chore: archive v1.0 milestone files
2026-06-10 17:47:15 -04:00
Lucas Berger
fa90b7cf86
docs(phase-06): finalize 06-04/05/06 summaries + tracking
...
- 06-04-SUMMARY: pulse keyframe checkpoint PASS (playwright-cli); CP-04.3 iOS device-only noted
- 06-05-SUMMARY: TDD RED/GREEN + dead-end guard follow-up fix; playwright-cli cold-load + 401 PASS
- 06-06-SUMMARY: end-tracking/recurrence-bound/series-prompt/all-day-pill; Schedule-X selector fix noted
- ROADMAP: mark 06-04/05/06 complete; phase 6 row updated to 6/6 Complete 2026-06-10
- STATE: phase 06 position/status updated; 3 new metric rows; 6 new decisions; phase-level UX fixes (AppNav/BottomTabBar) documented; residual device-only items added to Blockers
2026-06-10 16:30:01 -04:00
Lucas Berger
893e687614
docs: expand backlog 999.4 — per-event reminder config + scheduler honors VALARM
...
Folded the new capture into 999.4 instead of a fragmented duplicate:
- Half A (existing): author per-event VALARM in the event form, incl. 'no reminder'.
- Half B (new, 2026-06-10): reminderScheduler honors each event's VALARM TRIGGER
instead of the hardcoded 15-min lead, and fires nothing when there's no alarm —
preserving the catch-up + per-uid exactly-once dedup guarantees.
2026-06-10 15:18:37 -04:00
Lucas Berger
dc50919de7
docs: add backlog 999.13 — reduce event write-back latency (outbox 15s drain → event-driven)
2026-06-10 15:08:35 -04:00
Lucas Berger
2b78c3d593
docs: add backlog 999.12 — assistant-driven mobile-browser UI testing (mobile viewport + authed PWA)
2026-06-10 15:07:45 -04:00
Lucas Berger
83f7cbc34d
docs: mark Phase 5 (web-push) complete — UAT 1/2/5 pass, T3 dropped, T4 deferred to Phase 6
2026-06-10 14:58:28 -04:00
Lucas Berger
0c2c26c375
docs(06-03): complete hasRrule server-side exposure plan
2026-06-10 11:20:17 -04:00
Lucas Berger
b869fe0a93
docs(06-02): complete RRULE UNTIL/COUNT serialization plan
2026-06-10 11:04:04 -04:00
Lucas Berger
78a8cb5ccd
docs(06-01): complete end-tracking math plan (D-04)
2026-06-10 10:51:16 -04:00
Lucas Berger
7de1f2482e
docs: add backlog 999.10 (admin Settings section) + 999.11 (initial setup wizard)
...
999.10: in-app admin UI to manage app passwords + designate the shared
calendar (replaces manual is_shared DB write, D-16).
999.11: first-run setup wizard for env vars/VAPID/DB/app-password with
validation (motivated by the truncated-VAPID-key setup friction).
2026-06-10 10:38:36 -04:00
Lucas Berger and Claude Opus 4.8
456121969f
docs(06): create ux-polish phase plan (6 plans, 2 waves)
...
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-10 10:25:41 -04:00
Lucas Berger
17dfaac5f2
docs(05): mark phase pending iOS/Android device UAT (verification human_needed)
2026-06-09 22:48:07 -04:00
Lucas Berger
e496b5e00a
docs(05-07): complete eventChangeDispatcher + syncCalendar diff plan
2026-06-09 22:06:14 -04:00
Lucas Berger
4ef6333201
docs(05-08): complete opt-out + reliability surface plan
2026-06-09 21:53:33 -04:00
Lucas Berger
8e741cf528
docs(05-06): complete reminderScheduler plan
2026-06-09 21:40:22 -04:00
Lucas Berger
9b04528fd6
docs(05-05): complete list-change push plan
2026-06-09 21:29:09 -04:00
Lucas Berger
60c247d8ed
docs(05-04): complete push vertical slice plan
2026-06-09 21:16:23 -04:00
Lucas Berger
f07c85d0c9
docs(05-03): complete pushCoalescer TDD plan
2026-06-09 21:00:22 -04:00
Lucas Berger
fc6f534f0a
docs(05-02): complete pushDispatcher TDD plan
2026-06-09 20:56:13 -04:00
Lucas Berger
1cc08f1bf1
docs(05-01): complete Wave-0 foundation plan
2026-06-09 20:52:23 -04:00
Lucas Berger
1ecca03f53
docs(05): create phase 5 web-push plan (8 plans, 6 waves)
2026-06-09 18:39:05 -04:00
Lucas Berger
ffaa44a9be
docs(04-07): complete gap-closure plan — LIST-03 + T-04-08 closed, Phase 04 done
...
- 04-07-SUMMARY.md: documents rank-collation fix + owner-only guard, 184/184 tests
- STATE.md: Phase 04 marked complete (7/7 plans), progress 100%, decisions added
- ROADMAP.md: 04-07-PLAN.md checked off
2026-06-09 14:25:43 -04:00
Lucas Berger
797338424d
docs(04): gap-closure plan 04-07 (rank collation + isShared owner guard)
2026-06-09 14:07:14 -04:00
Lucas Berger
ca9e97879f
docs(04-06): complete live-sync SSE vertical slice plan
2026-06-09 13:35:49 -04:00
Lucas Berger
f12093c910
docs(04-05): complete drag-to-reorder plan
2026-06-09 13:19:35 -04:00
Lucas Berger
8ed105d467
docs(04-04): complete item-CRUD vertical slice plan
2026-06-09 13:04:48 -04:00
Lucas Berger
353431c8b4
docs(04-03): complete list-CRUD vertical slice plan
2026-06-09 12:48:00 -04:00
Lucas Berger
0fd4d66ee7
docs(04-01): complete lists foundation plan
2026-06-09 12:06:53 -04:00
Lucas Berger and Claude Opus 4.8
38fa6f448b
docs(04): create phase plan — 6 plans across 5 waves for shared lists + live sync
...
