docs(08): create phase plan
This commit is contained in:
+13
-2
@@ -94,12 +94,23 @@ Make FamilySync configurable, administrable, and maintainable for real multi-mem
|
||||
- **--password-stdin** (Pitfall 13): `docker login` via `--password-stdin` with the token piped from a registered Gitea secret (PAT with `write:package`); never `-p $TOKEN` on the command line.
|
||||
- Hard constraints: API integration tests need a real MariaDB and live in `apps/api/tests/` (never `src/`); cache the pnpm store; Drizzle generate+migrate to set up the CI DB schema; the harness step reuses the Phase 7 specs unchanged (CI owns only the stack bring-up + readiness wait, not the spec content).
|
||||
|
||||
**Plans**: 4 plans (4 waves)
|
||||
Plans:
|
||||
**Plans**: 4 plans (4 waves)Plans:
|
||||
**Wave 1**
|
||||
|
||||
- [ ] 08-01-PLAN.md — Runner probe + operator runner/PAT registration (W0; answers the Docker-vs-host fork)
|
||||
|
||||
**Wave 2** *(blocked on Wave 1 completion)*
|
||||
|
||||
- [ ] 08-02-PLAN.md — ci.yml: fast-checks (lint/typecheck/PWA unit) + API job (MariaDB service + migrate + DB-backed tests)
|
||||
|
||||
**Wave 3** *(blocked on Wave 2 completion)*
|
||||
|
||||
- [ ] 08-03-PLAN.md — ci.yml: harness job (dev-stack bring-up + readiness waits + Phase 7 Playwright specs, both profiles)
|
||||
|
||||
**Wave 4** *(blocked on Wave 3 completion)*
|
||||
|
||||
- [ ] 08-04-PLAN.md — ci.yml: publish job (build production image + push :latest + :v1.1-<sha> via --password-stdin)
|
||||
|
||||
**UI hint**: yes
|
||||
|
||||
### Phase 9: Faster Write-Back
|
||||
|
||||
+5
-5
@@ -2,10 +2,10 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v1.1
|
||||
milestone_name: Operability & Polish
|
||||
status: verifying
|
||||
status: executing
|
||||
stopped_at: Phase 8 context gathered
|
||||
last_updated: "2026-06-11T12:50:02.415Z"
|
||||
last_activity: 2026-06-11
|
||||
last_updated: "2026-06-11T13:34:48.221Z"
|
||||
last_activity: 2026-06-11 -- Phase 08 planning complete
|
||||
progress:
|
||||
total_phases: 14
|
||||
completed_phases: 1
|
||||
@@ -27,8 +27,8 @@ See: .planning/PROJECT.md (updated 2026-06-10)
|
||||
|
||||
Phase: 8
|
||||
Plan: Not started
|
||||
Status: Phase complete — ready for verification
|
||||
Last activity: 2026-06-11
|
||||
Status: Ready to execute
|
||||
Last activity: 2026-06-11 -- Phase 08 planning complete
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
|
||||
@@ -102,7 +102,7 @@ This phase owns only the CI plumbing: workflow files, dev-stack bring-up + readi
|
||||
## Deferred Ideas
|
||||
|
||||
- **ROADMAP status fix:** ROADMAP.md line 29 marks Phase 8 "completed 2026-06-11" while line 204 says "Not started" and no Phase 8 artifacts exist. This is a bookkeeping error to correct (Phase 8 is being started now) — a docs/roadmap cleanup, not Phase 8 scope.
|
||||
- None other — discussion stayed within phase scope.
|
||||
- **Desktop e2e coverage (decided 2026-06-11):** The Phase 7 harness defines only mobile profiles (`iphone`/WebKit + `pixel`/Chromium), so Phase 8 CI gates **mobile only**. Desktop validation is wanted but deferred to a **dedicated harness follow-up phase** — it requires editing `apps/pwa/playwright.config.ts` to add a Desktop profile **and** a spec-compat pass (the existing specs assume touch + mobile viewport/layout). Phase 8 deliberately reuses the Phase 7 harness unchanged; CI will pick up the desktop profile automatically via `pnpm test:e2e` once the follow-up adds it. Track as a backlog phase.
|
||||
|
||||
</deferred>
|
||||
|
||||
|
||||