Commit Graph
60 Commits
Author SHA1 Message Date
Lucas Berger 05e1c9e556 docs(04): capture phase context 2026-06-07 21:32:09 -04:00
Lucas Berger 35871cd8cf roadmap(06): add Phase 6 — UX Polish
phase.add appended the entry after the 999.x backlog (the decimal backlog
convention confused the auto-placement). Moved it into Phase Details before
## Progress, added it to the top checklist + Progress table + execution order,
gave it goal/success-criteria/candidate-scope (promotes backlog 999.2/3/6/7/8/9),
renamed the dir to 06-ux-polish, and bumped STATE to 6 phases (50%).
2026-06-07 19:28:34 -04:00
Lucas Berger cca5205173 chore(03): close Phase 03 — transition to Phase 04
- 03-08-SUMMARY (Gate 2 record) written; phase marked complete (12/12)
- ROADMAP: Phase 3 [x] complete 2026-06-07; REQUIREMENTS updated
- STATE: advanced to Phase 4, focus + progress corrected (backlog 999.x were
  miscounted as milestone phases → reset total_phases to 5, 60%)
- PROJECT.md evolved: event CRUD / OIDC login / iOS PWA install moved to
  Validated (Phase 3); D-17 logged; Android install + onboarding-provider-setup
  kept Active
- removed stale .continue-here + one-shot HANDOFF.json

Carried forward: B5 (Android install), Phase 4 SSE entry gate (D-14), backlog 999.3-999.9.
2026-06-07 19:24:33 -04:00
Lucas Berger d71b15cd02 docs(03): Gate 2 complete for Phase 03 scope — D3 recurring write verified, recurring-series delete confirmed
Weekly recurring create writes valid RRULE and recurred in Fastmail; repeat-bound
+ per-occurrence-duration UX gaps backlogged (999.7/999.8). Deleting the recurring
series cleared master + all occurrences in one delete. Remaining deferred by
design: B5 (Android), C (SSE smoke — Phase 4 entry gate).
2026-06-07 19:19:57 -04:00
Lucas Berger f656a41d1c docs(03): Gate 2 substantially complete — A/B/D verified; only D3 quick confirm left
A2 (transparent SSO), B2/B3/B4 (iOS standalone + load-bearing standalone login),
D2 (all-day, after off-by-one fix) all PASS. Remaining: D3 weekly recurring
(quick). Deferred: B5 Android, C SSE (Phase 4 entry gate).
2026-06-07 18:40:01 -04:00
Lucas Berger 29b8c02715 docs(03): Gate 2 progress — A3 distinct colors + iOS install verified; backlog 999.5 (provider setup)
A3 PASS (distinct colors after collision fix), B1 PASS (wife installed + logged
in on iPhone). Added backlog 999.5: first-login provider-setup prompt to attach
each member's own Fastmail app password (per-member personal calendar, D-09).
Remaining Gate 2: A2, B2/B3/B4, D2, D3 (quick operator confirms); B5/C deferred.
2026-06-07 18:15:51 -04:00
Lucas Berger cdb097c5b3 docs(03): record Gate 2 live-verification results (2026-06-07)
A1 (OIDC login → app), D1/D4/D5 (create/edit/delete round-trips), D6 (412
conflict), and /health-over-tunnel verified live this session via operator
browser testing + outbox evidence. Remaining: A2/A3 + D2/D3 (desktop, quick),
B (iOS device, load-bearing), C (SSE — Phase 4 entry gate per D-14).
2026-06-07 18:02:53 -04:00
Lucas Berger 3ae7724df1 wip: phase 03 Gate 2 paused — live bring-up working; edit/delete join fix is the next blocker 2026-06-06 22:42:06 -04:00
Lucas Berger 505f64ed93 docs: add backlog item 999.2 — slick unauthenticated-entry (no login flash) 2026-06-06 22:11:33 -04:00
Lucas Berger ca87c023ef wip: phase 03 paused — gap-closure done, docker bring-up awaiting auth+PWA decisions 2026-06-05 21:48:17 -04:00
Lucas Berger ad181e7b2a docs(03-11): complete outbox durability + etag fix plan summary (CR-04, CR-05, WR-02) 2026-06-05 21:08:07 -04:00
Lucas Berger aefdde13bd docs(03-10): complete outbox ICS builder wiring plan summary
CR-02, CR-03, WR-01, WR-04, WR-08, IN-01 closed.