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-09 10:21:53 -04:00
Lucas Berger
35871cd8cf
roadmap(06): add Phase 6 — UX Polish
...
phase.add appended the entry after the 999.x backlog (the decimal backlog
convention confused the auto-placement). Moved it into Phase Details before
## Progress, added it to the top checklist + Progress table + execution order,
gave it goal/success-criteria/candidate-scope (promotes backlog 999.2/3/6/7/8/9),
renamed the dir to 06-ux-polish, and bumped STATE to 6 phases (50%).
2026-06-07 19:28:34 -04:00
Lucas Berger
cca5205173
chore(03): close Phase 03 — transition to Phase 04
...
- 03-08-SUMMARY (Gate 2 record) written; phase marked complete (12/12)
- ROADMAP: Phase 3 [x] complete 2026-06-07; REQUIREMENTS updated
- STATE: advanced to Phase 4, focus + progress corrected (backlog 999.x were
miscounted as milestone phases → reset total_phases to 5, 60%)
- PROJECT.md evolved: event CRUD / OIDC login / iOS PWA install moved to
Validated (Phase 3); D-17 logged; Android install + onboarding-provider-setup
kept Active
- removed stale .continue-here + one-shot HANDOFF.json
Carried forward: B5 (Android install), Phase 4 SSE entry gate (D-14), backlog 999.3-999.9.
2026-06-07 19:24:33 -04:00
Lucas Berger
cee7f0bad0
docs(backlog): add 999.6-999.9 (all-day visual, form end-tracking + all-day edit off-by-one, recurrence bound, recurring series edit)
...
Captured from Gate 2 live testing 2026-06-07:
- 999.6 all-day events need distinct visual treatment
- 999.7 event form: auto-advance end when start moves; + latent all-day EDIT
off-by-one (edit grows the event by a day — write/display convert inclusive
<-> exclusive but the edit form does not)
- 999.8 recurrence bound (repeat-until/count) so a recurring event isn't one
giant multi-month event; verify daily-vs-weekly selection
- 999.9 edit a recurring series (whole-series edit; per-occurrence already v1.x)
2026-06-07 19:13:08 -04:00
Lucas Berger
29b8c02715
docs(03): Gate 2 progress — A3 distinct colors + iOS install verified; backlog 999.5 (provider setup)
...
A3 PASS (distinct colors after collision fix), B1 PASS (wife installed + logged
in on iPhone). Added backlog 999.5: first-login provider-setup prompt to attach
each member's own Fastmail app password (per-member personal calendar, D-09).
Remaining Gate 2: A2, B2/B3/B4, D2, D3 (quick operator confirms); B5/C deferred.
2026-06-07 18:15:51 -04:00
Lucas Berger
86069b89c1
docs(backlog): promote session-timeout + event-reminder todos to backlog (999.3/999.4)
2026-06-07 18:01:18 -04:00
Lucas Berger
505f64ed93
docs: add backlog item 999.2 — slick unauthenticated-entry (no login flash)
2026-06-06 22:11:33 -04:00
Lucas Berger
b3eff3c677
docs(03): record gap-closure completion (03-09..03-12) in STATE + ROADMAP
2026-06-05 21:10:26 -04:00
Lucas Berger
d1658bd1db
docs(03): gap-closure plans 03-09..03-12 for write-path review findings
2026-06-05 19:20:25 -04:00
Lucas Berger
40dfbb48d5
docs(03-06): complete edit/delete + sync toast plan
2026-06-05 18:48:17 -04:00
Lucas Berger
dbd09bc2bb
docs(03-05): complete event write UI plan — EventForm + client calls + FAB
2026-06-05 18:32:37 -04:00
Lucas Berger
82ab87a633
docs(03-04): complete outbox worker plan — state machine GREEN, wired at boot
2026-06-05 18:23:01 -04:00
Lucas Berger
95864e5dc8
docs(03-07): complete PWA install plan — manifest, InstallPrompt, icons
2026-06-05 18:07:59 -04:00
Lucas Berger
7398946aa8
docs(03-03): complete write API surface plan — enqueue-only endpoints GREEN
2026-06-05 17:59:53 -04:00
Lucas Berger
4eb7c28797
docs(03-02): complete broker primitives plan — vevent.ts + write.ts GREEN
2026-06-05 17:50:23 -04:00
Lucas Berger
a487569c7e
docs(03-01): complete foundation-scaffold plan
2026-06-05 17:41:41 -04:00
Lucas Berger
9dd08d28d1
docs(03): create phase plan (8 plans, 5 waves)
2026-06-05 16:57:01 -04:00
Lucas Berger
edf9649a21
docs(phase-02): complete phase — mark roadmap + requirements traceability
2026-06-05 16:01:15 -04:00
Lucas Berger
00a4e66a8d
docs(phase-02): update tracking after wave 3
2026-06-05 10:44:57 -04:00
Lucas Berger
bfddcb1da2
docs(phase-02): update tracking after wave 2
2026-06-05 10:33:53 -04:00
Lucas Berger
6dc5d77f60
docs(phase-02): update tracking after wave 1
2026-06-05 09:38:23 -04:00
Lucas Berger
8bd52c6923
docs: add backlog item 999.1 — treat Fastmail as a calendar provider, support adding more
2026-06-04 15:12:20 -04:00