Commit Graph
19 Commits
Author SHA1 Message Date
Lucas BergerandClaude Opus 4.8 ff06a8479b docs(phase-11): complete phase execution (5/5 plans, CAL-13/14 + NOTIF-04/05/06)
One deferred human check: live Fastmail VALARM round-trip + push (untestable in dev, backlog 999.19).

Co-Authored-By: Claude Opus 4.8 <noreply@anthropic.com>
2026-06-14 08:31:31 -04:00
Lucas Berger 8cd4c0e2c2 docs(11-04): complete reminder picker plan — SUMMARY, STATE, ROADMAP, REQUIREMENTS
- 11-04-SUMMARY.md: allDay-aware select, edit pre-population, Custom-kept limitation, playwright smoke results
- STATE.md: advance plan counter, add key decisions, record session
- ROADMAP.md: phase 11 now Complete (4/4 summaries)
- REQUIREMENTS.md: CAL-13 + CAL-14 marked complete
2026-06-14 06:58:18 -04:00
Lucas Berger 6405a93742 docs(10-01): complete v1.1 DB foundation plan summary and state update 2026-06-13 14:25:39 -04:00
Lucas Berger 9164619ccd docs(09-01): complete outbox drain trigger wiring plan 2026-06-12 16:54:20 -04:00
Lucas Berger 982438dc10 style(13-03): apply Prettier formatting across repo
Mechanical reformat — no logic changes. 398 files changed, 19125
insertions(+), 16457 deletions(-). Prettier 3.8.4 with .prettierrc
(singleQuote:true, semi:true, tabWidth:2, trailingComma:all,
printWidth:100). Isolated per D-13-08 for reviewability.
2026-06-11 20:35:18 -04:00
Lucas Berger b1851f475e docs(08): SUMMARY + VERIFICATION — phase 8 complete, CI-01 + CI-02 delivered
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 56s
CI / harness (pull_request) Successful in 3m23s
CI / publish (pull_request) Has been skipped
- 08-04-SUMMARY.md: publish job verified green (run #14), both tags pushed,
  security audit pass (PAT masked, --password-stdin), REGISTRY_PAT naming note
- 08-VERIFICATION.md: all six phase-8 ROADMAP criteria passed with evidence table
- REQUIREMENTS.md: CI-01 + CI-02 marked complete (checkboxes + traceability table)
- ROADMAP.md: phase 8 marked [x] complete (2026-06-11), 08-04 plan ticked
- STATE.md: phase complete, D-PAT-NAMING decision recorded, operator next steps updated
2026-06-11 16:17:53 -04:00
Lucas Berger 2a34a94cc6 docs(08): correct premature completion — phase 8 + CI-01 still in progress
CI / fast-checks (pull_request) Successful in 48s
CI / api (pull_request) Successful in 57s
Plans 08-03 (harness UI-regression job) and 08-04 (publish job) are not yet
built; CI-01's definition includes the harness step (08-03). Revert phase 8
and CI-01 from complete back to in-progress.
2026-06-11 14:42:33 -04:00
Lucas Berger 78229168b9 docs(08-02): SUMMARY — PR gating jobs green on cold run 2026-06-11 14:37:32 -04:00
Lucas Berger e7fdf798dd docs(07-01): complete playwright harness foundation plan 2026-06-11 01:45:45 -04:00
Lucas Berger ab02cdb1ba docs: create milestone v1.1 roadmap (6 phases) 2026-06-10 21:34:42 -04:00
Lucas Berger 9bd0f536fd docs: define milestone v1.1 requirements 2026-06-10 21:34:42 -04:00
Lucas Berger 53b916601f chore: remove REQUIREMENTS.md for v1.0 milestone 2026-06-10 17:47:21 -04:00
Lucas Berger 497daf6add docs: add deferred REQ-IDs to REQUIREMENTS traceability table
CAL-09..CAL-12 (v1.x) and DISP-01/DISP-02 (v2) were in the body but
absent from the Traceability table. v1 coverage stays 20/20; deferred
IDs listed separately. Resolves the REQUIREMENTS traceability todo.
2026-06-10 09:26:45 -04:00
Lucas Berger 4e0b06d3fd docs(05-01): mark NOTIF requirements complete in traceability 2026-06-09 20:52:35 -04:00
Lucas Berger 0fd4d66ee7 docs(04-01): complete lists foundation plan 2026-06-09 12:06:53 -04:00
Lucas Berger a487569c7e docs(03-01): complete foundation-scaffold plan 2026-06-05 17:41:41 -04:00
Lucas Berger edf9649a21 docs(phase-02): complete phase — mark roadmap + requirements traceability 2026-06-05 16:01:15 -04:00
Lucas Berger ac82d32a36 docs: create roadmap (5 phases) 2026-06-03 16:15:27 -04:00
Lucas Berger a20afd472a docs: define v1 requirements 2026-06-03 16:05:16 -04:00