Commit Graph
97 Commits
Author SHA1 Message Date
Lucas Berger 2b4eb5d6ba docs(phase-15): complete phase execution
Publish / publish (push) Successful in 6s
2026-06-12 11:20:09 -04:00
Lucas Berger 62252ce434 docs(15-03): complete plan 03 — branch protection finalized (fast-checks + gate), publish.yml comment 2026-06-12 11:20:09 -04:00
Lucas Berger 0278e2080a docs(phase-15): update tracking after wave 2 2026-06-12 10:54:26 -04:00
Lucas Berger 20ebd90554 docs(phase-15): update tracking after wave 1 2026-06-12 10:49:12 -04:00
Lucas Berger c687efce27 docs(15): record planning complete + roadmap wave annotations 2026-06-12 10:30:50 -04:00
Lucas Berger e19d4736c7 docs(15): create phase plan — doc-only CI skip + markdown lint
3 plans across 3 waves:
- 15-01: markdownlint-cli2 config/script/step + fix 13 baseline violations (SC-4)
- 15-02: ci.yml changes job + conditional api/harness + always-running gate (SC-1/2, SC-3 YAML)
- 15-03: operator branch-protection checkpoint + publish.yml comment (SC-3)
2026-06-12 10:28:56 -04:00
Lucas Berger 23fb238443 docs(roadmap): add markdown linting to Phase 15 scope
Publish / publish (push) Successful in 6s
2026-06-12 09:52:34 -04:00
Lucas Berger 300a07ab4b docs: review backlog — promoted 999.17 to Phase 15, removed 6 stale promoted stubs
Publish / publish (push) Successful in 7s
2026-06-12 09:47:12 -04:00
Lucas Berger cf48fa8e1b docs(phase-14): complete phase execution
CI / fast-checks (pull_request) Successful in 1m20s
CI / api (pull_request) Successful in 57s
CI / harness (pull_request) Successful in 3m56s
2026-06-12 09:10:18 -04:00
Lucas Berger 214e59d6e2 docs(phase-14): update tracking after wave 1 2026-06-12 08:27:39 -04:00
Lucas Berger 5c3bd5c1ea docs(14): record planning complete + pattern map 2026-06-12 08:10:03 -04:00
Lucas Berger 8742dd43a4 docs(14): create phase plan 2026-06-12 08:07:37 -04:00
Lucas Berger 5ab463ccbb docs: add backlog 999.17 (CI doc-only PR skip) + remove stale graph.html
CI / fast-checks (pull_request) Successful in 1m19s
CI / api (pull_request) Successful in 58s
CI / harness (pull_request) Successful in 3m16s
2026-06-11 22:29:26 -04:00
Lucas Berger fc5b06d343 Merge remote-tracking branch 'origin/main' into gsd/phase-13-real-lint-gate-eslint
CI / fast-checks (pull_request) Failing after 1m47s
CI / api (pull_request) Successful in 1m0s
CI / harness (pull_request) Successful in 3m30s
# Conflicts:
#	.planning/ROADMAP.md
2026-06-11 21:25:14 -04:00
Lucas Berger 90d94febea docs(13): mark phase complete — tracking updates 2026-06-11 21:00:55 -04:00
Lucas Berger f153b7199d docs(13-03): complete Prettier reformat + CI format gate plan 2026-06-11 20:44:52 -04:00
Lucas Berger 982438dc10 style(13-03): apply Prettier formatting across repo
Mechanical reformat — no logic changes. 398 files changed, 19125
insertions(+), 16457 deletions(-). Prettier 3.8.4 with .prettierrc
(singleQuote:true, semi:true, tabWidth:2, trailingComma:all,
printWidth:100). Isolated per D-13-08 for reviewability.
2026-06-11 20:35:18 -04:00
Lucas Berger 1453cbed76 docs(13-02): complete ESLint violation elimination plan 2026-06-11 20:25:47 -04:00
Lucas Berger 39e26561cf docs(13-01): complete lint gate foundation plan — SUMMARY + STATE + ROADMAP
Plan 13-01 complete: ESLint flat config + Prettier installed and wired,
SC-1 gate proven (exit 1 on deliberate violations), 119 real violations
inventoried for Plan 02 (api:42, pwa:77). STATE advanced to Plan 2 of 3.
