docs(phase-02): begin execution — consume handoff, advance state

This commit is contained in:
Lucas Berger
2026-06-05 09:24:49 -04:00
parent 81d5c61aa5
commit 62ebb1f9d4
2 changed files with 15 additions and 51 deletions
-36
View File
@@ -1,36 +0,0 @@
{
"version": "1.0",
"timestamp": "2026-06-04T19:28:41.530Z",
"phase": "02",
"phase_name": "calendar-display",
"phase_dir": ".planning/phases/02-calendar-display",
"plan": 1,
"task": 0,
"total_tasks": 5,
"status": "paused",
"stage": "planned-not-executed",
"completed_tasks": [
{"id": "research", "name": "Phase 2 research (RESEARCH.md) + Nyquist VALIDATION.md", "status": "done", "commit": "a707f8d"},
{"id": "patterns", "name": "Pattern map (PATTERNS.md) — 23 files, 19 analogs", "status": "done", "commit": "5e14413"},
{"id": "plans", "name": "5 PLAN.md files in 4 waves; plan-checker PASSED on iteration 2", "status": "done", "commit": "fc4cc2c"},
{"id": "backlog", "name": "Backlog item 999.1 — treat Fastmail as a calendar provider, support adding more", "status": "done", "commit": "8bd52c6"},
{"id": "config", "name": "GSD config: adaptive profile, TDD on, per-milestone branching, auto-advance on; saved as global defaults", "status": "done", "commit": "uncommitted"}
],
"remaining_tasks": [
{"id": "execute", "name": "Execute Phase 2 — run all 5 plans across 4 waves", "status": "not_started"}
],
"blockers": [],
"human_actions_pending": [
{"action": "Wave 2 checkpoint: designate the shared-family calendar via UPDATE calendars SET is_shared=1 WHERE id=<chosen>", "context": "Plan 02-02 Task 3 is autonomous:false — which calendar is 'shared-family' cannot be derived from data; the broker account exposes multiple calendars", "blocking": true},
{"action": "Wave 4 checkpoint: visual + functional verification of the 4 success criteria (color coding, 4 views, DST recurrence, all-day no-shift)", "context": "Plan 02-05 Task 3 is autonomous:false — human-verify of the rendered calendar", "blocking": true}
],
"decisions": [
{"decision": "Server-side recurrence expansion via ICAL.RecurExpansion with VTIMEZONE registered before expansion", "rationale": "rrule alone needs manual EXDATE handling; VTIMEZONE registration is mandatory or DST events show wrong wall-clock time", "phase": "02"},
{"decision": "Schedule-X calendarId routed by occ.isShared ? 'shared' : String(occ.ownerUserId), never String(occ.calendarId)", "rationale": "calendars config is keyed by userId; using DB calendar-row id breaks color routing for members owning multiple calendars", "phase": "02"},
{"decision": "Resolve shared-calendar identity via a calendars.isShared column + operator checkpoint", "rationale": "Cannot derive 'shared' deterministically from Fastmail data; chose explicit marking over fragile displayName matching", "phase": "02"},
{"decision": "Adopted Adaptive model profile, TDD mode on, per-milestone git branching, auto-advance on; saved as global defaults", "rationale": "User preference set via /gsd-config this session", "phase": "global"}
],
"uncommitted_files": [".planning/config.json"],
"next_action": "Run /gsd-execute-phase 2 to execute the 5 verified plans. NOTE: auto-advance is now ON — execution may chain stages; interrupt if you want to inspect output between waves.",
"context_notes": "Phase 2 (calendar-display) is fully planned and verified (plan-checker PASSED iteration 2). MVP vertical-slice mode: Wave 1 foundation (schema has_rrule/is_shared + BLOCKING drizzle-kit push + dev-auth bypass + PWA vitest harness + ICS fixtures + RED stubs), Wave 2 backend slice ∥ frontend foundation, Wave 3 first real vertical slice (CalendarShell renders real events, 4 views), Wave 4 UX polish + human verify. Phase 1 already shipped (apps/api + apps/pwa monorepo). TDD was turned on AFTER Phase 2 was planned, so Phase 2 plans do NOT carry TDD gates — only Phase 3+ will. Critical correctness constraints (DST/VTIMEZONE, all-day no-shift, calendarId routing, firstDayOfWeek 0->7, has_rrule pre-filter) are baked into the plans."
}
+15 -15
View File
@@ -3,15 +3,15 @@ gsd_state_version: 1.0
milestone: v1.0
milestone_name: milestone
status: executing
stopped_at: Phase 2 UI-SPEC approved
last_updated: "2026-06-04T19:09:54.699Z"
last_activity: 2026-06-04 -- Phase 01 execution started
stopped_at: Phase 2 fully planned (5 plans / 4 waves); proceeding to execute
last_updated: "2026-06-05T13:23:49.182Z"
last_activity: 2026-06-05 -- Phase 02 execution started
progress:
total_phases: 5
total_phases: 6
completed_phases: 1
total_plans: 4
total_plans: 9
completed_plans: 4
percent: 20
percent: 17
---
# Project State
@@ -21,16 +21,16 @@ progress:
See: .planning/PROJECT.md (updated 2026-06-03)
**Core value:** One color-coded family calendar (shared + personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store
**Current focus:** Phase 01foundation-broker-spike
**Current focus:** Phase 02calendar-display
## Current Position
Phase: 01 (foundation-broker-spike) — EXECUTING
Plan: 1 of 4
Status: Ready to execute
Last activity: 2026-06-04 -- Phase 01 execution started
Phase: 02 (calendar-display) — EXECUTING
Plan: 1 of 5
Status: Executing Phase 02
Last activity: 2026-06-05 -- Phase 02 execution started
Progress: [░░░░░░░░░░] 0%
Progress: [██░░░░░░░░] 20% (Phase 1 of 5 complete)
## Performance Metrics
@@ -92,6 +92,6 @@ None yet.
## Session Continuity
Last session: 2026-06-04T18:24:20.759Z
Stopped at: Phase 2 UI-SPEC approved
Resume file: .planning/phases/02-calendar-display/02-UI-SPEC.md
Last session: 2026-06-05 (resumed)
Stopped at: Phase 2 fully planned (5 plans / 4 waves); proceeding to execute
Resume file: (HANDOFF.json consumed) — next: /gsd-execute-phase 2