Commit Graph
159 Commits
Author SHA1 Message Date
Lucas Berger 280438b2d3 docs(17): create phase plan (6 plans, 2 waves) — UI optimization & polish 2026-06-18 11:34:04 -04:00
Lucas Berger 3784762817 docs(17): capture phase context (layout polish + branding + theme groundwork; dark mode/styling deferred) 2026-06-17 20:37:02 -04:00
Lucas Berger 916fb34f17 docs: add backlog items 999.20 (dark mode/theming) + 999.21 (styling refresh) 2026-06-17 20:34:02 -04:00
Lucas Berger 37fd896ce9 docs(phase-19): mark phase complete (verification passed, 5/5 plans) 2026-06-17 20:00:21 -04:00
Lucas Berger 9b10d875d4 docs(phase-19): update tracking after wave 4 2026-06-17 17:44:10 -04:00
Lucas Berger 1cf572a2b9 docs(phase-19): update tracking after wave 3 2026-06-17 17:06:30 -04:00
Lucas Berger eb090bb57e docs(phase-19): update tracking after wave 2 2026-06-17 16:42:17 -04:00
Lucas Berger 13e3757e88 docs(phase-19): update tracking after wave 1 2026-06-17 16:26:23 -04:00
Lucas Berger dc40ba9fb8 docs(19): create local-auth phase plan (5 plans, 4 waves) 2026-06-17 15:35:43 -04:00
Lucas BergerandClaude Opus 4.8 932fcb6e3f chore(12): mark Phase 12 complete — UAT re-verified, all 6 gaps closed
- ROADMAP/STATE advanced to Phase 13 (real-lint-gate-eslint)
- Archived diagnosed UAT marked superseded (historical only)

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 16:17:18 -04:00
Lucas Berger 67c17a58eb docs(12-06): complete setup-route gap-closure plan (VAPID equality + DB name) 2026-06-15 21:15:18 -04:00
Lucas Berger f0fb31348d docs(12): gap-closure plans 05-07 for 6 UAT gaps 2026-06-15 21:05:45 -04:00
Lucas BergerandClaude Opus 4.8 a07bb5bc67 fix(12): keep phase checkbox open — verification is human_needed, completion via verify-work
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-15 15:22:46 -04:00
Lucas Berger 49b82d2ef4 docs(12-04): update SUMMARY + STATE + ROADMAP for CR-01 VAPID gap closure 2026-06-15 15:16:41 -04:00
Lucas BergerandClaude Opus 4.8 523742c489 fix(12): revert premature phase-complete checkbox — verification pending
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-15 15:03:25 -04:00
Lucas Berger 1d8eed309b docs(12-04): complete setup-wizard PWA plan — paused at human-verify checkpoint 2026-06-15 14:36:20 -04:00
Lucas Berger a36f9ddb78 docs(12-03): complete first-login-claims plan summary 2026-06-15 14:16:59 -04:00
Lucas Berger 9d0aa6296a docs(12-02): complete setup-routes plan — guard + router + OIDC fallback 2026-06-15 14:06:29 -04:00
Lucas Berger c6d0db0119 docs(12-01): complete Phase 12 Plan 01 plan 2026-06-15 13:47:04 -04:00
Lucas Berger f5bb71cd99 Merge remote-tracking branch 'origin/main' into gsd/phase-12-initial-setup-wizard
# Conflicts:
#	.planning/ROADMAP.md
#	.planning/STATE.md
2026-06-15 13:30:32 -04:00
Lucas Berger 2bf5a42ac2 docs(roadmap): add Phase 19 Local Auth (No-OIDC Mode) 2026-06-15 13:11:34 -04:00
Lucas BergerandClaude Opus 4.8 513fc887e4 docs(12): finalize plan — validation map, research resolution, roadmap waves
Resolve plan-checker warning (mark RESEARCH Open Questions RESOLVED),
fill VALIDATION.md Nyquist map (nyquist_compliant), record planning
complete in STATE, annotate ROADMAP wave dependencies.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-15 11:49:53 -04:00
Lucas Berger fe40de83db docs(12): create initial-setup-wizard phase plan (4 plans, 3 waves) 2026-06-15 11:46:30 -04:00
Lucas BergerandClaude Opus 4.8 ea93089b74 docs(18): verification passed + mark phase complete
Phase-goal verification: 7/7 decision-contract truths confirmed (D-01..D-07).
Browser round-trip re-confirmed via Playwright e2e against the live stack.
Mark phase 18 complete in STATE.md and ROADMAP.md.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-14 23:08:56 -04:00
Lucas Berger 9481544a58 docs(18-04): complete admin timezone UI plan 2026-06-14 22:46:21 -04:00
Lucas Berger 9798d795a7 docs(18-03): complete broker rewire plan 2026-06-14 22:33:39 -04:00
Lucas Berger 08c39165bf docs(18-02): complete admin timezone endpoints plan 2026-06-14 22:13:53 -04:00
Lucas Berger ac60161726 docs(18-01): complete household timezone accessor + IANA validator plan 2026-06-14 22:08:37 -04:00
Lucas Berger 68a315e164 docs(18): create phase plan (4 plans, 3 waves) 2026-06-14 21:51:13 -04:00
Lucas BergerandClaude Opus 4.8 ff06a8479b docs(phase-11): complete phase execution (5/5 plans, CAL-13/14 + NOTIF-04/05/06)
One deferred human check: live Fastmail VALARM round-trip + push (untestable in dev, backlog 999.19).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-14 08:31:31 -04:00
Lucas BergerandClaude Opus 4.8 c86020ac21 docs(phase-11): mark gap-closure plan 11-05 complete; post-merge gate green (typecheck, API 347, PWA 206)
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-14 08:30:51 -04:00
Lucas BergerandClaude Opus 4.8 213f2547cf docs: backlog 999.19 — dev user full app functionality without real-calendar sync
Captured during Phase 11 UAT: dev-bypass user has no calendar provider, blocking hands-on event/reminder testing.

