Lucas Berger fc5b06d343 Merge remote-tracking branch 'origin/main' into gsd/phase-13-real-lint-gate-eslint
CI / fast-checks (pull_request) Failing after 1m47s
CI / api (pull_request) Successful in 1m0s
CI / harness (pull_request) Successful in 3m30s
# Conflicts:
#	.planning/ROADMAP.md
2026-06-11 21:25:14 -04:00
Lucas Berger f16316c6fd docs(quick-260611-tfc): WR-01 sw.ts notificationclick fallback fix 2026-06-11 21:16:38 -04:00
Lucas Berger f06216b567 docs(13): add code review report 2026-06-11 21:08:54 -04:00
Lucas Berger 90d94febea docs(13): mark phase complete — tracking updates 2026-06-11 21:00:55 -04:00
Lucas Berger 8a53e9d1ee docs(13): phase verification — passed (9/9), 2 live-CI human items 2026-06-11 20:59:51 -04:00
Lucas Berger 743c7d92f0 fix(13-03): exclude .planning from Prettier so the format gate stays green
GSD planning artifacts (.planning/**) are rewritten by tooling on every workflow
run and are never hand-formatted. Including them in Prettier scope caused
pnpm format:check to exit 1 on virtually every future PR, making the SC-3
green baseline impossible to hold. Add .planning/ to .prettierignore, mirroring
the same rationale as dist/ and apps/api/src/db/migrations/.

Real source docs (README.md, docs/**) remain in Prettier scope.
No playwright-report/, test-results/, or coverage/ directories exist to ignore.
2026-06-11 20:50:45 -04:00
Lucas Berger f153b7199d docs(13-03): complete Prettier reformat + CI format gate plan 2026-06-11 20:44:52 -04:00
Lucas Berger 982438dc10 style(13-03): apply Prettier formatting across repo
Mechanical reformat — no logic changes. 398 files changed, 19125
insertions(+), 16457 deletions(-). Prettier 3.8.4 with .prettierrc
(singleQuote:true, semi:true, tabWidth:2, trailingComma:all,
printWidth:100). Isolated per D-13-08 for reviewability.
2026-06-11 20:35:18 -04:00
Lucas Berger 4bc0445173 docs(13-02): record post-verification correction — residual lint error and fix 2026-06-11 20:31:10 -04:00
Lucas Berger 1453cbed76 docs(13-02): complete ESLint violation elimination plan 2026-06-11 20:25:47 -04:00
Lucas Berger 39e26561cf docs(13-01): complete lint gate foundation plan — SUMMARY + STATE + ROADMAP
Plan 13-01 complete: ESLint flat config + Prettier installed and wired,
SC-1 gate proven (exit 1 on deliberate violations), 119 real violations
inventoried for Plan 02 (api:42, pwa:77). STATE advanced to Plan 2 of 3.