2026-06-05 20:53:04 -04:00
Lucas Berger 1fc56f42d0 merge(03-12): EventForm edit/a11y gap closure (WR-03/05/07, IN-03) 2026-06-05 20:43:45 -04:00
Lucas Berger a30a16b18a docs(03-12): complete EventForm gap-closure plan — WR-03/05/07, IN-03/04, PWA assets 2026-06-05 20:43:12 -04:00
Lucas Berger 0d3883ee02 docs(03-09): complete plan 09 summary — schema rename + OIDC resolution
CR-01: eventFieldsSchema aligned to canonical title/start/end (PWA contract)
CR-06: resolveUserId async with upsertUser on all 5 write handlers
19 tests pass; tsc clean
2026-06-05 20:42:13 -04:00
Lucas Berger 941c4d621f docs(03): revise gap plans 03-10/11/12 per checker feedback 2026-06-05 19:27:19 -04:00
Lucas Berger d1658bd1db docs(03): gap-closure plans 03-09..03-12 for write-path review findings 2026-06-05 19:20:25 -04:00
Lucas Berger 628894c8c2 docs(03): add code review report 2026-06-05 19:11:12 -04:00
Lucas Berger 1f8775e7b6 docs(03-08): scaffold Gate 2 results + record production build status
- PWA build: CLEAN — 1818 modules, sw.js + workbox generated (build SHA 40dfbb4)
- API build: CLEAN — tsc passed, no errors
- 03-GATE2-RESULTS.md created with deploy header (URL TBD), full Gate 2 checklist
  (all rows marked PENDING — operator/device), and operator-setup section covering:
  Authelia OIDC client registration, OIDC_AUTH_EXTERNAL_URL, Pangolin/Newt Mode A rig,
  DB schema push, and /health tunnel verification
2026-06-05 18:51:37 -04:00
Lucas Berger 40dfbb48d5 docs(03-06): complete edit/delete + sync toast plan 2026-06-05 18:48:17 -04:00
Lucas Berger dbd09bc2bb docs(03-05): complete event write UI plan — EventForm + client calls + FAB 2026-06-05 18:32:37 -04:00
Lucas Berger 82ab87a633 docs(03-04): complete outbox worker plan — state machine GREEN, wired at boot 2026-06-05 18:23:01 -04:00
Lucas Berger 95864e5dc8 docs(03-07): complete PWA install plan — manifest, InstallPrompt, icons 2026-06-05 18:07:59 -04:00
Lucas Berger 7398946aa8 docs(03-03): complete write API surface plan — enqueue-only endpoints GREEN 2026-06-05 17:59:53 -04:00
Lucas Berger 4eb7c28797 docs(03-02): complete broker primitives plan — vevent.ts + write.ts GREEN 2026-06-05 17:50:23 -04:00
Lucas Berger a487569c7e docs(03-01): complete foundation-scaffold plan 2026-06-05 17:41:41 -04:00
Lucas Berger 93302cf942 docs(03): finalize phase plan (8 plans, verified) 2026-06-05 17:08:16 -04:00
Lucas Berger 9dd08d28d1 docs(03): create phase plan (8 plans, 5 waves) 2026-06-05 16:57:01 -04:00
Lucas Berger 6f5110266d docs(03): UI design contract
Establishes Phase 3 visual and interaction contract for event write-back
(EventForm, SyncStateToast, DeleteConfirmationDialog, calendar picker) and
PWA install surfaces (iOS A2HS walkthrough, Android beforeinstallprompt).
