docs: start milestone v1.1 Operability & Polish
This commit is contained in:
+15
-1
@@ -8,6 +8,20 @@ FamilySync is a self-hosted, Dockerized family organization hub for a two-person
|
|||||||
|
|
||||||
The household can see and co-edit one color-coded family calendar (shared + each member's personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store, no per-member calendar credential juggling.
|
The household can see and co-edit one color-coded family calendar (shared + each member's personal) and shared lists from a single low-friction PWA — cross-ecosystem, no app store, no per-member calendar credential juggling.
|
||||||
|
|
||||||
|
## Current Milestone: v1.1 Operability & Polish
|
||||||
|
|
||||||
|
**Goal:** Make FamilySync configurable, administrable, and maintainable for real multi-member use — guided setup, in-app admin, per-event reminders, faster write-back, CI/CD, and mobile test coverage — without hand-editing env files or the database.
|
||||||
|
|
||||||
|
**Target features:**
|
||||||
|
- **Per-event reminders** — reminder selector on the event form (incl. "none"), serialized as VALARM; scheduler honors each event's lead instead of a hardcoded 15-min, and fires nothing when an event has no alarm (was backlog 999.4)
|
||||||
|
- **Admin Settings section** — role-gated UI to manage per-member Fastmail app passwords and designate the shared calendar, replacing manual DB writes (was backlog 999.10)
|
||||||
|
- **Initial setup wizard** — first-run validated bootstrap of env vars, VAPID keypair, DB connection, and first app password (was backlog 999.11)
|
||||||
|
- **Faster write-back** — event-driven outbox drain so edits land in ~1s instead of up to ~15s, preserving the optimistic-202 durability guarantees (was backlog 999.13)
|
||||||
|
- **Gitea CI** — full regression (lint/typecheck/unit/API-integration against a MariaDB service container) on PR to main + build/publish Docker image (was backlog 999.14)
|
||||||
|
- **Mobile-browser testing** — mobile viewport + authenticated PWA harness so the assistant can catch mobile-only defects (was backlog 999.12)
|
||||||
|
|
||||||
|
Deferred to backlog: self-service provider onboarding (999.5) and provider abstraction (999.1). Admin-managed credentials (999.10) partially cover the multi-member credential gap in the interim.
|
||||||
|
|
||||||
## Requirements
|
## Requirements
|
||||||
|
|
||||||
### Validated
|
### Validated
|
||||||
@@ -100,4 +114,4 @@ This document evolves at phase transitions and milestone boundaries.
|
|||||||
4. Update Context with current state
|
4. Update Context with current state
|
||||||
|
|
||||||
---
|
---
|
||||||
*Last updated: 2026-06-10 after v1.0 MVP milestone (shipped — PR #1)*
|
*Last updated: 2026-06-10 — started milestone v1.1 Operability & Polish*
|
||||||
|
|||||||
+13
-14
@@ -1,17 +1,16 @@
|
|||||||
---
|
---
|
||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v1.0
|
milestone: v1.1
|
||||||
milestone_name: milestone
|
milestone_name: Operability & Polish
|
||||||
status: Awaiting next milestone
|
status: planning
|
||||||
stopped_at: "v1.0 MVP shipped (Gitea PR #1) and archived 2026-06-10"
|
last_updated: "2026-06-10T22:50:59.197Z"
|
||||||
last_updated: "2026-06-10T21:42:55.525Z"
|
last_activity: 2026-06-10
|
||||||
last_activity: 2026-06-10 — Milestone v1.0 completed and archived
|
|
||||||
progress:
|
progress:
|
||||||
total_phases: 6
|
total_phases: 0
|
||||||
completed_phases: 6
|
completed_phases: 0
|
||||||
total_plans: 42
|
total_plans: 0
|
||||||
completed_plans: 42
|
completed_plans: 0
|
||||||
percent: 100
|
percent: 0
|
||||||
---
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
@@ -25,10 +24,10 @@ See: .planning/PROJECT.md (updated 2026-06-10)
|
|||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: Milestone v1.0 complete
|
Phase: Not started (defining requirements)
|
||||||
Plan: —
|
Plan: —
|
||||||
Status: Awaiting next milestone
|
Status: Defining requirements
|
||||||
Last activity: 2026-06-10 — Milestone v1.0 completed and archived
|
Last activity: 2026-06-10 — Milestone v1.1 started
|
||||||
|
|
||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
|
|||||||