Phase 8: Gitea CI — runner probe + PR gating jobs (fast-checks + api) #3
@@ -18,7 +18,7 @@ The household can see and co-edit one color-coded family calendar (shared + each
|
||||
- **Initial setup wizard** — first-run validated bootstrap of env vars, VAPID keypair, DB connection, and first app password (was backlog 999.11)
|
||||
- **Faster write-back** — event-driven outbox drain so edits land in ~1s instead of up to ~15s, preserving the optimistic-202 durability guarantees (was backlog 999.13)
|
||||
- **Gitea CI** — full regression (lint/typecheck/unit/API-integration against a MariaDB service container) on PR to main + build/publish Docker image (was backlog 999.14)
|
||||
- **Mobile-browser testing** — mobile viewport + authenticated PWA harness so the assistant can catch mobile-only defects (was backlog 999.12)
|
||||
- **Mobile-browser testing** ✅ **delivered (Phase 7, 2026-06-11)** — Playwright harness, two-profile mobile matrix (iPhone/WebKit + Pixel/Chromium), DEV_AUTH_BYPASS auth, deterministic dev-DB seed; 58 specs across both profiles assert layout/state. TEST-01/TEST-02 validated. Consumed by Phase 8 CI (was backlog 999.12)
|
||||
|
||||
Deferred to backlog: self-service provider onboarding (999.5) and provider abstraction (999.1). Admin-managed credentials (999.10) partially cover the multi-member credential gap in the interim.
|
||||
|
||||
@@ -114,4 +114,4 @@ This document evolves at phase transitions and milestone boundaries.
|
||||
4. Update Context with current state
|
||||
|
||||
---
|
||||
*Last updated: 2026-06-10 — started milestone v1.1 Operability & Polish*
|
||||
*Last updated: 2026-06-11 — Phase 7 (Mobile Test Harness) complete; TEST-01/TEST-02 validated*
|
||||
|
||||
Reference in New Issue
Block a user