Commit Graph
482 Commits
Author SHA1 Message Date
Lucas Berger b8d4a69b73 docs(phase-17): add security threat verification (9 closed, 0 open)
CI / changes (pull_request) Successful in 4s
CI / fast-checks (pull_request) Failing after 1m41s
CI / api (pull_request) Successful in 2m2s
CI / security (pull_request) Successful in 54s
CI / gate (pull_request) Has been cancelled
CI / harness (pull_request) Has been cancelled
2026-06-18 14:33:10 -04:00
Lucas Berger 881f2d2d18 test(17): complete UAT - 9 passed, 0 issues (playwright-cli verified) 2026-06-18 14:31:32 -04:00
Lucas Berger 6fa6725fe8 docs(17): add code review fix report (auto-loop, 3 iterations) 2026-06-18 14:06:03 -04:00
Lucas Berger c2ceebf130 docs(17): add deep code review report 2026-06-18 13:35:10 -04:00
Lucas BergerandClaude Opus 4.8 a986c74963 docs(phase-17): mark phase complete (pending human verification)
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-18 13:11:35 -04:00
Lucas BergerandClaude Opus 4.8 fcc02e3833 docs(17): add phase verification report (10/10 decisions delivered; human_needed for device-only checks)
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-18 13:11:23 -04:00
Lucas BergerandClaude Opus 4.8 9730d3dcdb docs(17): add code review report
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-18 13:06:20 -04:00
Lucas BergerandClaude Opus 4.8 ea49a4dc83 docs(phase-17): update tracking after wave 2
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-18 13:03:12 -04:00
Lucas Berger 4887ba1b5f chore: merge executor worktree (worktree-agent-a12887546a61a8053) 2026-06-18 12:58:59 -04:00
Lucas Berger aaf754d938 chore: merge executor worktree (worktree-agent-a65077bbd9885bf7e) 2026-06-18 12:58:58 -04:00
Lucas Berger 9e39a5c492 chore: merge executor worktree (worktree-agent-ad448992e936c77aa) 2026-06-18 12:58:57 -04:00
Lucas Berger f4c65d478a docs(17-06): complete admin polish plan — toasts + two-tab ARIA nav + e2e assertions 2026-06-18 12:58:06 -04:00
Lucas Berger caff8b4b0a docs(17-05): complete logout control + sheet centering plan
- Sign out control (D-07): LogOut icon, handleSignOut fire-and-best-effort, navigate /login
- Desktop centering (D-09): phone/desktop style branch on SettingsSheet, ChangePasswordSheet, LinkOidcSheet, CredentialSheet
- playwright-cli verified: centered modal @1280x720, bottom-sheet @390x844, Sign out redirects to /login
2026-06-18 12:54:43 -04:00
Lucas Berger 28e9ca9840 docs(17-03): complete phone layout overlap fix plan — SUMMARY.md
FAB lifted above BottomTabBar, phone content padding added, D-01
regression guard committed to layout.spec.ts; 3-profile e2e sweep green.
2026-06-18 12:54:30 -04:00
Lucas Berger 4cb16f8271 docs(17-04): complete brand wiring plan — BrandSlot logo, favicons, maskable icon fix, accent
- BrandSlot: placeholder div replaced with decorative logo img (ce95aa3)
- tokens.css: --brand-logo-border-radius 0, --color-member-0 #e8915a (df578fd)
- index.html: favicon.svg + favicon.ico links, theme-color #e8915a (df578fd)
- vite.config.ts: maskable icon fixed to /icon-maskable-512.png, theme_color #e8915a (df578fd)
- Build: green; manifest.webmanifest verified correct
2026-06-18 12:51:58 -04:00
Lucas Berger 9e080fb22a docs(phase-17): update tracking after wave 1 2026-06-18 12:45:49 -04:00
Lucas Berger 65e6222944 chore: merge executor worktree (worktree-agent-af89750bf86857964) 2026-06-18 12:44:24 -04:00
Lucas Berger d917157c63 docs(17-02): complete branding assets plan summary
Records approved brand decisions for plan 17-04:
- logo art approved (family-house redesign)
- brand accent #e8915a (warm amber)
- --brand-logo-border-radius: 0
2026-06-18 12:43:45 -04:00
Lucas Berger d01ec2388c docs(17-01): complete token groundwork plan — SUMMARY
tokens.css restructured to :root,[data-theme=light] combined selector;
--bottom-chrome-h added; all --sx-color-* overrides intact; build green;
layout.spec.ts pixel profile 15/15 pass; Schedule-X colors verified.
