Lucas Berger 6405a93742 docs(10-01): complete v1.1 DB foundation plan summary and state update 2026-06-13 14:25:39 -04:00
Lucas Berger 159f37fe6a docs(10): record planning completion, annotate roadmap waves, add pattern map 2026-06-13 14:11:39 -04:00
Lucas Berger b24fbbfde7 docs(10): create phase plan (4 plans, 4 waves) for admin-role-settings
- 10-01 v1.1 DB foundation migration + dev-bypass admin seed
- 10-02 requireAdmin guard + first-login-wins + /api/me extension (TDD)
- 10-03 adminRouter credentials/shared-calendar + member self-service (TDD)
- 10-04 PWA /admin route + nav gating + CredentialSheet + SetupBanner
- filled 10-VALIDATION Per-Task Verification Map (Nyquist compliant)
- finalized ROADMAP Phase 10 plan list
2026-06-13 13:57:51 -04:00
Lucas Berger ca6947cfbf docs: add backlog item 999.18 — update dependencies as found during ci 2026-06-13 13:23:32 -04:00
Lucas Berger c72e013a7b docs(phase-16): complete phase execution
CI / changes (pull_request) Successful in 3s
CI / fast-checks (pull_request) Failing after 57s
CI / api (pull_request) Successful in 58s
CI / harness (pull_request) Successful in 3m59s
CI / security (pull_request) Successful in 40s
CI / gate (pull_request) Failing after 1s
2026-06-13 09:00:12 -04:00
Lucas Berger 9a108a3618 docs(16-06): complete image hygiene CI assertions plan 2026-06-13 08:28:37 -04:00
Lucas Berger 6e5086ce5e docs(16-05): complete security job + gate wiring plan 2026-06-13 08:25:00 -04:00
Lucas Berger 946dafe5fb docs(16-04): complete gitleaks+dockerignore plan — add SUMMARY, advance state 2026-06-13 08:16:49 -04:00
Lucas Berger ab42794c1c docs(16-03): complete eslint-plugin-security plan — add SUMMARY, advance state to plan 4 2026-06-13 05:26:15 -04:00
Lucas Berger 069fe53523 docs(16-02): complete dependency-audit-gate plan — add SUMMARY, advance state to plan 3 2026-06-13 05:20:43 -04:00
Lucas Berger b67d757f87 docs(16-01): complete boot-guard plan — add SUMMARY, advance state to plan 2 2026-06-13 05:15:35 -04:00
Lucas Berger 0d6366cd56 docs(16): create phase plan 2026-06-12 23:25:48 -04:00
Lucas Berger e039c85a22 docs(16): create phase plan — 6 plans, 2 waves (dep audit, security checks, image hygiene)
SEC-01/02, DEP-01/02, IMG-01/02/03, CI-03. Wave 1: image-hygiene runtime guard (TDD), audit+outdated wrappers (TDD), eslint-plugin-security fold, gitleaks config+baseline+.dockerignore. Wave 2: ci.yml security job + gate wiring, publish.yml hygiene assertions + boot-smoke. esbuild GHSA-gv7w-rqvm-qjhr waivered in 16-02 before the gate goes live.
