docs: add deferred REQ-IDs to REQUIREMENTS traceability table

CAL-09..CAL-12 (v1.x) and DISP-01/DISP-02 (v2) were in the body but
absent from the Traceability table. v1 coverage stays 20/20; deferred
IDs listed separately. Resolves the REQUIREMENTS traceability todo.
This commit is contained in:
Lucas Berger
2026-06-10 09:26:45 -04:00
parent 7369c9f1d1
commit 497daf6add
2 changed files with 10 additions and 3 deletions
+8 -1
View File
@@ -110,13 +110,20 @@ Explicitly excluded. Documented to prevent scope creep. Anti-features sourced fr
| NOTIF-01 | Phase 5 | Complete |
| NOTIF-02 | Phase 5 | Complete |
| NOTIF-03 | Phase 5 | Complete |
| CAL-09 | v1.x | Deferred |
| CAL-10 | v1.x | Deferred |
| CAL-11 | v1.x | Deferred |
| CAL-12 | v1.x | Deferred |
| DISP-01 | v2 | Deferred |
| DISP-02 | v2 | Deferred |
**Coverage:**
- v1 requirements: 20 total
- Mapped to phases: 20
- Unmapped: 0 ✓
- Deferred (not in v1 scope): 6 — CAL-09…CAL-12 (v1.x), DISP-01/DISP-02 (v2)
---
*Requirements defined: 2026-06-03*
*Last updated: 2026-06-03traceability populated by roadmapper*
*Last updated: 2026-06-10 — added deferred REQ-IDs (CAL-09…CAL-12, DISP-01/02) to traceability table*