2026-06-11 19:53:55 -04:00
Lucas Berger 66c54507ad docs(13): create phase plan 2026-06-11 19:27:50 -04:00
Lucas Berger 694253ecb0 docs(13): create phase plan — 3 plans (lint gate + Prettier format gate)
- 13-01: install ESLint v9/typescript-eslint/React/Prettier (pinned), flat config,
  package lint + root format scripts, root type:module; prove gate fails (SC-1)
- 13-02: fix all first-run violations across both apps, address-not-mask (D-13-05/06)
- 13-03: isolated Prettier reformat (D-13-08) + CI format:check step + green baseline (SC-2/SC-3)
- ROADMAP: add active Phase 13 entry + Progress row; mark backlog 999.16 promoted
2026-06-11 19:25:08 -04:00
Lucas Berger bcc9682a01 docs(roadmap): promote Phases 13 (real lint gate) + 14 (desktop e2e) into v1.1; fold backlog 999.5 self-service onboarding into admin-credential phase
CI / fast-checks (pull_request) Successful in 50s
CI / api (pull_request) Successful in 1m1s
CI / harness (pull_request) Successful in 3m33s
2026-06-11 19:13:31 -04:00
Lucas Berger b1851f475e docs(08): SUMMARY + VERIFICATION — phase 8 complete, CI-01 + CI-02 delivered
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 56s
CI / harness (pull_request) Successful in 3m23s
CI / publish (pull_request) Has been skipped
- 08-04-SUMMARY.md: publish job verified green (run #14), both tags pushed,
  security audit pass (PAT masked, --password-stdin), REGISTRY_PAT naming note
- 08-VERIFICATION.md: all six phase-8 ROADMAP criteria passed with evidence table
- REQUIREMENTS.md: CI-01 + CI-02 marked complete (checkboxes + traceability table)
- ROADMAP.md: phase 8 marked [x] complete (2026-06-11), 08-04 plan ticked
- STATE.md: phase complete, D-PAT-NAMING decision recorded, operator next steps updated
2026-06-11 16:17:53 -04:00
Lucas Berger 212d8c1691 docs(08-03): SUMMARY — harness green, 58 specs both profiles on cold CI stack
- Run #11 (PR #3): 58 passed in 1.6 min (iphone/WebKit + pixel/Chromium)
- 4 infrastructure fixes: API-reap at step boundary, IPv4-first for Vite, dev-user FK seed, reporter double-forward via pnpm
- No Phase 7 harness file modified (phase boundary D-01/D-02 held)
- Advance position to 08-04 (publish job)
2026-06-11 15:52:15 -04:00
Lucas Berger 2a34a94cc6 docs(08): correct premature completion — phase 8 + CI-01 still in progress
CI / fast-checks (pull_request) Successful in 48s
CI / api (pull_request) Successful in 57s
Plans 08-03 (harness UI-regression job) and 08-04 (publish job) are not yet
built; CI-01's definition includes the harness step (08-03). Revert phase 8
and CI-01 from complete back to in-progress.
2026-06-11 14:42:33 -04:00
Lucas Berger 78229168b9 docs(08-02): SUMMARY — PR gating jobs green on cold run 2026-06-11 14:37:32 -04:00
Lucas Berger 181d161da6 docs: add backlog 999.16 — wire real ESLint lint gate (deferred from phase 8) 2026-06-11 14:33:22 -04:00
Lucas Berger 087d9af117 docs(08-01): SUMMARY — probe fork answers recorded, plan complete
- Docker-executor mode confirmed; runs-on: ubuntu-latest (not self-hosted)
- MariaDB service container works; DB_HOST=mariadb; no mysql CLI in image
- actions/cache@v4 unreliable (timeout) — skip in Plans 02/03
- Playwright WebKit deps install cleanly; Phase-7 harness CI-feasible
- ChristopherHX/gitea-upload-artifact@v4 confirmed; actions/upload-artifact@v4 broken
- ${GITHUB_SHA:0:7} valid for image tags
- STATE.md: plan 08-01 complete, position advanced to 08-02 (Wave 2)
- ROADMAP.md: 08 phase progress updated (1/4 plans complete)
2026-06-11 10:16:26 -04:00
Lucas Berger 4a510f1d79 docs: add backlog item 999.15 — desktop e2e coverage; drop from phase 8 context 2026-06-11 09:36:53 -04:00
