Commit Graph
58 Commits
Author SHA1 Message Date
Lucas Berger bf5f87eda8 docs(quick-260610-k1z): plan/summary/verification + STATE row (persist OIDC cookie, Verified) 2026-06-10 14:35:41 -04:00
Lucas Berger eef0b48537 docs(quick-260610-jlp): plan/summary + STATE row (how-to-enable fix, Verified) 2026-06-10 14:15:27 -04:00
Lucas Berger 914197f848 docs(quick-260610-i4x): plan/summary/verification + STATE row (node-cron→setInterval, Verified) 2026-06-10 13:09:09 -04:00
Lucas Berger 3b87fa4581 docs(quick-260610-hbu): plan/summary/verification + STATE row (reminder resilience, Verified) 2026-06-10 12:40:48 -04:00
Lucas Berger 0c2c26c375 docs(06-03): complete hasRrule server-side exposure plan 2026-06-10 11:20:17 -04:00
Lucas Berger b869fe0a93 docs(06-02): complete RRULE UNTIL/COUNT serialization plan 2026-06-10 11:04:04 -04:00
Lucas Berger 78a8cb5ccd docs(06-01): complete end-tracking math plan (D-04) 2026-06-10 10:51:16 -04:00
Lucas Berger 53913bb7fd docs(06): record planning complete + annotate roadmap 2026-06-10 10:37:02 -04:00
Lucas Berger f1a2de2cdc docs: resolve D-16 — FamilySync shared calendar synced (id 10) + marked is_shared=1
Operator created the shared 'FamilySync' calendar on the primary Fastmail
account; poller synced it; ran UPDATE calendars SET is_shared=1 WHERE id=10.
Shared color lane now populated; Phase 5 reminders fire on its events.
2026-06-10 10:34:41 -04:00
Lucas Berger cdbe94deb2 docs(state): record phase 6 context session 2026-06-10 09:33:43 -04:00
Lucas Berger 497daf6add docs: add deferred REQ-IDs to REQUIREMENTS traceability table
CAL-09..CAL-12 (v1.x) and DISP-01/DISP-02 (v2) were in the body but
absent from the Traceability table. v1 coverage stays 20/20; deferred
IDs listed separately. Resolves the REQUIREMENTS traceability todo.
2026-06-10 09:26:45 -04:00
Lucas Berger 7369c9f1d1 docs(quick-260610-czd): plan/summary + STATE quick-task row, resolve deployment.md dev-cmd todo 2026-06-10 09:25:24 -04:00
Lucas Berger b745515753 docs(quick-260610-cr8): plan/summary/verification + STATE quick-task row 2026-06-10 09:20:22 -04:00
Lucas Berger e496b5e00a docs(05-07): complete eventChangeDispatcher + syncCalendar diff plan 2026-06-09 22:06:14 -04:00
Lucas Berger 4ef6333201 docs(05-08): complete opt-out + reliability surface plan 2026-06-09 21:53:33 -04:00
Lucas Berger 8e741cf528 docs(05-06): complete reminderScheduler plan 2026-06-09 21:40:22 -04:00
Lucas Berger 9b04528fd6 docs(05-05): complete list-change push plan 2026-06-09 21:29:09 -04:00
Lucas Berger 60c247d8ed docs(05-04): complete push vertical slice plan 2026-06-09 21:16:23 -04:00
Lucas Berger f07c85d0c9 docs(05-03): complete pushCoalescer TDD plan 2026-06-09 21:00:22 -04:00
Lucas Berger fc6f534f0a docs(05-02): complete pushDispatcher TDD plan 2026-06-09 20:56:13 -04:00
Lucas Berger 1cc08f1bf1 docs(05-01): complete Wave-0 foundation plan 2026-06-09 20:52:23 -04:00
Lucas Berger 2cae72e9dd docs: capture todo - Gitea CI regression + Docker build/publish 2026-06-09 20:49:07 -04:00
Lucas Berger 36fb929a40 docs(05): create phase plan 2026-06-09 18:44:55 -04:00
Lucas Berger 3bbfbbc383 docs(state): record phase 5 context session 2026-06-09 15:13:07 -04:00
Lucas Berger ffaa44a9be docs(04-07): complete gap-closure plan — LIST-03 + T-04-08 closed, Phase 04 done
- 04-07-SUMMARY.md: documents rank-collation fix + owner-only guard, 184/184 tests
- STATE.md: Phase 04 marked complete (7/7 plans), progress 100%, decisions added
- ROADMAP.md: 04-07-PLAN.md checked off
2026-06-09 14:25:43 -04:00
Lucas Berger ca9e97879f docs(04-06): complete live-sync SSE vertical slice plan 2026-06-09 13:35:49 -04:00
Lucas Berger f12093c910 docs(04-05): complete drag-to-reorder plan 2026-06-09 13:19:35 -04:00
Lucas Berger 8ed105d467 docs(04-04): complete item-CRUD vertical slice plan 2026-06-09 13:04:48 -04:00
Lucas Berger 353431c8b4 docs(04-03): complete list-CRUD vertical slice plan 2026-06-09 12:48:00 -04:00
Lucas Berger 0fd4d66ee7 docs(04-01): complete lists foundation plan 2026-06-09 12:06:53 -04:00
Lucas Berger 197e138e3b docs(04): finalize phase plan (coverage gates + roadmap annotations) 2026-06-09 10:25:22 -04:00
Lucas Berger 9ee59065f1 docs(quick-260607-u8o): record SSE-over-Pangolin smoke test PASS 2026-06-07 21:51:38 -04:00
Lucas Berger ecdb2317c8 docs(state): record phase 4 context session 2026-06-07 21:32:10 -04:00
Lucas Berger 35871cd8cf roadmap(06): add Phase 6 — UX Polish
phase.add appended the entry after the 999.x backlog (the decimal backlog
convention confused the auto-placement). Moved it into Phase Details before
## Progress, added it to the top checklist + Progress table + execution order,
gave it goal/success-criteria/candidate-scope (promotes backlog 999.2/3/6/7/8/9),
renamed the dir to 06-ux-polish, and bumped STATE to 6 phases (50%).
