Lucas Berger 8e741cf528 docs(05-06): complete reminderScheduler plan 2026-06-09 21:40:22 -04:00
Lucas Berger 9b04528fd6 docs(05-05): complete list-change push plan 2026-06-09 21:29:09 -04:00
Lucas Berger 60c247d8ed docs(05-04): complete push vertical slice plan 2026-06-09 21:16:23 -04:00
Lucas Berger f07c85d0c9 docs(05-03): complete pushCoalescer TDD plan 2026-06-09 21:00:22 -04:00
Lucas Berger fc6f534f0a docs(05-02): complete pushDispatcher TDD plan 2026-06-09 20:56:13 -04:00
Lucas Berger 1cc08f1bf1 docs(05-01): complete Wave-0 foundation plan 2026-06-09 20:52:23 -04:00
Lucas Berger 1ecca03f53 docs(05): create phase 5 web-push plan (8 plans, 6 waves) 2026-06-09 18:39:05 -04:00
Lucas Berger ffaa44a9be docs(04-07): complete gap-closure plan — LIST-03 + T-04-08 closed, Phase 04 done
- 04-07-SUMMARY.md: documents rank-collation fix + owner-only guard, 184/184 tests
- STATE.md: Phase 04 marked complete (7/7 plans), progress 100%, decisions added
- ROADMAP.md: 04-07-PLAN.md checked off
2026-06-09 14:25:43 -04:00
Lucas Berger 797338424d docs(04): gap-closure plan 04-07 (rank collation + isShared owner guard) 2026-06-09 14:07:14 -04:00
Lucas Berger ca9e97879f docs(04-06): complete live-sync SSE vertical slice plan 2026-06-09 13:35:49 -04:00
Lucas Berger f12093c910 docs(04-05): complete drag-to-reorder plan 2026-06-09 13:19:35 -04:00
Lucas Berger 8ed105d467 docs(04-04): complete item-CRUD vertical slice plan 2026-06-09 13:04:48 -04:00
Lucas Berger 353431c8b4 docs(04-03): complete list-CRUD vertical slice plan 2026-06-09 12:48:00 -04:00
Lucas Berger 0fd4d66ee7 docs(04-01): complete lists foundation plan 2026-06-09 12:06:53 -04:00
Lucas BergerandClaude Opus 4.8 38fa6f448b docs(04): create phase plan — 6 plans across 5 waves for shared lists + live sync
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-09 10:21:53 -04:00
Lucas Berger 35871cd8cf roadmap(06): add Phase 6 — UX Polish
phase.add appended the entry after the 999.x backlog (the decimal backlog
convention confused the auto-placement). Moved it into Phase Details before
## Progress, added it to the top checklist + Progress table + execution order,
gave it goal/success-criteria/candidate-scope (promotes backlog 999.2/3/6/7/8/9),
renamed the dir to 06-ux-polish, and bumped STATE to 6 phases (50%).
2026-06-07 19:28:34 -04:00
Lucas Berger cca5205173 chore(03): close Phase 03 — transition to Phase 04
- 03-08-SUMMARY (Gate 2 record) written; phase marked complete (12/12)
- ROADMAP: Phase 3 [x] complete 2026-06-07; REQUIREMENTS updated
- STATE: advanced to Phase 4, focus + progress corrected (backlog 999.x were
  miscounted as milestone phases → reset total_phases to 5, 60%)
- PROJECT.md evolved: event CRUD / OIDC login / iOS PWA install moved to
  Validated (Phase 3); D-17 logged; Android install + onboarding-provider-setup
  kept Active
- removed stale .continue-here + one-shot HANDOFF.json

Carried forward: B5 (Android install), Phase 4 SSE entry gate (D-14), backlog 999.3-999.9.
2026-06-07 19:24:33 -04:00
Lucas Berger cee7f0bad0 docs(backlog): add 999.6-999.9 (all-day visual, form end-tracking + all-day edit off-by-one, recurrence bound, recurring series edit)
Captured from Gate 2 live testing 2026-06-07:
- 999.6 all-day events need distinct visual treatment
- 999.7 event form: auto-advance end when start moves; + latent all-day EDIT
  off-by-one (edit grows the event by a day — write/display convert inclusive
  <-> exclusive but the edit form does not)
- 999.8 recurrence bound (repeat-until/count) so a recurring event isn't one
  giant multi-month event; verify daily-vs-weekly selection
- 999.9 edit a recurring series (whole-series edit; per-occurrence already v1.x)
2026-06-07 19:13:08 -04:00
Lucas Berger 29b8c02715 docs(03): Gate 2 progress — A3 distinct colors + iOS install verified; backlog 999.5 (provider setup)
A3 PASS (distinct colors after collision fix), B1 PASS (wife installed + logged
in on iPhone). Added backlog 999.5: first-login provider-setup prompt to attach
each member's own Fastmail app password (per-member personal calendar, D-09).