Lucas Berger 41b0b60291 docs(08): create phase plan 2026-06-11 09:34:48 -04:00
Lucas Berger 4e474cdd9c docs(08): create phase plan — 4 plans (runner-probe, PR jobs, harness, publish) 2026-06-11 09:26:48 -04:00
Lucas Berger 407bf1e91c docs(phase-07): complete phase execution 2026-06-11 02:29:36 -04:00
Lucas Berger 10e570b21d docs(07-04): complete state coverage plan — calendar.spec.ts + lists.spec.ts 2026-06-11 02:13:34 -04:00
Lucas Berger f8227855dc docs(07-03): complete layout.spec.ts plan 2026-06-11 02:02:54 -04:00
Lucas Berger 8f0846c8c6 docs(07-02): complete globalSetup seed plan 2026-06-11 01:53:07 -04:00
Lucas Berger e7fdf798dd docs(07-01): complete playwright harness foundation plan 2026-06-11 01:45:45 -04:00
Lucas Berger 32deab91fd docs(07): create phase plan 2026-06-10 22:43:26 -04:00
Lucas Berger ed206c3732 docs(07): create mobile-test-harness phase plan (4 plans, 3 waves) 2026-06-10 22:39:08 -04:00
Lucas Berger ab02cdb1ba docs: create milestone v1.1 roadmap (6 phases) 2026-06-10 21:34:42 -04:00
Lucas Berger 1f361a9473 chore: archive v1.0 milestone files 2026-06-10 17:47:15 -04:00
Lucas Berger fa90b7cf86 docs(phase-06): finalize 06-04/05/06 summaries + tracking
- 06-04-SUMMARY: pulse keyframe checkpoint PASS (playwright-cli); CP-04.3 iOS device-only noted
- 06-05-SUMMARY: TDD RED/GREEN + dead-end guard follow-up fix; playwright-cli cold-load + 401 PASS
- 06-06-SUMMARY: end-tracking/recurrence-bound/series-prompt/all-day-pill; Schedule-X selector fix noted
- ROADMAP: mark 06-04/05/06 complete; phase 6 row updated to 6/6 Complete 2026-06-10
- STATE: phase 06 position/status updated; 3 new metric rows; 6 new decisions; phase-level UX fixes (AppNav/BottomTabBar) documented; residual device-only items added to Blockers
2026-06-10 16:30:01 -04:00
Lucas Berger 893e687614 docs: expand backlog 999.4 — per-event reminder config + scheduler honors VALARM
Folded the new capture into 999.4 instead of a fragmented duplicate:
- Half A (existing): author per-event VALARM in the event form, incl. 'no reminder'.
- Half B (new, 2026-06-10): reminderScheduler honors each event's VALARM TRIGGER
  instead of the hardcoded 15-min lead, and fires nothing when there's no alarm —
  preserving the catch-up + per-uid exactly-once dedup guarantees.
2026-06-10 15:18:37 -04:00
Lucas Berger dc50919de7 docs: add backlog 999.13 — reduce event write-back latency (outbox 15s drain → event-driven) 2026-06-10 15:08:35 -04:00
Lucas Berger 2b78c3d593 docs: add backlog 999.12 — assistant-driven mobile-browser UI testing (mobile viewport + authed PWA) 2026-06-10 15:07:45 -04:00
Lucas Berger 83f7cbc34d docs: mark Phase 5 (web-push) complete — UAT 1/2/5 pass, T3 dropped, T4 deferred to Phase 6 2026-06-10 14:58:28 -04:00
Lucas Berger 0c2c26c375 docs(06-03): complete hasRrule server-side exposure plan 2026-06-10 11:20:17 -04:00
Lucas Berger b869fe0a93 docs(06-02): complete RRULE UNTIL/COUNT serialization plan 2026-06-10 11:04:04 -04:00
Lucas Berger 78a8cb5ccd docs(06-01): complete end-tracking math plan (D-04) 2026-06-10 10:51:16 -04:00
Lucas Berger 7de1f2482e docs: add backlog 999.10 (admin Settings section) + 999.11 (initial setup wizard)
999.10: in-app admin UI to manage app passwords + designate the shared
calendar (replaces manual is_shared DB write, D-16).
999.11: first-run setup wizard for env vars/VAPID/DB/app-password with
validation (motivated by the truncated-VAPID-key setup friction).
2026-06-10 10:38:36 -04:00
Lucas BergerandClaude Opus 4.8 456121969f docs(06): create ux-polish phase plan (6 plans, 2 waves)
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-10 10:25:41 -04:00