2026-06-18 12:14:45 -04:00
Lucas Berger eb0db8beef docs(17): create phase plan 2026-06-18 11:36:21 -04:00
Lucas Berger 280438b2d3 docs(17): create phase plan (6 plans, 2 waves) — UI optimization & polish 2026-06-18 11:34:04 -04:00
Lucas Berger 28cf79754a docs(17): add validation strategy 2026-06-18 11:19:24 -04:00
Lucas Berger f789a67f95 docs(17): research phase domain 2026-06-18 11:17:44 -04:00
Lucas Berger a1457a5b30 docs(17): UI design contract 2026-06-18 10:59:25 -04:00
Lucas Berger efeee02a36 Merge remote-tracking branch 'origin/main' into gsd/phase-17-ui-optimization-polish
# Conflicts:
#	.planning/STATE.md
2026-06-18 10:08:45 -04:00
Lucas Berger 91ab9d1f78 docs(19): ship phase 19 — PR #23 2026-06-17 22:49:45 -04:00
Lucas Berger abf7be782a docs(phase-19): add security threat verification (28/28 closed, threats_open: 0)
CI / changes (pull_request) Successful in 10s
CI / fast-checks (pull_request) Failing after 2m17s
CI / api (pull_request) Successful in 2m51s
CI / security (pull_request) Failing after 12s
CI / harness (pull_request) Successful in 5m9s
CI / gate (pull_request) Failing after 2s
2026-06-17 22:47:45 -04:00
Lucas Berger f3af130e9e docs(17): add workstream D — 4 UI findings from Phase 19 UAT (logout button, admin feedback, popup centering, admin nav) 2026-06-17 22:34:18 -04:00
Lucas Berger af0a70ccec test(19): complete UAT — Tests 1-3 pass live, 4 resolved-by-fix, 5→ship; 4 UI findings routed to Phase 17 2026-06-17 22:32:52 -04:00
Lucas Berger 73dd6a2383 docs(19): re-review after fixes — status clean (0 critical/warning, 2 info) 2026-06-17 20:50:25 -04:00
Lucas Berger 9cccf17ef9 chore: enable MemPalace discuss-time recall + KG mirror 2026-06-17 20:45:39 -04:00
Lucas Berger 5f74ae965d docs(19): add code review fix report 2026-06-17 20:42:51 -04:00
Lucas Berger 83e23d760d docs(state): record phase 17 context session 2026-06-17 20:37:02 -04:00
Lucas Berger 3784762817 docs(17): capture phase context (layout polish + branding + theme groundwork; dark mode/styling deferred) 2026-06-17 20:37:02 -04:00
Lucas Berger 916fb34f17 docs: add backlog items 999.20 (dark mode/theming) + 999.21 (styling refresh) 2026-06-17 20:34:02 -04:00
Lucas BergerandClaude Opus 4.8 46eaf070ea chore: enable MemPalace for project and ignore per-project files
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-17 20:12:50 -04:00
Lucas Berger 4b635784e4 docs(19): add code review report 2026-06-17 20:08:26 -04:00
Lucas Berger 37fd896ce9 docs(phase-19): mark phase complete (verification passed, 5/5 plans) 2026-06-17 20:00:21 -04:00
Lucas Berger 0aca22f743 docs(19): verification passed (21/21) after blocker fix; UAT for live/CI items 2026-06-17 20:00:00 -04:00
Lucas Berger 9b10d875d4 docs(phase-19): update tracking after wave 4 2026-06-17 17:44:10 -04:00
Lucas Berger 11977fddf4 chore: merge executor worktree (worktree-agent-ad5628ea37541e256) 2026-06-17 17:28:49 -04:00
Lucas Berger 63beb74650 docs(19-04): complete PWA login UI + account management surfaces plan 2026-06-17 17:26:07 -04:00
Lucas Berger eba0bb095d docs(19-05): complete dev-bypass rework + harness + CI plan (checkpoint) 2026-06-17 17:22:39 -04:00
Lucas Berger 1cf572a2b9 docs(phase-19): update tracking after wave 3 2026-06-17 17:06:30 -04:00
Lucas Berger e0d471a5d5 docs(19-03): complete local-auth middleware wiring plan 2026-06-17 17:00:42 -04:00
Lucas Berger eb090bb57e docs(phase-19): update tracking after wave 2 2026-06-17 16:42:17 -04:00
Lucas Berger f167031292 docs(19-02): complete admin+me account management plan summary 2026-06-17 16:40:50 -04:00
Lucas Berger 13e3757e88 docs(phase-19): update tracking after wave 1 2026-06-17 16:26:23 -04:00
Lucas Berger d22da015cb docs(19-01): complete local-auth foundation plan (checkpoint reached at Task 4) 2026-06-17 16:19:25 -04:00
Lucas Berger f96282a767 docs(19): add PATTERNS.md (codebase analog map for planning) 2026-06-17 16:08:36 -04:00