Test 3 (1-week health check) dropped as non-gating. Test 4 (Android
event-change push) deferred to Phase 6 verification; its two blocking bugs
fixed + deployed (jlp how-to-enable link, ka9 silent-notification options).
Phase 5 UAT status → complete.
SettingsSheet 'How to enable' calls onClose instead of showing instructions;
leaves no recovery path once browser-blocked. Test 4 push delivery still
unverified (needs a subscribed Android session).
Delivery chain verified end-to-end on a real iPhone (subscribe -> VAPID
sign -> Apple 201 -> SW showNotification). Test 1 reminder did not fire on
schedule: node-cron missed the window tick + the scan has no catch-up, so
a missed tick drops the reminder permanently. Gap + fix direction recorded.
999.10: in-app admin UI to manage app passwords + designate the shared
calendar (replaces manual is_shared DB write, D-16).
999.11: first-run setup wizard for env vars/VAPID/DB/app-password with
validation (motivated by the truncated-VAPID-key setup friction).
Operator created the shared 'FamilySync' calendar on the primary Fastmail
account; poller synced it; ran UPDATE calendars SET is_shared=1 WHERE id=10.
Shared color lane now populated; Phase 5 reminders fire on its events.
Code-verified findings for all six D-01..D-13 fix areas: end-tracking
gap in EventForm, @keyframes pulse absent from tokens.css, hasRrule
missing from CalendarOccurrence type, and ical.js UNTIL/COUNT verified
against project node_modules. Includes validation architecture for TDD
and playwright-cli verification scopes.
Appends a new "Brand Assets & Iconography" section covering the
glyph+wordmark mark concept, SVG source-of-truth files, raster export
pipeline, full favicon set (SVG + ICO + index.html gaps), maskable
safe-zone spec, in-app logo usage surfaces, and a complete asset
manifest table. All existing UI-SPEC sections preserved verbatim.
CAL-09..CAL-12 (v1.x) and DISP-01/DISP-02 (v2) were in the body but
absent from the Traceability table. v1 coverage stays 20/20; deferred
IDs listed separately. Resolves the REQUIREMENTS traceability todo.
Specifies three new surfaces (permission prompt, settings sheet,
permission-denied banner) and notification copy templates for
NOTIF-01/02/03, all built from the existing Phase 2 token system.