Lucas Berger
51ec9c3e82
docs(roadmap): add Phase 20 — Admin Member Editor & Form Declutter
2026-06-18 15:14:25 -04:00
Lucas Berger and Claude Opus 4.8
a986c74963
docs(phase-17): mark phase complete (pending human verification)
...
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-18 13:11:35 -04:00
Lucas Berger and Claude Opus 4.8
ea49a4dc83
docs(phase-17): update tracking after wave 2
...
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-18 13:03:12 -04:00
Lucas Berger
9e080fb22a
docs(phase-17): update tracking after wave 1
2026-06-18 12:45:49 -04:00
Lucas Berger
eb0db8beef
docs(17): create phase plan
2026-06-18 11:36:21 -04:00
Lucas Berger
280438b2d3
docs(17): create phase plan (6 plans, 2 waves) — UI optimization & polish
2026-06-18 11:34:04 -04:00
Lucas Berger
3784762817
docs(17): capture phase context (layout polish + branding + theme groundwork; dark mode/styling deferred)
2026-06-17 20:37:02 -04:00
Lucas Berger
916fb34f17
docs: add backlog items 999.20 (dark mode/theming) + 999.21 (styling refresh)
2026-06-17 20:34:02 -04:00
Lucas Berger
37fd896ce9
docs(phase-19): mark phase complete (verification passed, 5/5 plans)
2026-06-17 20:00:21 -04:00
Lucas Berger
9b10d875d4
docs(phase-19): update tracking after wave 4
2026-06-17 17:44:10 -04:00
Lucas Berger
1cf572a2b9
docs(phase-19): update tracking after wave 3
2026-06-17 17:06:30 -04:00
Lucas Berger
eb090bb57e
docs(phase-19): update tracking after wave 2
2026-06-17 16:42:17 -04:00
Lucas Berger
13e3757e88
docs(phase-19): update tracking after wave 1
2026-06-17 16:26:23 -04:00
Lucas Berger
dc40ba9fb8
docs(19): create local-auth phase plan (5 plans, 4 waves)
2026-06-17 15:35:43 -04:00
Lucas Berger and Claude Opus 4.8
932fcb6e3f
chore(12): mark Phase 12 complete — UAT re-verified, all 6 gaps closed
...
- ROADMAP/STATE advanced to Phase 13 (real-lint-gate-eslint)
- Archived diagnosed UAT marked superseded (historical only)
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-16 16:17:18 -04:00
Lucas Berger
67c17a58eb
docs(12-06): complete setup-route gap-closure plan (VAPID equality + DB name)
2026-06-15 21:15:18 -04:00
Lucas Berger
f0fb31348d
docs(12): gap-closure plans 05-07 for 6 UAT gaps
2026-06-15 21:05:45 -04:00
Lucas Berger and Claude Opus 4.8
a07bb5bc67
fix(12): keep phase checkbox open — verification is human_needed, completion via verify-work
...
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-15 15:22:46 -04:00
Lucas Berger
49b82d2ef4
docs(12-04): update SUMMARY + STATE + ROADMAP for CR-01 VAPID gap closure
2026-06-15 15:16:41 -04:00
Lucas Berger and Claude Opus 4.8
523742c489
fix(12): revert premature phase-complete checkbox — verification pending
...
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-15 15:03:25 -04:00
Lucas Berger
1d8eed309b
docs(12-04): complete setup-wizard PWA plan — paused at human-verify checkpoint
2026-06-15 14:36:20 -04:00
Lucas Berger
a36f9ddb78
docs(12-03): complete first-login-claims plan summary
2026-06-15 14:16:59 -04:00
Lucas Berger
9d0aa6296a
docs(12-02): complete setup-routes plan — guard + router + OIDC fallback
2026-06-15 14:06:29 -04:00
Lucas Berger
c6d0db0119
docs(12-01): complete Phase 12 Plan 01 plan
2026-06-15 13:47:04 -04:00
Lucas Berger
f5bb71cd99
Merge remote-tracking branch 'origin/main' into gsd/phase-12-initial-setup-wizard
...
# Conflicts:
# .planning/ROADMAP.md
# .planning/STATE.md
2026-06-15 13:30:32 -04:00
Lucas Berger
2bf5a42ac2
docs(roadmap): add Phase 19 Local Auth (No-OIDC Mode)
2026-06-15 13:11:34 -04:00
Lucas Berger and Claude Opus 4.8
513fc887e4
docs(12): finalize plan — validation map, research resolution, roadmap waves
...
Resolve plan-checker warning (mark RESEARCH Open Questions RESOLVED),
fill VALIDATION.md Nyquist map (nyquist_compliant), record planning
complete in STATE, annotate ROADMAP wave dependencies.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-15 11:49:53 -04:00
Lucas Berger
fe40de83db
docs(12): create initial-setup-wizard phase plan (4 plans, 3 waves)
2026-06-15 11:46:30 -04:00
Lucas Berger and Claude Opus 4.8
ea93089b74
docs(18): verification passed + mark phase complete
...
Phase-goal verification: 7/7 decision-contract truths confirmed (D-01..D-07).