2026-06-12 23:23:18 -04:00
Lucas Berger 2d50c7b515 docs(roadmap): add Phase 16 (CI dep audit, security & image hygiene); fold in + remove backlog 999.17
Publish / publish (push) Successful in 6s
2026-06-12 22:08:29 -04:00
Lucas Berger f742583842 docs: add backlog item 999.17 — define & enforce dev/prod image boundary 2026-06-12 21:41:02 -04:00
Lucas Berger 03f02a1207 docs(phase-09): complete phase execution 2026-06-12 17:08:54 -04:00
Lucas Berger 9164619ccd docs(09-01): complete outbox drain trigger wiring plan 2026-06-12 16:54:20 -04:00
Lucas Berger b22c92ae92 docs(09): create phase plan (2 plans, 2 waves) — outboxTrigger + drain signal wiring 2026-06-12 14:21:37 -04:00
Lucas Berger 2b4eb5d6ba docs(phase-15): complete phase execution
Publish / publish (push) Successful in 6s
2026-06-12 11:20:09 -04:00
Lucas Berger 62252ce434 docs(15-03): complete plan 03 — branch protection finalized (fast-checks + gate), publish.yml comment 2026-06-12 11:20:09 -04:00
Lucas Berger 0278e2080a docs(phase-15): update tracking after wave 2 2026-06-12 10:54:26 -04:00
Lucas Berger 20ebd90554 docs(phase-15): update tracking after wave 1 2026-06-12 10:49:12 -04:00
Lucas Berger c687efce27 docs(15): record planning complete + roadmap wave annotations 2026-06-12 10:30:50 -04:00
Lucas Berger e19d4736c7 docs(15): create phase plan — doc-only CI skip + markdown lint
3 plans across 3 waves:
- 15-01: markdownlint-cli2 config/script/step + fix 13 baseline violations (SC-4)
- 15-02: ci.yml changes job + conditional api/harness + always-running gate (SC-1/2, SC-3 YAML)
- 15-03: operator branch-protection checkpoint + publish.yml comment (SC-3)
2026-06-12 10:28:56 -04:00
Lucas Berger 23fb238443 docs(roadmap): add markdown linting to Phase 15 scope
Publish / publish (push) Successful in 6s
2026-06-12 09:52:34 -04:00
Lucas Berger 300a07ab4b docs: review backlog — promoted 999.17 to Phase 15, removed 6 stale promoted stubs
Publish / publish (push) Successful in 7s
2026-06-12 09:47:12 -04:00
Lucas Berger cf48fa8e1b docs(phase-14): complete phase execution
CI / fast-checks (pull_request) Successful in 1m20s
CI / api (pull_request) Successful in 57s
CI / harness (pull_request) Successful in 3m56s
2026-06-12 09:10:18 -04:00
Lucas Berger 214e59d6e2 docs(phase-14): update tracking after wave 1 2026-06-12 08:27:39 -04:00
Lucas Berger 5c3bd5c1ea docs(14): record planning complete + pattern map 2026-06-12 08:10:03 -04:00
Lucas Berger 8742dd43a4 docs(14): create phase plan 2026-06-12 08:07:37 -04:00
Lucas Berger 5ab463ccbb docs: add backlog 999.17 (CI doc-only PR skip) + remove stale graph.html
CI / fast-checks (pull_request) Successful in 1m19s
CI / api (pull_request) Successful in 58s
CI / harness (pull_request) Successful in 3m16s
2026-06-11 22:29:26 -04:00
Lucas Berger fc5b06d343 Merge remote-tracking branch 'origin/main' into gsd/phase-13-real-lint-gate-eslint
CI / fast-checks (pull_request) Failing after 1m47s
CI / api (pull_request) Successful in 1m0s
CI / harness (pull_request) Successful in 3m30s
# Conflicts:
#	.planning/ROADMAP.md
2026-06-11 21:25:14 -04:00
Lucas Berger 90d94febea docs(13): mark phase complete — tracking updates 2026-06-11 21:00:55 -04:00
Lucas Berger f153b7199d docs(13-03): complete Prettier reformat + CI format gate plan 2026-06-11 20:44:52 -04:00
Lucas Berger 982438dc10 style(13-03): apply Prettier formatting across repo
Mechanical reformat — no logic changes. 398 files changed, 19125
insertions(+), 16457 deletions(-). Prettier 3.8.4 with .prettierrc
(singleQuote:true, semi:true, tabWidth:2, trailingComma:all,
printWidth:100). Isolated per D-13-08 for reviewability.
2026-06-11 20:35:18 -04:00
Lucas Berger 1453cbed76 docs(13-02): complete ESLint violation elimination plan 2026-06-11 20:25:47 -04:00
Lucas Berger 39e26561cf docs(13-01): complete lint gate foundation plan — SUMMARY + STATE + ROADMAP
Plan 13-01 complete: ESLint flat config + Prettier installed and wired,
SC-1 gate proven (exit 1 on deliberate violations), 119 real violations
inventoried for Plan 02 (api:42, pwa:77). STATE advanced to Plan 2 of 3.