Inherits Phase 2 token layer in full; activates --color-destructive for
delete actions.
2026-06-05 16:39:15 -04:00
Lucas Berger 7b0463d25e docs(03): add research + validation strategy 2026-06-05 16:33:30 -04:00
Lucas Berger 364b6e68b0 docs(03): research phase domain 2026-06-05 16:32:38 -04:00
Lucas Berger e579a6870a docs(03): capture phase context 2026-06-05 16:17:26 -04:00
Lucas Berger b794785e09 test(02): human UAT approved — all 4 success criteria; verification passed 2026-06-05 16:00:27 -04:00
Lucas Berger 11595e7924 docs(02-05): complete plan 05 autonomous tasks — SUMMARY.md 2026-06-05 10:59:31 -04:00
Lucas Berger 7b32bc1456 docs(02-04): complete CalendarShell plan — SUMMARY.md 2026-06-05 10:44:04 -04:00
Lucas Berger 010ef78230 docs(02-02): complete windowed events + expansion plan
- SUMMARY.md created with task outcomes, deviations, self-check
- Task 3 deferral documented (shared calendar marking pending operator setup)
2026-06-05 10:32:30 -04:00
Lucas Berger 5435df6bbe docs(02-03): complete plan 03 summary — token layer, calendar config, hydration, store 2026-06-05 09:49:39 -04:00
Lucas Berger 2d75b2b73b docs(02-01): complete plan 01 — schema columns, test harness, dev-auth bypass summary 2026-06-05 09:35:53 -04:00
Lucas Berger 81d5c61aa5 wip: calendar-display paused — planned, not executed (0/5 plans) 2026-06-04 15:29:39 -04:00
Lucas Berger 8bd52c6923 docs: add backlog item 999.1 — treat Fastmail as a calendar provider, support adding more 2026-06-04 15:12:20 -04:00
Lucas Berger fc4cc2ccf8 docs(02): create phase plan 2026-06-04 15:09:55 -04:00
Lucas Berger b842955612 docs(02): create calendar-display phase plan (5 plans, 4 waves) 2026-06-04 14:56:57 -04:00
Lucas Berger 5e14413024 docs(02): add pattern map 2026-06-04 14:47:28 -04:00
Lucas Berger a707f8d9ca docs(02): add research and validation strategy 2026-06-04 14:44:14 -04:00
Lucas Berger e9fcd7a372 docs(02): research calendar display phase 2026-06-04 14:43:23 -04:00
Lucas Berger f1604b5057 docs(02): UI design contract 2026-06-04 14:24:20 -04:00
Lucas Berger 79a18b9ea2 docs(02): add UI design contract for calendar display phase
Specifies the token-layer architecture, Schedule-X as the rendering
library (all four views, CSS-var theming, per-calendar color), per-member
event colors, shared-family rose (#F25C7A), spacing/typography/breakpoints,
component inventory, and copywriting contract for Phase 2.
2026-06-04 14:21:57 -04:00
Lucas Berger dbec9b510c docs(02): capture phase context 2026-06-04 14:14:07 -04:00
Lucas Berger 5bed2228b7 test(01): verification (human_needed, 11/13) + persist Gate 2 human-UAT
Code verified against codebase, 24 tests pass, CAL-01 + CAL-08 proven live.
AUTH-01/02/03 live login + SSE-over-Pangolin smoke test require operator infra —
tracked as 01-HUMAN-UAT.md (status: partial).
2026-06-04 11:44:52 -04:00
Lucas Berger 0b074cd568 docs(01-04): record CAL-08 GO decision — broker read path proven live
Live spike against me@lucasberger.ca: one app password enumerated both account
calendars (PROPFIND), and a REPORT fetched + cached 503 real events into MariaDB
with correct D-13 timed/all-day handling (CAL-01). Per-member app-password model
(D-09) validated; no cross-account ACL needed; no fallback required. Gate 2 (live
Authelia/Pangolin login + SSE smoke test) remains pending operator action.
2026-06-04 11:39:44 -04:00