Lucas Berger 5eb26c0e6b test(03-11): RED — fresh etag re-read before PUT to avoid spurious 412 (WR-02)
- WR-02 fresh: update PUT must use calendarEvents.etag not stale enqueue-time etag
  (fails RED: capturedEtag === 'old-etag', not 'new-etag')
- WR-02 fallback: when calendarEvents has no row, fall back to row.etag (passes in RED)
- Add mockWhereCalEvents to mock infrastructure to isolate calendarEvents selects
- Switch all beforeEach to vi.resetAllMocks() to prevent mockImplementationOnce bleed
2026-06-05 21:05:40 -04:00
Lucas Berger b409c09e25 feat(03-11): GREEN — durable create-before-delete gating + drain concurrency guard (CR-04, CR-05)
- CR-04: delete rows with groupId query DB for sibling create status before dispatch
  - sibling 'pending': defer delete to later cycle (leave row pending)
  - sibling 'failed'/'dead': mark delete failed permanently (original event preserved, D-04)
  - sibling 'done': dispatch delete normally
- CR-05: module-level isDraining guard; overlapping 15s cycles are no-ops
  - SINGLE-PROCESS ONLY — documented limitation for multi-replica deployments
- Fix mockFromFn to use Symbol.for('drizzle:Name') instead of JSON.stringify (circular)
- Update D-04 ordering test to queue sibling-status mock response
2026-06-05 21:01:57 -04:00
Lucas Berger 6b2cdf3683 test(03-11): RED — durable create-before-delete gating + concurrency guard (CR-04, CR-05)
- CR-04 cross-batch drain 1: sibling create 'pending' must block delete dispatch
- CR-04 cross-batch drain 2: sibling create 'done' must allow delete dispatch
- CR-04 paired-create-failed: sibling create 'failed'/'dead' marks delete failed, preserves original
- CR-05: two overlapping drain calls must invoke createCalendarEvent exactly once
2026-06-05 20:56:07 -04:00
Lucas Berger c178dcee0c test(03-10): add RED tests for CR-03 fail-closed creds + WR-01 backoff index
- Add mockDecryptPassword to vi.hoisted() so tests can control loadClientForUser behavior
- Add vi.mock for broker/crypto.js to enable CR-03 scenario
- Introduce wireMockChain() helper that differentiates credential vs outbox db selects
- CR-03 RED: credential-load failure must leave row pending, not call createFastmailClient('')
- WR-01 RED: first transient retry must use BACKOFF_SECONDS[0]=15s not BACKOFF_SECONDS[1]=60s
- Update FAKE_CRED_ROW so loadClientForUser can return a real credential-shaped row
2026-06-05 20:50:11 -04:00
Lucas Berger 813a7ba697 test(03-10): add RED tests for ICS builder wiring + WR-04 + CR-02
- vevent.test.ts: D-13 form-parsed contract block — timed and all-day cases
  (all-day DTEND+1 fails: emits 20260610 not 20260611)
- outboxWorker.test.ts: worker integration — create/update must pass BEGIN:VCALENDAR
  to CalDAV write functions (fails: raw JSON passes through today)
- worker: unparseable payload must mark row failed (fails: marks done today)
- Update makeRow default payload to form JSON shape the worker should parse
2026-06-05 20:46:50 -04:00
Lucas Berger cd4a8931e5 feat(03-04): implement outbox drain state machine (GREEN)
- runOutboxDrain: drains pending outbox rows, dispatches CalDAV writes
  via broker/write.ts, classifies HTTP responses per D-07/D-08
- CONFLICT_STATUS=412 routes to conflict flow: mark failed, re-sync (D-08)
- TRANSIENT_STATUSES: exponential backoff with MAX_ATTEMPTS=5 dead-letter (D-07)
- HARD_FAIL_STATUSES 400/401/403: fail immediately, no retry (D-07)
- Edit-as-move D-04: create row sorted before delete for same groupId;
  create-fail aborts the paired delete (T-03-14)
- triggerTargetedResync: fetches fresh DAVCalendars, calls syncCalendar (D-06)
- startOutboxWorker: node-cron */15 * * * * * schedule (15s interval)
- Fix test scaffold: vi.hoisted() for mock variables to resolve vitest
  hoisting TDZ issue; simplified mock chain to match and() single .where()
2026-06-05 18:20:18 -04:00
Lucas Berger bbfccda756 test(03-01): add Wave 0 RED test scaffold for all Phase 3 behaviors
- vevent.test.ts: DTSTART UTC 'Z' for timed, DATE for all-day (D-13), RRULE (CAL-04/07)
- write.test.ts: createCalendarEvent uid.ics filename, updateCalendarEvent/deleteCalendarEvent
  etag/If-Match shapes (CAL-04/05/06, D-08)
- outboxWorker.test.ts: pending→done on 204, pending→failed on 412 (no retry), pending→backoff
  on 500, pending→dead at MAX_ATTEMPTS, edit-as-move create-before-delete ordering (D-04/D-07/D-08)
- events.test.ts (extended): POST /create 202+outbox row, PATCH /edit 202+etag, DELETE /:uid 202,
  GET /sync-status, GET /writable-calendars D-03 access control, 403 unauthorized calendar (V4)
- InstallPrompt.test.tsx: isIOSSafariNonStandalone UA detection, useAndroidInstallPrompt
  canInstall lifecycle (PWA-01/PWA-02)
All tests fail RED — implementation modules do not exist yet