2026-06-11 19:53:55 -04:00
luckberg b645243582 Merge branch 'main' into gsd/phase-08-fixes
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 58s
CI / harness (pull_request) Successful in 3m30s
2026-06-11 19:31:13 -04:00
Lucas Berger 5f065183b0 docs(08-fix): code review + auto-fix report (5 fixed, IN-02 deferred to Phase 13)
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 1m3s
CI / harness (pull_request) Successful in 3m27s
2026-06-11 19:29:36 -04:00
Lucas Berger 66c54507ad docs(13): create phase plan 2026-06-11 19:27:50 -04:00
Lucas Berger 694253ecb0 docs(13): create phase plan — 3 plans (lint gate + Prettier format gate)
- 13-01: install ESLint v9/typescript-eslint/React/Prettier (pinned), flat config,
  package lint + root format scripts, root type:module; prove gate fails (SC-1)
- 13-02: fix all first-run violations across both apps, address-not-mask (D-13-05/06)
- 13-03: isolated Prettier reformat (D-13-08) + CI format:check step + green baseline (SC-2/SC-3)
- ROADMAP: add active Phase 13 entry + Progress row; mark backlog 999.16 promoted
2026-06-11 19:25:08 -04:00
Lucas Berger 2863025bcd docs(13): add pattern map 2026-06-11 19:18:46 -04:00
Lucas Berger bcc9682a01 docs(roadmap): promote Phases 13 (real lint gate) + 14 (desktop e2e) into v1.1; fold backlog 999.5 self-service onboarding into admin-credential phase
CI / fast-checks (pull_request) Successful in 50s
CI / api (pull_request) Successful in 1m1s
CI / harness (pull_request) Successful in 3m33s
2026-06-11 19:13:31 -04:00
Lucas Berger ee67dfecef docs(13): add research + validation strategy 2026-06-11 19:04:13 -04:00
Lucas Berger ef87a3edf6 docs(13): research phase — ESLint flat config + Prettier 2026-06-11 19:03:11 -04:00
Lucas Berger 2b6b0da939 docs(state): record phase 13 context session 2026-06-11 18:29:04 -04:00
Lucas Berger 8fbc68f993 docs(13): capture phase context 2026-06-11 18:28:58 -04:00
Lucas Berger 234384c142 docs(quick-260611-ozt): split publish job into standalone gitea workflow + document release model
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 56s
CI / harness (pull_request) Successful in 3m22s
2026-06-11 18:08:27 -04:00
Lucas Berger e14054c264 docs(260611-ozt): pre-dispatch plan for split publish job into standalone gitea workflow 2026-06-11 18:02:57 -04:00
Lucas Berger b1851f475e docs(08): SUMMARY + VERIFICATION — phase 8 complete, CI-01 + CI-02 delivered
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 56s
CI / harness (pull_request) Successful in 3m23s
CI / publish (pull_request) Has been skipped
- 08-04-SUMMARY.md: publish job verified green (run #14), both tags pushed,
  security audit pass (PAT masked, --password-stdin), REGISTRY_PAT naming note
- 08-VERIFICATION.md: all six phase-8 ROADMAP criteria passed with evidence table
- REQUIREMENTS.md: CI-01 + CI-02 marked complete (checkboxes + traceability table)
- ROADMAP.md: phase 8 marked [x] complete (2026-06-11), 08-04 plan ticked
- STATE.md: phase complete, D-PAT-NAMING decision recorded, operator next steps updated
2026-06-11 16:17:53 -04:00
Lucas Berger 212d8c1691 docs(08-03): SUMMARY — harness green, 58 specs both profiles on cold CI stack
- Run #11 (PR #3): 58 passed in 1.6 min (iphone/WebKit + pixel/Chromium)
- 4 infrastructure fixes: API-reap at step boundary, IPv4-first for Vite, dev-user FK seed, reporter double-forward via pnpm
- No Phase 7 harness file modified (phase boundary D-01/D-02 held)
- Advance position to 08-04 (publish job)
2026-06-11 15:52:15 -04:00
Lucas Berger 2a34a94cc6 docs(08): correct premature completion — phase 8 + CI-01 still in progress
CI / fast-checks (pull_request) Successful in 48s
CI / api (pull_request) Successful in 57s
Plans 08-03 (harness UI-regression job) and 08-04 (publish job) are not yet
built; CI-01's definition includes the harness step (08-03). Revert phase 8
and CI-01 from complete back to in-progress.
