Commit Graph
6 Commits
Author SHA1 Message Date
Lucas Berger 26655cf859 docs(260607-u8o): mark Gate 2 Part C SSE row + summary PASS
- Part C row C1: PENDING -> PASS (2026-06-08) with verbatim evidence
- Summary Part-C row: DEFERRED -> PASS (Phase 4 entry gate D-14 cleared)
2026-06-07 21:49:55 -04:00
Lucas Berger d71b15cd02 docs(03): Gate 2 complete for Phase 03 scope — D3 recurring write verified, recurring-series delete confirmed
Weekly recurring create writes valid RRULE and recurred in Fastmail; repeat-bound
+ per-occurrence-duration UX gaps backlogged (999.7/999.8). Deleting the recurring
series cleared master + all occurrences in one delete. Remaining deferred by
design: B5 (Android), C (SSE smoke — Phase 4 entry gate).
2026-06-07 19:19:57 -04:00
Lucas Berger f656a41d1c docs(03): Gate 2 substantially complete — A/B/D verified; only D3 quick confirm left
A2 (transparent SSO), B2/B3/B4 (iOS standalone + load-bearing standalone login),
D2 (all-day, after off-by-one fix) all PASS. Remaining: D3 weekly recurring
(quick). Deferred: B5 Android, C SSE (Phase 4 entry gate).
2026-06-07 18:40:01 -04:00
Lucas Berger 29b8c02715 docs(03): Gate 2 progress — A3 distinct colors + iOS install verified; backlog 999.5 (provider setup)
A3 PASS (distinct colors after collision fix), B1 PASS (wife installed + logged
in on iPhone). Added backlog 999.5: first-login provider-setup prompt to attach
each member's own Fastmail app password (per-member personal calendar, D-09).
Remaining Gate 2: A2, B2/B3/B4, D2, D3 (quick operator confirms); B5/C deferred.
2026-06-07 18:15:51 -04:00
Lucas Berger cdb097c5b3 docs(03): record Gate 2 live-verification results (2026-06-07)
A1 (OIDC login → app), D1/D4/D5 (create/edit/delete round-trips), D6 (412
conflict), and /health-over-tunnel verified live this session via operator
browser testing + outbox evidence. Remaining: A2/A3 + D2/D3 (desktop, quick),
B (iOS device, load-bearing), C (SSE — Phase 4 entry gate per D-14).
2026-06-07 18:02:53 -04:00
Lucas Berger 1f8775e7b6 docs(03-08): scaffold Gate 2 results + record production build status
- PWA build: CLEAN — 1818 modules, sw.js + workbox generated (build SHA 40dfbb4)
- API build: CLEAN — tsc passed, no errors
- 03-GATE2-RESULTS.md created with deploy header (URL TBD), full Gate 2 checklist
  (all rows marked PENDING — operator/device), and operator-setup section covering:
  Authelia OIDC client registration, OIDC_AUTH_EXTERNAL_URL, Pangolin/Newt Mode A rig,
  DB schema push, and /health tunnel verification
2026-06-05 18:51:37 -04:00