docs(03): create phase plan (8 plans, 5 waves)
This commit is contained in:
+25
-1
@@ -93,7 +93,31 @@ Plans:
|
||||
5. The installed PWA opens full-screen without browser chrome on both iOS and Android
|
||||
6. **(Carried from Phase 1 Gate 2, D-14)** Live Authelia OIDC login works over the public Pangolin URL — including the **iOS standalone-PWA** flow: the wife can install to Home Screen and complete login without the redirect breaking out of standalone mode; sessions persist (AUTH-01/02) and members get distinct stable colors (AUTH-03). Verify per `docs/deployment.md` Gate 2 checklist; this is the first real external deploy (local Newt test rig is sufficient — Unraid prod is optional until go-live).
|
||||
|
||||
**Plans**: TBD
|
||||
**Plans**: 8 plans
|
||||
Plans:
|
||||
**Wave 1**
|
||||
|
||||
- [ ] 03-01-PLAN.md — Foundation: calendarOutbox table + calendarEvents.objectUrl (pushed), vite-plugin-pwa install + legitimacy gate, sync.ts objectUrl, full Wave 0 RED test scaffold
|
||||
|
||||
**Wave 2** *(blocked on Wave 1)*
|
||||
|
||||
- [ ] 03-02-PLAN.md — TDD: VEVENT builder (vevent.ts, D-13 DATE/DATETIME + RRULE) + tsdav write wrappers (write.ts, D-12 broker boundary)
|
||||
- [ ] 03-03-PLAN.md — Write API: POST/PATCH/DELETE events + GET sync-status, enqueue-only, D-03 ownership, D-04 edit-as-move pair (CAL-04/05/06/07)
|
||||
|
||||
**Wave 3** *(blocked on Wave 2)*
|
||||
|
||||
- [ ] 03-04-PLAN.md — TDD: outbox worker state machine (D-05/06/07/08 retry/backoff/dead/conflict, edit-as-move ordering) + index.ts wiring
|
||||
- [ ] 03-05-PLAN.md — Frontend create/edit slice: write client calls + Zustand keys + EventForm (D-01/02/11) + New Event FAB
|
||||
- [ ] 03-07-PLAN.md — PWA install: VitePWA manifest + auth-safe SW denylist + icons + InstallPrompt (iOS walkthrough + Android prompt) (PWA-01/02)
|
||||
|
||||
**Wave 4** *(blocked on Wave 3)*
|
||||
|
||||
- [ ] 03-06-PLAN.md — Delete + sync feedback: popover Edit/Delete footer + DeleteConfirmationDialog + SyncStateToast polling (D-06/08/09) (CAL-05/06)
|
||||
|
||||
**Wave 5** *(blocked on Wave 4)*
|
||||
|
||||
- [ ] 03-08-PLAN.md — Gate 2 live verification: real Authelia OIDC over Pangolin + iOS standalone login + end-to-end Fastmail write round-trips (success criterion 6, D-14/D-15)
|
||||
|
||||
**UI hint**: yes
|
||||
|
||||