Commit Graph
132 Commits
Author SHA1 Message Date
Lucas BergerandClaude Opus 4.8 513fc887e4 docs(12): finalize plan — validation map, research resolution, roadmap waves
Resolve plan-checker warning (mark RESEARCH Open Questions RESOLVED),
fill VALIDATION.md Nyquist map (nyquist_compliant), record planning
complete in STATE, annotate ROADMAP wave dependencies.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-15 11:49:53 -04:00
Lucas Berger 79111232b6 docs(state): record phase 18 context session 2026-06-14 21:25:46 -04:00
Lucas BergerandClaude Opus 4.8 ff06a8479b docs(phase-11): complete phase execution (5/5 plans, CAL-13/14 + NOTIF-04/05/06)
One deferred human check: live Fastmail VALARM round-trip + push (untestable in dev, backlog 999.19).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-14 08:31:31 -04:00
Lucas Berger 8cd4c0e2c2 docs(11-04): complete reminder picker plan — SUMMARY, STATE, ROADMAP, REQUIREMENTS
- 11-04-SUMMARY.md: allDay-aware select, edit pre-population, Custom-kept limitation, playwright smoke results
- STATE.md: advance plan counter, add key decisions, record session
- ROADMAP.md: phase 11 now Complete (4/4 summaries)
- REQUIREMENTS.md: CAL-13 + CAL-14 marked complete
2026-06-14 06:58:18 -04:00
Lucas BergerandClaude Opus 4.8 f3b74cc87e docs(phase-11): update tracking after wave 1
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 22:10:22 -04:00
Lucas BergerandClaude Opus 4.8 7d070a6b69 docs: add Phase 18 (timezone) to roadmap; refresh knowledge graph
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 21:54:54 -04:00
Lucas Berger e169b138f9 docs(11): sequence plan 11-02 behind 11-01, cite D-09; record planning completion 2026-06-13 21:26:16 -04:00
Lucas Berger 4e09ebdb75 docs(11): record UI-SPEC approval in state 2026-06-13 20:53:56 -04:00
Lucas Berger 771608d3d4 docs(11): capture phase context for per-event reminders 2026-06-13 20:49:25 -04:00
Lucas Berger e687cb96e7 docs(quick-260613-ndv): plan + summary + state for test-DB isolation 2026-06-13 17:15:45 -04:00
Lucas Berger 94c62e213e docs(phase-10): complete phase execution 2026-06-13 15:46:09 -04:00
Lucas Berger 3693da6d0b docs(10-04): complete PWA admin surfaces plan
- SUMMARY.md for Plan 04 (AdminPage, CredentialSheet, SetupBanner, nav gating)
- STATE.md: plan advanced to last, progress 100%, decisions recorded
- ROADMAP.md: Phase 10 marked Complete (4/4 summaries)
2026-06-13 15:28:03 -04:00
Lucas Berger 0f41993a95 docs(10-03): complete admin-api-surface plan summary and state update 2026-06-13 14:57:30 -04:00
Lucas Berger a5d88f75aa docs(10-02): complete admin-role-primitives plan summary and state update 2026-06-13 14:39:49 -04:00
Lucas Berger 6405a93742 docs(10-01): complete v1.1 DB foundation plan summary and state update 2026-06-13 14:25:39 -04:00
Lucas Berger df92bd89e8 docs(10): point STATE current-phase at Phase 10 2026-06-13 14:13:04 -04:00
Lucas Berger 159f37fe6a docs(10): record planning completion, annotate roadmap waves, add pattern map 2026-06-13 14:11:39 -04:00
Lucas Berger 4d4ffad059 docs(quick-260613-fp9): .gitea/.planning pushes should not trigger a docker image publish
CI / changes (pull_request) Successful in 2s
CI / fast-checks (pull_request) Successful in 1m24s
CI / api (pull_request) Successful in 1m0s
CI / harness (pull_request) Successful in 3m53s
CI / security (pull_request) Successful in 39s
CI / gate (pull_request) Successful in 1s
2026-06-13 11:22:16 -04:00
Lucas Berger 7478c0fa50 docs(15): mark Gitea branch-protection checkpoint resolved (verified on main)
Publish / publish (push) Successful in 9s
2026-06-13 11:14:20 -04:00
Lucas Berger 9be3b7ba37 docs(quick-260613-dmw): exclude .gitea/** from CI heavy-job paths-filter
CI / changes (pull_request) Successful in 2s
CI / fast-checks (pull_request) Successful in 1m23s
CI / api (pull_request) Successful in 1m1s
CI / harness (pull_request) Successful in 3m51s
CI / security (pull_request) Successful in 39s
CI / gate (pull_request) Successful in 2s
2026-06-13 09:53:25 -04:00
Lucas Berger c72e013a7b docs(phase-16): complete phase execution
CI / changes (pull_request) Successful in 3s
CI / fast-checks (pull_request) Failing after 57s
