `.planning/research/SUMMARY.md` — cross-cutting findings; read before Phase 1 planning 3. `.planning/research/PITFALLS.md` — phase-mapped risks (CalDAV RRULE/ETag, iOS Web Push, Authelia, Pangolin) 4. `.planning/REQUIREMENTS.md` — 20 v1 requirements + traceability 5. `.planning/PROJECT.md` — project context, constraints, open questions 6. `.planning/notes/familysync-architecture.md` — reasoning behind dropped options (Baikal/Vikunja) ## Critical Anti-Patterns (do NOT repeat these) - ANTI-PATTERN: Assuming JMAP for calendar read/write → it does not exist on Fastmail. Use CalDAV (tsdav) only. - ANTI-PATTERN: Building calendar UI before proving the personal-calendar share works → Phase 1 spike gates CAL-08 first. - ANTI-PATTERN: Treating iOS Web Push as working from a Safari tab → it requires an installed (Add-to-Home-Screen) PWA; the guided install UX is load-bearing, not optional. ## Infrastructure State - Unraid + Docker Compose host; Authelia deployed (both members have accounts); Pangolin/Newt tunnel for public access (no open ports); MariaDB available, Redis available, no PostgreSQL. - Nothing for FamilySync deployed yet — greenfield repo, only `.planning/` + generated CLAUDE.md exist. ## Pre-Execution Critique Required - Before/at Phase 1: confirm where the wife's PERSONAL calendar lives (Fastmail vs iCloud). If iCloud, CAL-08 (personal overlay) is unreachable via the Fastmail broker and degrades to shared-only (v1.x). This is the Phase 1 go/no-go spike. This is a clean handoff right after project setup — no mid-task state to untangle. The roadmap is approved as-is. The one piece of judgment to carry forward is the CAL-08 risk: front-loaded into Phase 1 deliberately. Knowing the wife's calendar location before planning Phase 1 would sharpen it. Start with: `/gsd-discuss-phase 1` — and open by confirming where the wife's personal calendar lives, since it drives the CAL-08 go/no-go spike.