Lucas Berger
|
29b8c02715
|
docs(03): Gate 2 progress — A3 distinct colors + iOS install verified; backlog 999.5 (provider setup)
A3 PASS (distinct colors after collision fix), B1 PASS (wife installed + logged
in on iPhone). Added backlog 999.5: first-login provider-setup prompt to attach
each member's own Fastmail app password (per-member personal calendar, D-09).
Remaining Gate 2: A2, B2/B3/B4, D2, D3 (quick operator confirms); B5/C deferred.
|
2026-06-07 18:15:51 -04:00 |
|
Lucas Berger
|
cdb097c5b3
|
docs(03): record Gate 2 live-verification results (2026-06-07)
A1 (OIDC login → app), D1/D4/D5 (create/edit/delete round-trips), D6 (412
conflict), and /health-over-tunnel verified live this session via operator
browser testing + outbox evidence. Remaining: A2/A3 + D2/D3 (desktop, quick),
B (iOS device, load-bearing), C (SSE — Phase 4 entry gate per D-14).
|
2026-06-07 18:02:53 -04:00 |
|
Lucas Berger
|
1f8775e7b6
|
docs(03-08): scaffold Gate 2 results + record production build status
- PWA build: CLEAN — 1818 modules, sw.js + workbox generated (build SHA 40dfbb4)
- API build: CLEAN — tsc passed, no errors
- 03-GATE2-RESULTS.md created with deploy header (URL TBD), full Gate 2 checklist
(all rows marked PENDING — operator/device), and operator-setup section covering:
Authelia OIDC client registration, OIDC_AUTH_EXTERNAL_URL, Pangolin/Newt Mode A rig,
DB schema push, and /health tunnel verification
|
2026-06-05 18:51:37 -04:00 |
|