docs(08): SUMMARY + VERIFICATION — phase 8 complete, CI-01 + CI-02 delivered
CI / fast-checks (pull_request) Successful in 49s
CI / api (pull_request) Successful in 56s
CI / harness (pull_request) Successful in 3m23s
CI / publish (pull_request) Has been skipped

- 08-04-SUMMARY.md: publish job verified green (run #14), both tags pushed,
  security audit pass (PAT masked, --password-stdin), REGISTRY_PAT naming note
- 08-VERIFICATION.md: all six phase-8 ROADMAP criteria passed with evidence table
- REQUIREMENTS.md: CI-01 + CI-02 marked complete (checkboxes + traceability table)
- ROADMAP.md: phase 8 marked [x] complete (2026-06-11), 08-04 plan ticked
- STATE.md: phase complete, D-PAT-NAMING decision recorded, operator next steps updated
This commit is contained in:
Lucas Berger
2026-06-11 16:17:53 -04:00
parent 73eecf7559
commit b1851f475e
5 changed files with 185 additions and 23 deletions
+17 -16
View File
@@ -2,16 +2,16 @@
gsd_state_version: 1.0
milestone: v1.1
milestone_name: Operability & Polish
status: executing
stopped_at: 08-03 complete — advancing to 08-04 (Wave 4, publish job)
last_updated: "2026-06-11T20:00:00.000Z"
last_activity: "2026-06-11 -- 08-03 complete; harness job green on cold CI run (run #11): 58 specs passed across iphone/WebKit + pixel/Chromium in 1.6 min; 4 infrastructure fixes (API-reap, IPv4-first, dev-user seed, reporter forwarding); no Phase 7 harness file modified; advancing to 08-04"
status: phase-complete
stopped_at: Phase 08 complete — all 4 plans executed, CI-01 + CI-02 delivered, publish job verified green (run #14)
last_updated: "2026-06-11T22:00:00.000Z"
last_activity: "2026-06-11 -- 08-04 complete; publish job green (run #14, merge commit 98acff8): both image tags pushed (familysync-api:latest + :v1.1-98acff8), PAT masked, --password-stdin confirmed. REGISTRY_PAT naming fix (73eecf7). Phase 8 (Gitea CI) complete — all 6 ROADMAP criteria met."
progress:
total_phases: 16
completed_phases: 1
completed_phases: 2
total_plans: 8
completed_plans: 6
percent: 6
completed_plans: 8
percent: 12
---
# Project State
@@ -25,10 +25,10 @@ See: .planning/PROJECT.md (updated 2026-06-10)
## Current Position
Phase: 08 (gitea-ci) — EXECUTING
Plan: 4 of 4 (08-04 next — Wave 4, publish job)
Status: Executing — 08-03 complete, harness green (58 specs, both profiles, cold CI run)
Last activity: 2026-06-11 -- 08-03 complete; harness job green on cold CI run (run #11): 58 specs passed across iphone/WebKit + pixel/Chromium in 1.6 min; 4 infrastructure fixes (API-reap, IPv4-first, dev-user seed, reporter forwarding); no Phase 7 harness file modified; advancing to 08-04
Phase: 08 (gitea-ci) — COMPLETE
Plan: 4 of 4 (08-04 complete)
Status: Phase 08 complete — all 4 plans executed, CI-01 + CI-02 delivered
Last activity: 2026-06-11 -- 08-04 complete; publish job green (run #14): both tags pushed, PAT masked, REGISTRY_PAT naming fix applied. Phase 8 fully complete.
## Performance Metrics
@@ -98,6 +98,7 @@ Recent decisions affecting current work:
- D-PROBE-06 (2026-06-11, 08-01): ChristopherHX/gitea-upload-artifact@v4 works — MUST use this fork; actions/upload-artifact@v4 broken on Gitea.
- D-PROBE-07 (2026-06-11, 08-01): ${GITHUB_SHA:0:7} produces 7 chars — D-04 publish tag expression valid.
- D-PROBE-08 (2026-06-11, 08-01): GITEA_REGISTRY_PAT deferred to Plan 04; PAT not exercised in probe.
- D-PAT-NAMING (2026-06-11, 08-04): Gitea runner silently drops secrets with the `GITEA_` prefix (reserved namespace). Secret renamed from GITEA_REGISTRY_PAT → REGISTRY_PAT in both repo secret and ci.yml (commit 73eecf7). Use REGISTRY_PAT in any future registry operations.
- CAL-08 RESOLVED → GO (Phase 1): per-member Fastmail app password reaches all of that account's calendars; no cross-account ACL needed. Unified view stands; no shared-only fallback. See CAL-08-DECISION.md.
- D-14 (2026-06-04): Phase 1 Gate 2 (live Authelia/Pangolin) deferred. SSE-over-Pangolin smoke = hard gate before Phase 4; live AUTH smoke incl. iOS standalone-PWA folded into Phase 3. Phases 23 build behind a dev-auth bypass. Tracked in 01-HUMAN-UAT.md + docs/deployment.md.
- D-15 (2026-06-04): Validate real topology via local Newt connector + test subdomain through Pangolin (Mode A), not an Unraid deploy; Unraid reserved for go-live.
@@ -199,11 +200,11 @@ Recent decisions affecting current work:
## Session Continuity
Last session: 2026-06-11T20:00:00.000Z
Stopped at: 08-03 complete — advancing to 08-04 (Wave 4, publish job)
Resume file: .planning/phases/08-gitea-ci/08-04-PLAN.md
Last session: 2026-06-11T22:00:00.000Z
Stopped at: Phase 08 complete — CI-01 + CI-02 delivered, publish job verified, SUMMARY + VERIFICATION written
Resume file: None — start Phase 09 with /gsd-plan-phase 9
## Operator Next Steps
- Review the reordered v1.1 roadmap in `.planning/ROADMAP.md` (Phases 712).
- Plan the first phase with `/gsd-plan-phase 7` (Mobile Test Harness — independent, goes first; Phase 8 CI runs its specs). Alternatives that can start in parallel: `/gsd-plan-phase 9` (Faster Write-Back — independent, lowest risk) or `/gsd-plan-phase 10` (Admin Role & Settings — carries the DB migration that Phases 11 & 12 depend on).
- **Phase 8 is complete.** CI pipeline is fully operational on the self-hosted Gitea runner.
- Next: `/gsd-plan-phase 9` (Faster Write-Back — fully independent, lowest risk) or `/gsd-plan-phase 10` (Admin Role & Settings — carries the v1.1 DB migration that Phases 11 & 12 depend on). These can run in parallel once planned.