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-14 06:59:35 -04:00
Lucas Berger 8cd4c0e2c2 docs(11-04): complete reminder picker plan — SUMMARY, STATE, ROADMAP, REQUIREMENTS
- 11-04-SUMMARY.md: allDay-aware select, edit pre-population, Custom-kept limitation, playwright smoke results
- STATE.md: advance plan counter, add key decisions, record session
- ROADMAP.md: phase 11 now Complete (4/4 summaries)
- REQUIREMENTS.md: CAL-13 + CAL-14 marked complete
2026-06-14 06:58:18 -04:00
Lucas BergerandClaude Opus 4.8 ca76b6118e docs(phase-11): update tracking after wave 2
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 22:29:09 -04:00
Lucas BergerandClaude Opus 4.8 f3b74cc87e docs(phase-11): update tracking after wave 1
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 22:10:22 -04:00
Lucas BergerandClaude Opus 4.8 7d070a6b69 docs: add Phase 18 (timezone) to roadmap; refresh knowledge graph
Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-13 21:54:54 -04:00
Lucas Berger e169b138f9 docs(11): sequence plan 11-02 behind 11-01, cite D-09; record planning completion 2026-06-13 21:26:16 -04:00
Lucas Berger cfeb8d8660 docs(11): create per-event-reminders phase plan (4 plans, 3 waves) 2026-06-13 21:20:09 -04:00
luckberg f2e228360a Merge branch 'main' into gsd/phase-10-admin-role-settings
CI / changes (pull_request) Successful in 2s
CI / fast-checks (pull_request) Successful in 1m26s
CI / api (pull_request) Successful in 1m3s
CI / harness (pull_request) Successful in 4m11s
CI / security (pull_request) Successful in 39s
CI / gate (pull_request) Successful in 1s
2026-06-13 16:50:06 -04:00
Lucas Berger 6dff7aa012 docs(roadmap): add Phase 17 (UI Optimization & Polish) + document phone bottom-bar overlap
Long-standing PWA phone-layout defect (BottomTabBar from Phase 04, not a
Phase 10 regression): the fixed bottom bar overlaps the New Event FAB and
the calendar colour legend at <=767px. Added Phase 17 to the v1.1 roadmap
with the defect as the seed item + fix sketch, and a pending todo
(resolves_phase: 17) with full repro/file detail.
2026-06-13 16:43:00 -04:00
Lucas Berger 94c62e213e docs(phase-10): complete phase execution 2026-06-13 15:46:09 -04:00
Lucas Berger 3693da6d0b docs(10-04): complete PWA admin surfaces plan
- SUMMARY.md for Plan 04 (AdminPage, CredentialSheet, SetupBanner, nav gating)
- STATE.md: plan advanced to last, progress 100%, decisions recorded
- ROADMAP.md: Phase 10 marked Complete (4/4 summaries)
2026-06-13 15:28:03 -04:00
Lucas Berger 0f41993a95 docs(10-03): complete admin-api-surface plan summary and state update 2026-06-13 14:57:30 -04:00
Lucas Berger a5d88f75aa docs(10-02): complete admin-role-primitives plan summary and state update 2026-06-13 14:39:49 -04:00
Lucas Berger 6405a93742 docs(10-01): complete v1.1 DB foundation plan summary and state update 2026-06-13 14:25:39 -04:00
Lucas Berger 159f37fe6a docs(10): record planning completion, annotate roadmap waves, add pattern map 2026-06-13 14:11:39 -04:00
Lucas Berger b24fbbfde7 docs(10): create phase plan (4 plans, 4 waves) for admin-role-settings
- 10-01 v1.1 DB foundation migration + dev-bypass admin seed
- 10-02 requireAdmin guard + first-login-wins + /api/me extension (TDD)
- 10-03 adminRouter credentials/shared-calendar + member self-service (TDD)
- 10-04 PWA /admin route + nav gating + CredentialSheet + SetupBanner
- filled 10-VALIDATION Per-Task Verification Map (Nyquist compliant)
- finalized ROADMAP Phase 10 plan list
2026-06-13 13:57:51 -04:00
Lucas Berger ca6947cfbf docs: add backlog item 999.18 — update dependencies as found during ci 2026-06-13 13:23:32 -04:00
Lucas Berger c72e013a7b docs(phase-16): complete phase execution
CI / changes (pull_request) Successful in 3s
CI / fast-checks (pull_request) Failing after 57s
CI / api (pull_request) Successful in 58s
CI / harness (pull_request) Successful in 3m59s
CI / security (pull_request) Successful in 40s
CI / gate (pull_request) Failing after 1s
2026-06-13 09:00:12 -04:00
Lucas Berger 9a108a3618 docs(16-06): complete image hygiene CI assertions plan 2026-06-13 08:28:37 -04:00