Stack verified live (/health green, 4 tables pushed). Record Docker deviation in SUMMARY, mark 01-01 complete in ROADMAP, clean up paused-setup handoff files.
Tasks 1-2 done: monorepo scaffold, Drizzle schema, /health slice. Stopped at Task 3 checkpoint (drizzle-kit push requires live Docker stack).