docs(08): create phase plan
This commit is contained in:
+13
-2
@@ -94,12 +94,23 @@ Make FamilySync configurable, administrable, and maintainable for real multi-mem
|
||||
- **--password-stdin** (Pitfall 13): `docker login` via `--password-stdin` with the token piped from a registered Gitea secret (PAT with `write:package`); never `-p $TOKEN` on the command line.
|
||||
- Hard constraints: API integration tests need a real MariaDB and live in `apps/api/tests/` (never `src/`); cache the pnpm store; Drizzle generate+migrate to set up the CI DB schema; the harness step reuses the Phase 7 specs unchanged (CI owns only the stack bring-up + readiness wait, not the spec content).
|
||||
|
||||
**Plans**: 4 plans (4 waves)
|
||||
Plans:
|
||||
**Plans**: 4 plans (4 waves)Plans:
|
||||
**Wave 1**
|
||||
|
||||
- [ ] 08-01-PLAN.md — Runner probe + operator runner/PAT registration (W0; answers the Docker-vs-host fork)
|
||||
|
||||
**Wave 2** *(blocked on Wave 1 completion)*
|
||||
|
||||
- [ ] 08-02-PLAN.md — ci.yml: fast-checks (lint/typecheck/PWA unit) + API job (MariaDB service + migrate + DB-backed tests)
|
||||
|
||||
**Wave 3** *(blocked on Wave 2 completion)*
|
||||
|
||||
- [ ] 08-03-PLAN.md — ci.yml: harness job (dev-stack bring-up + readiness waits + Phase 7 Playwright specs, both profiles)
|
||||
|
||||
**Wave 4** *(blocked on Wave 3 completion)*
|
||||
|
||||
- [ ] 08-04-PLAN.md — ci.yml: publish job (build production image + push :latest + :v1.1-<sha> via --password-stdin)
|
||||
|
||||
**UI hint**: yes
|
||||
|
||||
### Phase 9: Faster Write-Back
|
||||
|
||||
Reference in New Issue
Block a user