2026-06-07 19:28:34 -04:00
Lucas Berger cca5205173 chore(03): close Phase 03 — transition to Phase 04
- 03-08-SUMMARY (Gate 2 record) written; phase marked complete (12/12)
- ROADMAP: Phase 3 [x] complete 2026-06-07; REQUIREMENTS updated
- STATE: advanced to Phase 4, focus + progress corrected (backlog 999.x were
  miscounted as milestone phases → reset total_phases to 5, 60%)
- PROJECT.md evolved: event CRUD / OIDC login / iOS PWA install moved to
  Validated (Phase 3); D-17 logged; Android install + onboarding-provider-setup
  kept Active
- removed stale .continue-here + one-shot HANDOFF.json

Carried forward: B5 (Android install), Phase 4 SSE entry gate (D-14), backlog 999.3-999.9.
2026-06-07 19:24:33 -04:00
Lucas Berger 69bc57221b docs(quick-260607-l6l): summary, state, handoff update + reminder-options todo
- 260607-l6l SUMMARY (executor + orchestrator review follow-ups)
- STATE.md: quick-task row + session continuity (edit/delete blocker resolved)
- HANDOFF.json: 3 write-path code bugs marked done; remaining = operator rebuild + Gate 2 human/device checkpoints
- new backlog todo: event-creation reminder/VALARM options
2026-06-07 15:39:43 -04:00
Lucas Berger 874f23de2f docs(quick-260606-tv8): sign-in redirect fix — summary + state 2026-06-06 21:42:58 -04:00
Lucas Berger b3eff3c677 docs(03): record gap-closure completion (03-09..03-12) in STATE + ROADMAP 2026-06-05 21:10:26 -04:00
Lucas Berger 40dfbb48d5 docs(03-06): complete edit/delete + sync toast plan 2026-06-05 18:48:17 -04:00
Lucas Berger dbd09bc2bb docs(03-05): complete event write UI plan — EventForm + client calls + FAB 2026-06-05 18:32:37 -04:00
Lucas Berger 82ab87a633 docs(03-04): complete outbox worker plan — state machine GREEN, wired at boot 2026-06-05 18:23:01 -04:00
Lucas Berger 95864e5dc8 docs(03-07): complete PWA install plan — manifest, InstallPrompt, icons 2026-06-05 18:07:59 -04:00
Lucas Berger 7398946aa8 docs(03-03): complete write API surface plan — enqueue-only endpoints GREEN 2026-06-05 17:59:53 -04:00
Lucas Berger 4eb7c28797 docs(03-02): complete broker primitives plan — vevent.ts + write.ts GREEN 2026-06-05 17:50:23 -04:00
Lucas Berger a487569c7e docs(03-01): complete foundation-scaffold plan 2026-06-05 17:41:41 -04:00
Lucas Berger 93302cf942 docs(03): finalize phase plan (8 plans, verified) 2026-06-05 17:08:16 -04:00
Lucas Berger 46cd35e4de docs(state): record phase 3 context session 2026-06-05 16:17:26 -04:00
Lucas Berger cd71b2bbe2 docs(phase-02): record follow-up todos (dev-run docs, traceability, DST spot-check) 2026-06-05 16:01:46 -04:00
Lucas Berger 45b4c40c12 docs(phase-02): evolve PROJECT.md + STATE after phase completion 2026-06-05 16:01:04 -04:00
Lucas Berger dabe2ccd57 docs(phase-02): record D-16 (shared calendar on primary FM account) + defer is_shared marking 2026-06-05 10:34:22 -04:00