2026-06-11 19:53:55 -04:00
Lucas Berger 66c54507ad docs(13): create phase plan 2026-06-11 19:27:50 -04:00
Lucas Berger 694253ecb0 docs(13): create phase plan — 3 plans (lint gate + Prettier format gate)
- 13-01: install ESLint v9/typescript-eslint/React/Prettier (pinned), flat config,
  package lint + root format scripts, root type:module; prove gate fails (SC-1)
- 13-02: fix all first-run violations across both apps, address-not-mask (D-13-05/06)
- 13-03: isolated Prettier reformat (D-13-08) + CI format:check step + green baseline (SC-2/SC-3)
- ROADMAP: add active Phase 13 entry + Progress row; mark backlog 999.16 promoted
2026-06-11 19:25:08 -04:00
Lucas Berger bcc9682a01 docs(roadmap): promote Phases 13 (real lint gate) + 14 (desktop e2e) into v1.1; fold backlog 999.5 self-service onboarding into admin-credential phase
CI / fast-checks (pull_request) Successful in 50s
CI / api (pull_request) Successful in 1m1s
CI / harness (pull_request) Successful in 3m33s
2026-06-11 19:13:31 -04:00
Lucas Berger b1851f475e docs(08): SUMMARY + VERIFICATION — phase 8 complete, CI-01 + CI-02 delivered
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 56s
CI / harness (pull_request) Successful in 3m23s
CI / publish (pull_request) Has been skipped
- 08-04-SUMMARY.md: publish job verified green (run #14), both tags pushed,
  security audit pass (PAT masked, --password-stdin), REGISTRY_PAT naming note
- 08-VERIFICATION.md: all six phase-8 ROADMAP criteria passed with evidence table
- REQUIREMENTS.md: CI-01 + CI-02 marked complete (checkboxes + traceability table)
- ROADMAP.md: phase 8 marked [x] complete (2026-06-11), 08-04 plan ticked
- STATE.md: phase complete, D-PAT-NAMING decision recorded, operator next steps updated
2026-06-11 16:17:53 -04:00
Lucas Berger 212d8c1691 docs(08-03): SUMMARY — harness green, 58 specs both profiles on cold CI stack
- Run #11 (PR #3): 58 passed in 1.6 min (iphone/WebKit + pixel/Chromium)
- 4 infrastructure fixes: API-reap at step boundary, IPv4-first for Vite, dev-user FK seed, reporter double-forward via pnpm
- No Phase 7 harness file modified (phase boundary D-01/D-02 held)
- Advance position to 08-04 (publish job)
2026-06-11 15:52:15 -04:00
Lucas Berger 2a34a94cc6 docs(08): correct premature completion — phase 8 + CI-01 still in progress
CI / fast-checks (pull_request) Successful in 48s
CI / api (pull_request) Successful in 57s
Plans 08-03 (harness UI-regression job) and 08-04 (publish job) are not yet
built; CI-01's definition includes the harness step (08-03). Revert phase 8
and CI-01 from complete back to in-progress.
2026-06-11 14:42:33 -04:00
Lucas Berger 78229168b9 docs(08-02): SUMMARY — PR gating jobs green on cold run 2026-06-11 14:37:32 -04:00
Lucas Berger 181d161da6 docs: add backlog 999.16 — wire real ESLint lint gate (deferred from phase 8) 2026-06-11 14:33:22 -04:00
Lucas Berger 087d9af117 docs(08-01): SUMMARY — probe fork answers recorded, plan complete
- Docker-executor mode confirmed; runs-on: ubuntu-latest (not self-hosted)
- MariaDB service container works; DB_HOST=mariadb; no mysql CLI in image
- actions/cache@v4 unreliable (timeout) — skip in Plans 02/03
- Playwright WebKit deps install cleanly; Phase-7 harness CI-feasible
- ChristopherHX/gitea-upload-artifact@v4 confirmed; actions/upload-artifact@v4 broken
- ${GITHUB_SHA:0:7} valid for image tags
- STATE.md: plan 08-01 complete, position advanced to 08-02 (Wave 2)
- ROADMAP.md: 08 phase progress updated (1/4 plans complete)
2026-06-11 10:16:26 -04:00
Lucas Berger 4a510f1d79 docs: add backlog item 999.15 — desktop e2e coverage; drop from phase 8 context 2026-06-11 09:36:53 -04:00
Lucas Berger 41b0b60291 docs(08): create phase plan 2026-06-11 09:34:48 -04:00
Lucas Berger 4e474cdd9c docs(08): create phase plan — 4 plans (runner-probe, PR jobs, harness, publish) 2026-06-11 09:26:48 -04:00
Lucas Berger 407bf1e91c docs(phase-07): complete phase execution 2026-06-11 02:29:36 -04:00