Remaining Gate 2: A2, B2/B3/B4, D2, D3 (quick operator confirms); B5/C deferred.
2026-06-07 18:15:51 -04:00
Lucas Berger 86069b89c1 docs(backlog): promote session-timeout + event-reminder todos to backlog (999.3/999.4) 2026-06-07 18:01:18 -04:00
Lucas Berger 505f64ed93 docs: add backlog item 999.2 — slick unauthenticated-entry (no login flash) 2026-06-06 22:11:33 -04:00
Lucas Berger b3eff3c677 docs(03): record gap-closure completion (03-09..03-12) in STATE + ROADMAP 2026-06-05 21:10:26 -04:00
Lucas Berger d1658bd1db docs(03): gap-closure plans 03-09..03-12 for write-path review findings 2026-06-05 19:20:25 -04:00
Lucas Berger 40dfbb48d5 docs(03-06): complete edit/delete + sync toast plan 2026-06-05 18:48:17 -04:00
Lucas Berger dbd09bc2bb docs(03-05): complete event write UI plan — EventForm + client calls + FAB 2026-06-05 18:32:37 -04:00
Lucas Berger 82ab87a633 docs(03-04): complete outbox worker plan — state machine GREEN, wired at boot 2026-06-05 18:23:01 -04:00
Lucas Berger 95864e5dc8 docs(03-07): complete PWA install plan — manifest, InstallPrompt, icons 2026-06-05 18:07:59 -04:00
Lucas Berger 7398946aa8 docs(03-03): complete write API surface plan — enqueue-only endpoints GREEN 2026-06-05 17:59:53 -04:00
Lucas Berger 4eb7c28797 docs(03-02): complete broker primitives plan — vevent.ts + write.ts GREEN 2026-06-05 17:50:23 -04:00
Lucas Berger a487569c7e docs(03-01): complete foundation-scaffold plan 2026-06-05 17:41:41 -04:00
Lucas Berger 9dd08d28d1 docs(03): create phase plan (8 plans, 5 waves) 2026-06-05 16:57:01 -04:00
Lucas Berger edf9649a21 docs(phase-02): complete phase — mark roadmap + requirements traceability 2026-06-05 16:01:15 -04:00
Lucas Berger 00a4e66a8d docs(phase-02): update tracking after wave 3 2026-06-05 10:44:57 -04:00
Lucas Berger bfddcb1da2 docs(phase-02): update tracking after wave 2 2026-06-05 10:33:53 -04:00
Lucas Berger 6dc5d77f60 docs(phase-02): update tracking after wave 1 2026-06-05 09:38:23 -04:00
Lucas Berger 8bd52c6923 docs: add backlog item 999.1 — treat Fastmail as a calendar provider, support adding more 2026-06-04 15:12:20 -04:00
Lucas Berger fc4cc2ccf8 docs(02): create phase plan 2026-06-04 15:09:55 -04:00
Lucas Berger b842955612 docs(02): create calendar-display phase plan (5 plans, 4 waves) 2026-06-04 14:56:57 -04:00
Lucas Berger 6e74b3fc05 docs: capture D-14/D-15 (Gate 2 deferral + local-Newt test rig) + deployment runbook
- docs/deployment.md: operator runbook — Mode A (local Newt test rig) vs Mode B (Unraid
  prod), Authelia client block, env reference, Pangolin SSE idle-timeout note, Gate 2 checklist.
- ROADMAP: Phase 1 verification-status note (Gate 1 done, Gate 2 deferred); Phase 3 gains live
  AUTH + iOS standalone-PWA criterion; Phase 4 gains hard SSE-smoke entry gate (#1034).
- PROJECT.md: D-14 (Gate 2 deferral split) + D-15 (local Newt rig); CAL-08 marked validated.
- STATE: decisions/blockers updated to reflect deferral and dev-auth-bypass approach.
2026-06-04 11:55:31 -04:00
Lucas Berger fe8d5c8e4b docs(phase-01): mark 01-04 code complete after wave 3 2026-06-04 11:40:00 -04:00
Lucas Berger d2d8333bf8 docs(phase-01): update tracking after wave 2 (01-02 OIDC, 01-03 broker) 2026-06-04 11:10:44 -04:00
Lucas Berger ee4c71fa46 docs(01-01): clear Task 3 checkpoint, mark plan complete
Stack verified live (/health green, 4 tables pushed). Record Docker deviation in
SUMMARY, mark 01-01 complete in ROADMAP, clean up paused-setup handoff files.
2026-06-04 10:17:21 -04:00
Lucas Berger 3c51e423ff docs(01-foundation-broker-spike): create phase plan (4 plans, 3 waves) + SKELETON + validation map 2026-06-04 08:16:48 -04:00
Lucas Berger ac82d32a36 docs: create roadmap (5 phases) 2026-06-03 16:15:27 -04:00