Browser round-trip re-confirmed via Playwright e2e against the live stack.
Mark phase 18 complete in STATE.md and ROADMAP.md.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com >
2026-06-14 23:08:56 -04:00
Lucas Berger
9481544a58
docs(18-04): complete admin timezone UI plan
2026-06-14 22:46:21 -04:00
Lucas Berger
9798d795a7
docs(18-03): complete broker rewire plan
2026-06-14 22:33:39 -04:00
Lucas Berger
08c39165bf
docs(18-02): complete admin timezone endpoints plan
2026-06-14 22:13:53 -04:00
Lucas Berger
ac60161726
docs(18-01): complete household timezone accessor + IANA validator plan
2026-06-14 22:08:37 -04:00
Lucas Berger
68a315e164
docs(18): create phase plan (4 plans, 3 waves)
2026-06-14 21:51:13 -04:00
Lucas Berger and Claude Opus 4.8
ff06a8479b
docs(phase-11): complete phase execution (5/5 plans, CAL-13/14 + NOTIF-04/05/06)
...
One deferred human check: live Fastmail VALARM round-trip + push (untestable in dev, backlog 999.19).
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-14 08:31:31 -04:00
Lucas Berger and Claude Opus 4.8
c86020ac21
docs(phase-11): mark gap-closure plan 11-05 complete; post-merge gate green (typecheck, API 347, PWA 206)
...
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-14 08:30:51 -04:00
Lucas Berger and Claude Opus 4.8
213f2547cf
docs: backlog 999.19 — dev user full app functionality without real-calendar sync
...
Captured during Phase 11 UAT: dev-bypass user has no calendar provider, blocking hands-on event/reminder testing.
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-14 06:59:35 -04:00
Lucas Berger
8cd4c0e2c2
docs(11-04): complete reminder picker plan — SUMMARY, STATE, ROADMAP, REQUIREMENTS
...
- 11-04-SUMMARY.md: allDay-aware select, edit pre-population, Custom-kept limitation, playwright smoke results
- STATE.md: advance plan counter, add key decisions, record session
- ROADMAP.md: phase 11 now Complete (4/4 summaries)
- REQUIREMENTS.md: CAL-13 + CAL-14 marked complete
2026-06-14 06:58:18 -04:00
Lucas Berger and Claude Opus 4.8
ca76b6118e
docs(phase-11): update tracking after wave 2
...
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-13 22:29:09 -04:00
Lucas Berger and Claude Opus 4.8
f3b74cc87e
docs(phase-11): update tracking after wave 1
...
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-13 22:10:22 -04:00
Lucas Berger and Claude Opus 4.8
7d070a6b69
docs: add Phase 18 (timezone) to roadmap; refresh knowledge graph
...
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com >
2026-06-13 21:54:54 -04:00
Lucas Berger
e169b138f9
docs(11): sequence plan 11-02 behind 11-01, cite D-09; record planning completion
2026-06-13 21:26:16 -04:00
Lucas Berger
cfeb8d8660
docs(11): create per-event-reminders phase plan (4 plans, 3 waves)
2026-06-13 21:20:09 -04:00
luckberg
f2e228360a
Merge branch 'main' into gsd/phase-10-admin-role-settings
CI / changes (pull_request) Successful in 2s
CI / fast-checks (pull_request) Successful in 1m26s
CI / api (pull_request) Successful in 1m3s
CI / harness (pull_request) Successful in 4m11s
CI / security (pull_request) Successful in 39s
CI / gate (pull_request) Successful in 1s
2026-06-13 16:50:06 -04:00
Lucas Berger
6dff7aa012
docs(roadmap): add Phase 17 (UI Optimization & Polish) + document phone bottom-bar overlap
...
Long-standing PWA phone-layout defect (BottomTabBar from Phase 04, not a
Phase 10 regression): the fixed bottom bar overlaps the New Event FAB and
the calendar colour legend at <=767px. Added Phase 17 to the v1.1 roadmap
with the defect as the seed item + fix sketch, and a pending todo
(resolves_phase: 17) with full repro/file detail.
2026-06-13 16:43:00 -04:00
Lucas Berger
94c62e213e
docs(phase-10): complete phase execution
2026-06-13 15:46:09 -04:00
Lucas Berger
3693da6d0b
docs(10-04): complete PWA admin surfaces plan
...
- SUMMARY.md for Plan 04 (AdminPage, CredentialSheet, SetupBanner, nav gating)
- STATE.md: plan advanced to last, progress 100%, decisions recorded
- ROADMAP.md: Phase 10 marked Complete (4/4 summaries)
2026-06-13 15:28:03 -04:00
Lucas Berger
0f41993a95
docs(10-03): complete admin-api-surface plan summary and state update
2026-06-13 14:57:30 -04:00
Lucas Berger
a5d88f75aa
docs(10-02): complete admin-role-primitives plan summary and state update
2026-06-13 14:39:49 -04:00
Lucas Berger
6405a93742
docs(10-01): complete v1.1 DB foundation plan summary and state update
2026-06-13 14:25:39 -04:00