CI / api (pull_request) Successful in 58s
CI / harness (pull_request) Successful in 3m59s
CI / security (pull_request) Successful in 40s
CI / gate (pull_request) Failing after 1s
2026-06-13 09:00:12 -04:00
Lucas Berger 9a108a3618 docs(16-06): complete image hygiene CI assertions plan 2026-06-13 08:28:37 -04:00
Lucas Berger 6e5086ce5e docs(16-05): complete security job + gate wiring plan 2026-06-13 08:25:00 -04:00
Lucas Berger 946dafe5fb docs(16-04): complete gitleaks+dockerignore plan — add SUMMARY, advance state 2026-06-13 08:16:49 -04:00
Lucas Berger ab42794c1c docs(16-03): complete eslint-plugin-security plan — add SUMMARY, advance state to plan 4 2026-06-13 05:26:15 -04:00
Lucas Berger 069fe53523 docs(16-02): complete dependency-audit-gate plan — add SUMMARY, advance state to plan 3 2026-06-13 05:20:43 -04:00
Lucas Berger b67d757f87 docs(16-01): complete boot-guard plan — add SUMMARY, advance state to plan 2 2026-06-13 05:15:35 -04:00
Lucas Berger 0d6366cd56 docs(16): create phase plan 2026-06-12 23:25:48 -04:00
Lucas Berger 7d30e0bfab docs(state): record phase 16 context session 2026-06-12 22:50:57 -04:00
Lucas Berger 2d50c7b515 docs(roadmap): add Phase 16 (CI dep audit, security & image hygiene); fold in + remove backlog 999.17
Publish / publish (push) Successful in 6s
2026-06-12 22:08:29 -04:00
Lucas Berger 17c1f63d4c docs(state): record phase 10 context session 2026-06-12 21:37:32 -04:00
Lucas Berger 03f02a1207 docs(phase-09): complete phase execution 2026-06-12 17:08:54 -04:00
Lucas Berger 9164619ccd docs(09-01): complete outbox drain trigger wiring plan 2026-06-12 16:54:20 -04:00
Lucas Berger 5fdbd11475 docs(09): create phase plan 2026-06-12 14:28:09 -04:00
Lucas Berger b104d73cb5 docs(state): record phase 9 context session 2026-06-12 14:02:28 -04:00
Lucas Berger 2b4eb5d6ba docs(phase-15): complete phase execution
Publish / publish (push) Successful in 6s
2026-06-12 11:20:09 -04:00
Lucas Berger a6e2474379 docs(phase-15): record deferred 15-03 operator checkpoint
CI / changes (pull_request) Successful in 6s
CI / fast-checks (pull_request) Successful in 1m23s
CI / api (pull_request) Successful in 59s
CI / harness (pull_request) Successful in 3m55s
CI / gate (pull_request) Successful in 1s
2026-06-12 10:59:48 -04:00
Lucas Berger 4728c41539 docs(phase-15): mark phase execution started 2026-06-12 10:40:07 -04:00
Lucas Berger c687efce27 docs(15): record planning complete + roadmap wave annotations 2026-06-12 10:30:50 -04:00
Lucas Berger cf48fa8e1b docs(phase-14): complete phase execution
CI / fast-checks (pull_request) Successful in 1m20s
CI / api (pull_request) Successful in 57s
CI / harness (pull_request) Successful in 3m56s
2026-06-12 09:10:18 -04:00
Lucas Berger 214e59d6e2 docs(phase-14): update tracking after wave 1 2026-06-12 08:27:39 -04:00
Lucas Berger 5c3bd5c1ea docs(14): record planning complete + pattern map 2026-06-12 08:10:03 -04:00
Lucas Berger d8cdbcfc14 docs(state): record phase 14 context session 2026-06-12 07:57:10 -04:00
Lucas Berger f16316c6fd docs(quick-260611-tfc): WR-01 sw.ts notificationclick fallback fix 2026-06-11 21:16:38 -04:00
Lucas Berger 90d94febea docs(13): mark phase complete — tracking updates 2026-06-11 21:00:55 -04:00
Lucas Berger f153b7199d docs(13-03): complete Prettier reformat + CI format gate plan 2026-06-11 20:44:52 -04:00
Lucas Berger 982438dc10 style(13-03): apply Prettier formatting across repo
Mechanical reformat — no logic changes. 398 files changed, 19125
insertions(+), 16457 deletions(-). Prettier 3.8.4 with .prettierrc
(singleQuote:true, semi:true, tabWidth:2, trailingComma:all,
printWidth:100). Isolated per D-13-08 for reviewability.
2026-06-11 20:35:18 -04:00
Lucas Berger 1453cbed76 docs(13-02): complete ESLint violation elimination plan 2026-06-11 20:25:47 -04:00
Lucas Berger 39e26561cf docs(13-01): complete lint gate foundation plan — SUMMARY + STATE + ROADMAP
Plan 13-01 complete: ESLint flat config + Prettier installed and wired,
SC-1 gate proven (exit 1 on deliberate violations), 119 real violations
inventoried for Plan 02 (api:42, pwa:77). STATE advanced to Plan 2 of 3.
2026-06-11 19:53:55 -04:00
Lucas Berger 66c54507ad docs(13): create phase plan 2026-06-11 19:27:50 -04:00