docs: correct rrule drift (code uses ical.js RecurExpansion) + minor fixes
Publish / publish (push) Successful in 11s
Publish / publish (push) Successful in 11s
Recurrence expansion uses ical.js ICAL.RecurExpansion, not the rrule library (never installed/imported). Also fix playwright-cli path (/usr/bin), prod-compose service count (two, post-Redis-removal), and CI job count (six). Found via /gsd-docs-update --verify-only. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Opus 4.8
parent
c7955a46b9
commit
6ade8d59bf
+1
-1
@@ -203,7 +203,7 @@ Every PR to `main` runs through `.gitea/workflows/ci.yml`. A `changes` path-filt
|
||||
| `security` | Every PR | Gitleaks secret scan (PR diff); `pnpm audit` (High+Critical blocking) + outdated report on code-change PRs |
|
||||
| `gate` | Always | Final aggregator — requires `fast-checks` and `security` to succeed; `api` and `harness` may be skipped |
|
||||
|
||||
All five jobs must pass (or be legitimately skipped) before a PR can merge. See [docs/TESTING.md](TESTING.md) for test suite details.
|
||||
All six jobs must pass (or be legitimately skipped) before a PR can merge. See [docs/TESTING.md](TESTING.md) for test suite details.
|
||||
|
||||
### CI dependency caches
|
||||
|
||||
|
||||
Reference in New Issue
Block a user