2026-06-11 14:42:33 -04:00
Lucas Berger 694ffe713b docs(08): commit phase research (was untracked) 2026-06-11 14:39:30 -04:00
Lucas Berger 78229168b9 docs(08-02): SUMMARY — PR gating jobs green on cold run 2026-06-11 14:37:32 -04:00
Lucas Berger 181d161da6 docs: add backlog 999.16 — wire real ESLint lint gate (deferred from phase 8) 2026-06-11 14:33:22 -04:00
Lucas Berger 087d9af117 docs(08-01): SUMMARY — probe fork answers recorded, plan complete
- Docker-executor mode confirmed; runs-on: ubuntu-latest (not self-hosted)
- MariaDB service container works; DB_HOST=mariadb; no mysql CLI in image
- actions/cache@v4 unreliable (timeout) — skip in Plans 02/03
- Playwright WebKit deps install cleanly; Phase-7 harness CI-feasible
- ChristopherHX/gitea-upload-artifact@v4 confirmed; actions/upload-artifact@v4 broken
- ${GITHUB_SHA:0:7} valid for image tags
- STATE.md: plan 08-01 complete, position advanced to 08-02 (Wave 2)
- ROADMAP.md: 08 phase progress updated (1/4 plans complete)
2026-06-11 10:16:26 -04:00
Lucas Berger 134d4db08a fix(08-01): probe runs-on ubuntu-latest — runner has no self-hosted label
runner-probe / runner-probe (push) Successful in 5m33s
The act_runner advertises ubuntu-latest/ubuntu-24.04/ubuntu-22.04; runs-on:
self-hosted matched no runner and the probe job stayed queued. Switch the
probe (and the plan key-link) to ubuntu-latest. ci.yml (Plans 02-04) must
use the same label.
2026-06-11 10:04:41 -04:00
Lucas Berger e57b76ef59 docs(08-01): update STATE.md — Task 2 complete, awaiting Task 3 human-verify checkpoint
runner-probe / runner-probe (push) Has been cancelled
2026-06-11 09:53:40 -04:00
Lucas Berger 4a510f1d79 docs: add backlog item 999.15 — desktop e2e coverage; drop from phase 8 context 2026-06-11 09:36:53 -04:00
Lucas Berger 41b0b60291 docs(08): create phase plan 2026-06-11 09:34:48 -04:00
Lucas Berger 4e474cdd9c docs(08): create phase plan — 4 plans (runner-probe, PR jobs, harness, publish) 2026-06-11 09:26:48 -04:00
Lucas Berger 92acf02989 docs(08): add validation strategy 2026-06-11 09:16:30 -04:00
Lucas Berger e8a9ce4ea9 docs(state): record phase 8 context session 2026-06-11 08:50:02 -04:00
Lucas Berger c3cee0baae docs(08): capture phase context 2026-06-11 08:50:02 -04:00
Lucas Berger 4303a1b680 docs(07): code-review --fix complete — 5 warnings fixed, re-review status clean 2026-06-11 08:00:55 -04:00
Lucas Berger 789e87a360 docs(07): mark deep-review blockers BL-01/BL-02 resolved (53c3ca5); verification addendum 2026-06-11 07:39:58 -04:00
Lucas Berger f52b722b9b docs(07): deep code review report (2 blockers, CR-01 verified resolved) 2026-06-11 07:32:58 -04:00
Lucas Berger 84921a0464 docs(phase-07): evolve PROJECT.md after phase completion 2026-06-11 02:30:21 -04:00
Lucas Berger 407bf1e91c docs(phase-07): complete phase execution 2026-06-11 02:29:36 -04:00
Lucas Berger 3b4fd9a5b1 docs(07): add phase verification report 2026-06-11 02:29:17 -04:00
Lucas Berger e105dce9de docs(07): mark CR-01 resolved in review report 2026-06-11 02:24:11 -04:00
Lucas Berger 8458dc25eb docs(07): add code review report 2026-06-11 02:20:32 -04:00
Lucas Berger 10e570b21d docs(07-04): complete state coverage plan — calendar.spec.ts + lists.spec.ts 2026-06-11 02:13:34 -04:00
Lucas Berger f8227855dc docs(07-03): complete layout.spec.ts plan 2026-06-11 02:02:54 -04:00
Lucas Berger 8f0846c8c6 docs(07-02): complete globalSetup seed plan 2026-06-11 01:53:07 -04:00
Lucas Berger e7fdf798dd docs(07-01): complete playwright harness foundation plan 2026-06-11 01:45:45 -04:00